Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
12-06 - Res. Revised Annual Construction Program
RESO iJ ijh N NO. 2 =06 Rev5seel AnnazL Const uctioir !Tograim WI.HIE!' AS9 Chapter 136 6 WAC, sets forth the procedures Por the adoption of he nr ua J Conslsuction Program, an WHEREAS, in comp-iance therewith, the board of Co- my Commissioners has held a public hearing or the Annual Construction Program this 21 st day of February, 20O6 NOW T'�-1 I �1R FOR n 9 BE FIT RESOLVED by the Board of Mason County Commissioners, in regular session assemEed, that the a' ached Revised Annual Constriction Program for 2006 be adopted as set chitin detai , consis ti g of w errs No's 1 through t 9, which are incorporated and made par' o 'Weis I'' esoLuion. AOP'ED this 1st day of ATTEST: ebr ary, 20O6 }dCjiri REBECCA S. ROGERS of the board VED A3SI TO ®RM: • ICHEAL CLIF Deputy Prosecuting Attorney cc: Cmmr Public Works General Services County Road Admin. Board WSDOT/TransAid BOARD OF COUNTY COMMMISSIONERS MASON COUNTY, WASHINGTON inida sc NDA RING iF,RIC && ON, C QJkv iairperson L. IN9 Commissioner StQa„ TIM SHEITLDON9 Commissioner Robinb H: wp101 exaAnnuall Resod oc ANNUAL CONSTRUC`�JD fit; ROG 1U� FOR 2C0 6 DAY LABOIR CONSTRUCTUO N: > $1000's : (A) TOTAL CONS T=,CT110N PROGRAJVvi o columns (14•) (15) (B) COAFPLITED DAY ..ABO ti Ll1IT lT (see instructions) (C) TOTAL DAY ABOR CONS DR G mn (15) ** $6,179 $927 $277 Line (C) must be smaller than Line (B) ** AGENCY ACTION: COUNTY > Current Population: DATE RECOMMENDED FROG. SUBMILTED DATE OF ENVIRONMEN T A. ASSESSMENT DATE OF FHA, ADOPTION ORDINANCE/RESO.UTION NO. DATE OF GE IDMENT Mason 51,900 December 1, 2005 December 6, 2005 118-05 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) 1 (16) ESTIMATED EXPENDITURES H F' SOURCES OF FUNDS _J , ALL IN $1000's p z lc*w NAME o ROAD/PROJECT o c� RIGHT CONSTRUCTION z ROAD AND LOCATION w COUNTY OTHER FUNDS 2 \l 0 (7) ENGRING PRELIM. (1000's) 595.10 595.20 (1000's) WAY OF CONTRACT (000's DAY 0©0's) LABOR ALL GRAND TOTAL 595. RK ( a w LOG 1 w FUNDS U p ~ et AMOUNT PROGRAM NO. (Include brief termini description cz Bridge #) z SOURCE ® or MP's; Q (1000's) (1000's) IA 1 10 13 11 35 10 22 18 1 1 1 7 7 18 10 3 5 7 6 5 7 3,000 1,000 119 493 156 138 420 120 252 83 98 23 100 100 77 3,000 1,025 120 100 110 500 176 155 473 135 284 84 99 92 23 01 1 AC Paving COUNTY WIDE PROJECTS 91720 Johns Prairie Rad MP 0.51 to MP 1.02 0.51 16 D E 1 83 CAPP 91720 Johns Prairie Road MP 1.77 to MP 2.50 0.73 07 D E 1 119 CAPP 2.18 0.60 07 D E 0 99 CAPP 98250 Old Belfair Highway MP 1.58 to MP 02 2 62400 BST Rasor Paving Rd - 2 Snot M P 0.00 to MP 2.36 2.36 09 D E 100 03 3 Var Countywide Safety lmprovemenis Var Var FGH E 110 04 Countywide