HomeMy WebLinkAbout2022-059 - Res. County Road Project 2042 Shelton Valley Road MASON COUNTY
COMMISSIONERS RESOLUTION NO: W22-0501
COUNTY ROAD PROJECT NO. 2042
WHEREAS,on Mason County Road No. 05930, known locally as the Shelton Valley Road
and more specifically located in Sec.27 T.20N, R 4W,WM at approximately mile post 1.94 to mile
post 2.06; work defined as"construction" in the BARS Manual,Page II-63,et seq, is determined to
be necessary and proper; and,
THEREFORE,BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS
that it is their intention to:
Removing the existing undersized culvert to improve fish passage and increase safety by reducing
roadway flooding concerns.
SAID WORK is to be performed by Contract and/or County Forces in accordance with Washington
State Standard Specifications for Road and Bridge Construction as adopted by Mason County
(RCW 36.77.020 and/or RCW 36.77.065 and WAC 136-18).
BE IT FURTHER RESOLVED that the described County Road Project is necessary and
proper,and the estimated costs of said project are herewith set out as follows:
Engineering: $ 45,904
Right of Way $ -0-
Construction $ 513,096
The County Road project herein described in HEREBY DECLARED to be a public necessity,and
the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed
thereon as by law, provided and in accordance with RCW 36.75.050,36.80.080 and 36.80.070.
ADOPTED this \V-day of 2022.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY,WASHINGTON
002TA-
Kevin Shutty,Chair
ATTEST:
Sha on Try sk,Vice Chair
McKenzie StMth,Clerk of the Board
Rand eatherl1 Commissioner
APPROVED AS TO FORM:
Tim Whitehea , .
Deputy Prosecuting Attorney
cc: Co.Commissioners
Engineer
JOURNAL: Publ. It: 9/22/2022