HomeMy WebLinkAbout21-06 - Res. County Road Project 1872COIF
MASON COUNTY
M1TSSII ON ERS RESO LUK=ON NO
COUNTY RO k D PROJECT NO. 872
WThERHAS9 on Yason County Road No 294609 known focalilly as the Jlsllaad View Road, arrd
more speciiflealllly lloeated in Sec. 22, •211h, R2W9 WM9 at the approximate rnflle posts ffsted beow;;
work defined as "cortstriet!orL" fin the BARS Manual', Page 111=639 et sec!, is determined to be
rrieeessarry and proper; and,
WEIERE S9 this project fis rdentrfred as # 5 on the officfiallfly adopted County Annual] Road
Program.
I IHIERIEFO.E9 BE
that fit rs their intention to:
RESOLVED BY THE 1 iO k RD OF COUNTY COIN I SSIIONERS
Remove the existing 6foot diameter concrete cross cullvert and rerpllacce with a new fish
nassa bfe eullve: to
Work to be Derr r ormed between approximate mllllepos,s: DOM and 0.96.
SAIl1M WORK is to be performed by day fla:bor/contract fin accordance wit�r Washington State
Standard Specifications for Road and Bridge Construction as adopted by Mason County. The
contract may be awarded by the South P ige l Sound Sallmmon Innaiicemment Group.
BE IIT FURTTTER MIA SM A/ED that the described County Road -Project is necessary and
proper9 and the esama ed costs of said project are herewith set out as Lolillows:
Engineering:
5.000
Right at Way: $8.000
Cor
straicirion: $440,000 e:
rile South ftget Soarnd Saimmon 1Knhancemment Group wflllll reimburse 05% o
construction cost.
The County Road project herein described in HEREBY DECLARED to be a publlic
necessity, nd the County Road Erzghareer° is HERE IX ORDERED AND AUTHORIZED to report
and proceed thereon as by llaw, provided and fir accordance with WAC 136-18
a�.
ADOiPrTIV) this day} of --
ATTEST:
Clifietra
Clerk of the Board
cc: Co. Commissoorraerrs
.Erfllgkneerr
JOURNAL: Pubflo Ito :13fithtit 1(1410(e
2006
BOARD OF COUNTY COMMISSIONERS
MASQpi COUNTY, WASHINGTON
1%, Le1-4,
1' A RING ERIC Chairersomr
YNI L. KAMIIN, Commissioner
'I
ITV SIEW
DON, Commissioner
km
h:\wp\crrp\U$72=CRIPo4siland- newaroRes0doc