Loading...
HomeMy WebLinkAbout49-06 - Res. County Road Project 1874UT,G=t EEC , S, on Masor defined as "construction° on the and, 1 nIE intention to: A.S, this D- o td c u O k U u' �r ASk Cc o „ k Y OU1HStLira N %oJ A, D) DDRO,,taN NO. 49—C6 County Major Collector Roads, Function Class Of, at varitus locations, work BARS MaUal, Page l0-63, et sea, os cetermined to be recessar y and orooer; ect os identified oed as _on the officially adopted County A : F 1 BY Tilt f� O G= COUNTY C nval Road Program OSSOoNERS that it is tneir Reconstruct the shouOders, ditches, side slopes and clear zone on the S} elton MacK Road, County Road 90100, from MP 0.00 to MP 12 24, i.r accordance with the Ortersectoor and Corridor Safety P' grerr S AO) W* R}( os to be petrified by day labor / contract in accordance with the WashongtState Stanoard Specifications for Road and Bridge Construction as adopted by Mason County. H' O 1i F U R TrikR RC SOT,VE f that the above -described County Road P�ro'ect is necessary and proper, and the estimated costs of said pro:ect are herewith set out as follows: engineering Right -of -Way Road ConstrL ction $ 40,000 -0o -0- BE 7 FUIR 1--{Ei RESOLVED, that the Chairperson is authorized to sign all pertinent documents related to CRP, but not limited to signing of rig it of way Mans, authorize right oway acquisition, sign pans for construction, set pid opening date and sign the contract. his The County Road Project herein described is HEREBY ®FCLARED to be a public necessity, and the County Road Engineer is HERY OR®. - RED AKD ALI 1 0 RCZ;E to report and proceed thereon as by law, prow oed and in accordance wish WAC 136- `0. ADOPTED this 6 t h clay of June , 2006 ATTEST: /, 4 /fit /1 Rebecca S . Rogers, Clerk of the'Board C: Co. Commisioners Engineer JOURNAL: Publ. It date 6 / 15 / 0 6 BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON da Ring Erickson, C ► air Jayni L.. ISbmin, Commissio er ekietict_d Tim Sheldon, Commissioner Km H: Office Managerlwp 1 O\CRP\1874-Safety-Improv-Shelton-Matlock-Res.doc