HomeMy WebLinkAbout49-06 - Res. County Road Project 1874UT,G=t EEC , S, on Masor
defined as "construction° on the
and,
1 nIE
intention to:
A.S, this
D- o
td
c u
O k
U u'
�r ASk Cc o „ k Y
OU1HStLira N
%oJ A, D) DDRO,,taN
NO. 49—C6
County Major Collector Roads, Function Class Of, at varitus locations, work
BARS MaUal, Page l0-63, et sea, os cetermined to be recessar y and orooer;
ect os identified oed as _on the officially adopted County A
: F 1 BY Tilt
f� O G= COUNTY C
nval Road Program
OSSOoNERS that it is tneir
Reconstruct the shouOders, ditches, side slopes and clear zone on the S} elton MacK Road, County
Road 90100, from MP 0.00 to MP 12 24, i.r accordance with the Ortersectoor and Corridor Safety P' grerr
S AO) W* R}( os to be petrified by day labor / contract in accordance with the WashongtState
Stanoard Specifications for Road and Bridge Construction as adopted by Mason County.
H' O 1i F U R TrikR RC SOT,VE f that the above -described County Road P�ro'ect is necessary and proper,
and the estimated costs of said pro:ect are herewith set out as follows:
engineering
Right -of -Way
Road ConstrL
ction
$ 40,000
-0o
-0-
BE 7 FUIR 1--{Ei RESOLVED, that the Chairperson is authorized to sign all pertinent documents related to
CRP, but not limited to signing of rig it of way Mans, authorize right oway acquisition, sign pans for
construction, set pid opening date and sign the contract.
his
The County Road Project herein described is HEREBY ®FCLARED to be a public necessity, and the County
Road Engineer is HERY OR®. - RED AKD ALI 1 0 RCZ;E to report and proceed thereon as by law, prow oed
and in accordance wish WAC 136- `0.
ADOPTED this 6 t h clay of June , 2006
ATTEST:
/, 4 /fit /1
Rebecca S . Rogers, Clerk of the'Board
C: Co. Commisioners
Engineer
JOURNAL: Publ. It date 6 / 15 / 0 6
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY, WASHINGTON
da Ring Erickson, C ► air
Jayni L.. ISbmin, Commissio er
ekietict_d
Tim Sheldon, Commissioner
Km H: Office Managerlwp 1 O\CRP\1874-Safety-Improv-Shelton-Matlock-Res.doc