HomeMy WebLinkAbout47-07 - Res. County Road Project 1902COM1Y
COw\
'�
IV g S O N CmO�--vL ITT 11 Y
SSfON RS' RESO `dUr,IO NO:
TV RO kD PROJECT NOo 1.902
WHERE &S9 on M25o111 CCournxty Roads No. 4f780, krnowrr_ llocarfly as the PURDY CC =OFF
ROAD, and more specfsfccafly llocated in Sec. 13, 14, 229 & 23,nN 21 1 `9 RW 4 W9 WI , at the
approximate mile posts Il➢seed bellow; work defined as "coristrructiorr_" fill the BARS Mamiail9 Page 111=
63, et seq, is determined to De necessary and proper; and,
Ws_
Program.
ERE S9 this project is identified as # 1 on the o -Tidally molted Corral
T JPREFORE9 BE
that it IlS their intention to:
I" RIESOIV D
y ArrrrrnizaIl Road
Y 711E BOARD OF COUNTY COMMISSIONERS
Repair the existfing roadway sLrface by applying erg al asphalt concrete overlay to the existing
roact9 including associated iavemeritr markfirng and iardraii work f:om 1VJP 0000 to MP 2.77.
SAID WORK is to be Iper forr➢-ned by day, labor/contract accordarce With Washing on State
Standard Specci- icatiors for Road and Bridge Cons ruction as adolp'ed by Mason County.
proper, and
T F TJR 11 JF ER I(EKS011 Nip „hat the descrfi bed County Road Project is necessarry sire
the estimated costs of said project are herewith set out as follows:
Engineering $209000
Right o - Way $o
Construct➢oi o $860 000
to County Road project Therein described in HE p &EPY DECLARED to be a p
necessity, and the County Komi Engineer is HE EBY ORDERED AND AUTHO'LZ
and proceed t:iereon as by law, provided and in accordance With WAC 136= :8
ADOPTE ?I t =nfis
•
'11"111ESTo
\C-7
15th day 0
RiEEBECCCA So ROGE,RS9 Clerk o
1 9 2007
e./fAt...;
the Board
cc: Co. Commissioners
Engineer
JOURNAL: Pubflo 11 : 5/- 7/07
3
_ llc
o report
BOARD OF COUNTY COMMISSIN1H, S
MA N COUNTY, WAS L INGTON
DA RING ERI
TIM SHE DONS Com
_SC
Chai
loner
SS GALLAGHER, missioner
1.\7.oren\PW-1902-CRP - Purdy Cut Off Rd.doc