Major CoII. Safety Improv. Var 07 G E 500 STP Traffic Walkways Control - Bikeways - Drainage - Guardrail - Clear Zones - 05 4 Var County Wide If 4.1 rr Construction Var Var I E 92 Belfair Street MP 0.00 to MP 0.11 0.11 09 D E 23 Resurfacing, drainage, sub -base, 06 5 02230 intersection Bridge Beeville & Rd Large and sight Culvert distance Construction improvements MP 2.09 0.20 09 K E 72 104 SRFB 07 10430 Wivel Rd 0.20 09 K E 95 60 USFWS/SRFB 08 23910 Agate Rd - Malaney Creek - SPSSEG 0.20 07 K E 181 292 State -Other 09 23910 Agate Rd - Uncle John's Creek 0.20 07 K E 135 10 59090 Creekside ROADS & Drive :RIDGES (ConsiTucfuon) _ 0.20 09 K E 284 11 6 96140 Grapeview Loop Road - 3 MP 3.50 TO 6.93 3.43 07 ABD E 2,310 690 RAP 12 7 14010 Skookum Creek Bridge 0.02 08 I E 225 800 BIA Old Olympic Highway MP 0.42 to 0.44 136 61 5,902 277 6,376 PAGE ONE TOTALS, CONSTRUCTION 3,629 2,747 CRAB FORM #3, REVISED 08/05 6YP D6 Version l 1/26/06 Page 1 of 2 constprgm06r2.xls (1) w 2 z DAY LABOR CONS T RUC ANNUAL C 1ON: —D (A) TOTAL CONSTRUCT1ON ROGRMW lurnns (14)-(15) (B) COMPUTED DAY LABOR _=ORB T (see 5nstructaons) C) Tali A DAY =ABOR CONST PROGRART coiumn (15) (2) (3) ROAD LOG NO. (4) ROAD/PROJECT NAME AND LOCATION (Include brief termini description or MP's; Bridge #) S0000Ms $69179 NSTRUC NOTNI FROG $927 $277 * Line (C) must be smaller than Line (B) ** (5) U IJJ 0 (Miles) (6) ItttC O z U LL (7) WORK CODE(S 13 14 15 16 17 18 8 9 10 11 12 13 n/a 15420 70390 91720 96140 96140 79800 Var ROADS & BRIDGES (PE & RAN 0 Lynch Rd/US 101 - Simmons Road North Shore Road Erosion Repairs Iy) Johns Prairie Road MD 2.52 to 3.45 McLane Cove Bridge Grapeview Loop Road MP 2.41 to 2.45 Grapeview Loop Road - 2 MP 1.61 to 3.50 Bear Creek Dewatto Road MP 7.59 - 10.00 Misc Engineering & R/W Costs 2.00 Var 0.93 0.04 2.39 2.41 Var 09 08 07 07 07 08 n/a PAGE TWO TOTALS, CONSTRUCTION PROGRAM TOTALS, CONSTRUCTION WAC 136-16-035, MAINTENANCE ABDH K ABD 1 ABD ABD G E E E E E E E (9) (10) HOR 200: SOURCES OF FUNDS AGENCY ACTION: COUNTY> Current Populatuon: DATE RECOMMENDED PROGO SUBMUTi 1i ED DATE OF ENVIRONMENT AL ASSESSMEN DATE OF FINA� ADO°'"IO,N ORDINANC z/RIFSOLJTION NO. DATE OF AYENDMEN (12 Mason 51,900 December 1, 2005 December 6, 2005 118-05 (13) 1 (14) ; (15) (16 ESTIMATED EXPENDITURES COUNTY FUNDS (1000's; OTHER FUNDS AMOUNT (1000's) PROGRAM SOURCE 25 88 30 177 50 150 500 112 45 State STP(R) BR RAP STP(R) 520 657 ALL IN $1000's PRELIM. ENGRING 595.10 (1000's) OF WAY 595.20 (1000°s 250 25 200 75 126 50 150 250 51 8761 301 CONSTRUCTION CONTRACT (1 000's) DAY LABOR (1000's) GRAND TOTAL ALL 595. I 3,4041 1,012 J 362 5,902 7,553 4,149 277 3,915 CRAB FORM #3, REVISED 08/05 6YP D6 Version 1/26/06 - Page 2 of 2 constprgm06r2.xls