HomeMy WebLinkAbout53-06 - Res. County Road Project 1879COMMISSIO
C�
Ni A S
NERS
HY ROA
N C
UN
u L�
LUTO N N O: 5 3- 0 6
OJ FC�� N o: 1879
WC= R S, or Masor Co cityRoad Non 90100, O0, knowi loca hi as the Shelto i
Matlock Brady Road, and more specified y ocated the SSE. 1/4 of Section 24, 123NL
R4W, WM, a: the approximate rr e post fisted oelow; won defined as "construction" in
the BARS Manual, Page r I -63, et seq, is ceterrnined to oe necessary and proper; and,
tha
7RbFORr, BE i
t i is their intentions to:
oLV
J 3Y THE 3
P co
N
CoMMI►SSIO\
FRS
Stab ize and halt the erosion of the Goldsborough ree< east bank it oteM co
preserve the Shelton Matlock Brady Road, Goldsborouc►h Creek Bridge east abutment-
near MP 1 038
SAID WORK is to be performed by day labor/contract in accordance with Washington
State Standard Specifications for -wad a fid Bridge ConstL, ction as adopted oy Mason
County
BE IT FUR T rIER
ESOLLvFD that the described County Roac
Project is necessary
and proper, and the estimated costs of said project re th set
Engineering
Right of Way
Construction
$tOnOOO
$1,OOOo
$joosjoco
La: as folows:
The County Road project herein described in HEREBY DECLARED to be a public
necessity, and the County Road Engineer is ' IEREBY ORDERED AN AUTORIZED to
report and proceed thereon as by law, provided and in accordance with WAC 136-18.
ADOPTED this 6 t h day of June , 2006.
AT
BOARD OF COUNTY COMMISSIONERS
MASc N yOUNTY, WASHINGTON
/
41i'1/tiLLk flvt4 U'o
LAY-l[ RING ERICKSC,V, Chair
JAYII L. KAMIN, Com issioner
'•••••ir-�.._1.
EST: '1M SHELDON, Commissioner
(2efieetla
Rebecca S. Rogers, Clerk of the Board
Cc: Co. Commissioners
Engineer
Journal: Publ. It. 6/ 1 5/ 0 6