Loading...
HomeMy WebLinkAbout53-06 - Res. County Road Project 1879COMMISSIO C� Ni A S NERS HY ROA N C UN u L� LUTO N N O: 5 3- 0 6 OJ FC�� N o: 1879 WC= R S, or Masor Co cityRoad Non 90100, O0, knowi loca hi as the Shelto i Matlock Brady Road, and more specified y ocated the SSE. 1/4 of Section 24, 123NL R4W, WM, a: the approximate rr e post fisted oelow; won defined as "construction" in the BARS Manual, Page r I -63, et seq, is ceterrnined to oe necessary and proper; and, tha 7RbFORr, BE i t i is their intentions to: oLV J 3Y THE 3 P co N CoMMI►SSIO\ FRS Stab ize and halt the erosion of the Goldsborough ree< east bank it oteM co preserve the Shelton Matlock Brady Road, Goldsborouc►h Creek Bridge east abutment- near MP 1 038 SAID WORK is to be performed by day labor/contract in accordance with Washington State Standard Specifications for -wad a fid Bridge ConstL, ction as adopted oy Mason County BE IT FUR T rIER ESOLLvFD that the described County Roac Project is necessary and proper, and the estimated costs of said project re th set Engineering Right of Way Construction $tOnOOO $1,OOOo $joosjoco La: as folows: The County Road project herein described in HEREBY DECLARED to be a public necessity, and the County Road Engineer is ' IEREBY ORDERED AN AUTORIZED to report and proceed thereon as by law, provided and in accordance with WAC 136-18. ADOPTED this 6 t h day of June , 2006. AT BOARD OF COUNTY COMMISSIONERS MASc N yOUNTY, WASHINGTON / 41i'1/tiLLk flvt4 U'o LAY-l[ RING ERICKSC,V, Chair JAYII L. KAMIN, Com issioner '•••••ir-�.._1. EST: '1M SHELDON, Commissioner (2efieetla Rebecca S. Rogers, Clerk of the Board Cc: Co. Commissioners Engineer Journal: Publ. It. 6/ 1 5/ 0 6