Loading...
HomeMy WebLinkAbout47-07 - Res. County Road Project 1902COM1Y COw\ '� IV g S O N CmO�--vL ITT 11 Y SSfON RS' RESO `dUr,IO NO: TV RO kD PROJECT NOo 1.902 WHERE &S9 on M25o111 CCournxty Roads No. 4f780, krnowrr_ llocarfly as the PURDY CC =OFF ROAD, and more specfsfccafly llocated in Sec. 13, 14, 229 & 23,nN 21 1 `9 RW 4 W9 WI , at the approximate mile posts Il➢seed bellow; work defined as "coristrructiorr_" fill the BARS Mamiail9 Page 111= 63, et seq, is determined to De necessary and proper; and, Ws_ Program. ERE S9 this project is identified as # 1 on the o -Tidally molted Corral T JPREFORE9 BE that it IlS their intention to: I" RIESOIV D y ArrrrrnizaIl Road Y 711E BOARD OF COUNTY COMMISSIONERS Repair the existfing roadway sLrface by applying erg al asphalt concrete overlay to the existing roact9 including associated iavemeritr markfirng and iardraii work f:om 1VJP 0000 to MP 2.77. SAID WORK is to be Iper forr➢-ned by day, labor/contract accordarce With Washing on State Standard Specci- icatiors for Road and Bridge Cons ruction as adolp'ed by Mason County. proper, and T F TJR 11 JF ER I(EKS011 Nip „hat the descrfi bed County Road Project is necessarry sire the estimated costs of said project are herewith set out as follows: Engineering $209000 Right o - Way $o Construct➢oi o $860 000 to County Road project Therein described in HE p &EPY DECLARED to be a p necessity, and the County Komi Engineer is HE EBY ORDERED AND AUTHO'LZ and proceed t:iereon as by law, provided and in accordance With WAC 136= :8 ADOPTE ?I t =nfis • '11"111ESTo \C-7 15th day 0 RiEEBECCCA So ROGE,RS9 Clerk o 1 9 2007 e./fAt...; the Board cc: Co. Commissioners Engineer JOURNAL: Pubflo 11 : 5/- 7/07 3 _ llc o report BOARD OF COUNTY COMMISSIN1H, S MA N COUNTY, WAS L INGTON DA RING ERI TIM SHE DONS Com _SC Chai loner SS GALLAGHER, missioner 1.\7.oren\PW-1902-CRP - Purdy Cut Off Rd.doc