Loading...
HomeMy WebLinkAbout74-06 - Res. County Road Project 1894MASON COUNTY COMMISSIONERS RESOLUTION NO. 7 4— 0 6 COUNTY ROAD PROJECT NO. 1894 WHEREAS, on Mason County Roads, at various locations, work defined as "construction" in the BARS Manual, Page 11-63, et seq., is determined to be necessary and proper; and, WHEREAS, this project is identified as # 2 on the officially adopted County Annual Road Program. THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to: Reconstruct Yates Road, County Road No. 36600, from M.P. 0.00 to M.P. 1.36, by installing a BST surface on the existing gravel surface. SAID WORK is to be performed by day labor in accordance with the Washington State Standard Specifications for Road and Bridge Construction as adopted by Mason County. BE IT FURTHER RESOLVED that the above -described County Road Project is necessary and proper, and the estimated costs of said project are herewith set out as follows: Engineering $ 10,000 Right -of -Way $ 20,000 Road Construction $ 168, 000 BE IT FURTHER RESOLVED, that the Chairperson is authorized to sign all pertinent documents related to this CRP, but not limited to signing of right of way plans, authorize right of way acquisition, sign plans for construction, set bid opening date and sign the contract. The County Road Project herein described is HEREBY DECLARED to be a public necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided and in accordance with WAC 136-18. ADOPTED this l 8 t h day of July , 2006 ATTEST: Rebe ca S Rogers, Clerk o the Board C: Co. Commisioners Engineer JOURNAL: Publ. 1t date: 7/ 27 DW H:OfficeManager\wp10\CRP\1894-Yates-Rd-BST-Res.doc BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON idti2 iej y da Ring Erickson 1; 1 Jayrii L. Kamin, Commissioner lJ i Naar S Tim Sheldon, Commissioner