HomeMy WebLinkAbout122-07 - Res. Amending Res. 27-06 County Road Project 1873 Bear Creek Dewatto RoadMASON COUN II4
COMI ISS IH ONERS RESO_U` ION NO: I I V 67
I`�ENIIMMlNG RESO :JUT ON 27=06
CCOUR` Y ROAD PRO,. IEC`r` NO. 11873
WEER AS9 can Nilson County Road No 798009 ,anown llocailly as the Bear Creek Dewatto
Road, and more specifically located in Sec032[ 124N9R2W9WM9 at the approxima' e mille posts Fisted
bellow; work defined as "construction" in the BARS Ma mall, :Page 11 =63, et seg9 is deterr_nfined o be
necessary and proper; and,
WHEREAS, this pro:ect is iclenti ied as #5 on the officiailly adopted County Six=Year
`I �ransinortation Improvement Program.
}EII EFORE9 BE II`: RESOLV T 1) BY THE BO kRD OF COUNTY COMB]ISSIIO ERS
hat it is their intention to:
S
Remove the existing 6=toot by 8=foot oval cullvert and repllace with a new thirty$ fve= oot
concrete arch cuiverto Work to be per`norrmed at mileposts: 90390
1 W01..K is to be performed by contract in accordance with Washington State Standard
SneciLicatioas for Road and Bridge Construction as adored by Masora County.
�T ITT FUR"' _ER f' SOLVED t�eiat the described County load Project is necessary and
',Groper, and the estimated costs of said project are herewith set out as follows:
This project wilt be (partially
Engineering: $I1.5 000
light of Wayo $ 8,000
Construction: $2609000
ended by a gran'
rom the United State Fish and WiIldii
e Service.
he County Road project herein described in HEREBY DECLARED to be a public
necessity, and the County Road Engineer is IHIERE3Y ORDERED AND .kU` MICR 7ED to report
and proceed thereon as by 1aw9 provided and in accordance with WAC 136=1I80
ADOPTED this day of �i ;, yid , .� :' 2007
ATTEST:
2-e)
Rebe&a S. '` ogers9 Clink f the Board
cc: Co. Commissioners
Engineer
J O :JRN L Pubio I t: Zit
BOARD OF COUNTY COMM ISSTO \ ERS
MASON COUNTY„` JASU4NGTON
try L I= �----
Y T► A RING ERICSON9 Chair
TIIM SHELDON, Commissioner
OSS GALLAGEommissioner
I:\Zoren\PW-1873-Bear Creek DewattoRevision.Res.doc