Loading...
HomeMy WebLinkAbout43-07 - Res. County Road Project 1901CS M M SSI© N MAS COUNT`( HRS R \TYR PR N WHEREAS, On Mason County -\oad No. 43100, krowc te� po arHy as the New Campus Access Road, and more specifically located in the as Ha r of the Nortwest Quarter and the 'cast dalf of the Northeast Quarter of Section 2, T ownsnip 20 Not, Range West WM, near the intersection of State Route 102 and State Route 10:; wo defined as "construction" in the BARS Vanua , Page IIm63, et seq, is de:erni red to be necessary and proper; a d, Ti ER F C R E, 3E IT R that it is their intention too _.VED BY T JlhL7 B R D OF CO U N -1� COMIv SSIONE Construct a new county maintained road to allow access to the new Facility and M aonterance Shop. 0 \S Jblic works SAID WORK is to be performed by day aboiconLoact in accordance with washingto� State Standard SIecftications for Road and Bridge Construction as adopted by Masor County. BE F FUR HE RESO_.kcD tnat the descibed County load Project is necessary and proper, and the estimated costs of said project are herewith se: ou: as follows: Engineering Right of Way Construction s n 51000 o $ 10,0000 $ a 150, 000 The County Road project herein described in HEREBY DECLARED to be a public necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided and in accordance with WAC 136-18. ADOPTED this riciincv da of A0n « 2007. ,s ATTEST: i (( BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON Ufa ��rr") A RING ER1 SON, Chair F�- �� TIM SHELON, Commissioner Rebecca So Rogers, Clerk of the Boa F R, Co m issioner Cc: Co. Commissioners Engineer Allan Eaton Rick Blake ROW Km: H:\WP 1 0\OfficeManager\CRP\ 1901 -Const.of New Road-Res.doc