HomeMy WebLinkAboutBLD2021-01818 Final Add Bathroom - BLD Permit / Conditions - 3/2/2022 Mason County
Mason County - Division of Community Development
frs �, 615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
BLD27HEATED
ADDITION OR REMODEL-
RESIDENTIAL
PROJEC ADDING A BATHROOM, CONVERTING ISSUED: 03/02/2022
EXISTINAGE TO BONUS ROOM.
SITE AD : SUNSET HILL RD SHELTON EXPIRES: 08/29/2022
PARCEL: 221341290040
APPLICANT: SCHAAF JUDITH A OWNER: SCHAAF JUDITH A
1030 E SUNSET HILL RD 1030 E SUNSET HILL RD
SHELTON, WA98584 SHELTON,WA98584
360-432-5877
CONTACT: Mike Holten
4010 22nd St SE
PUYALLUP,WA98374
VALUATIONS: FEES: Paid Due
Project Valuation (BID, 2669.94 $2,669.94 State Fee-Residential $6.50 $0.00
ESTIMATION..) Technology Surcharge $7.12 $0.00
Plan Check Fee $80.00 $0.00
Plumbing Base Fee $25.00 $0.00
Mechanical Fees $29.00 $0.00
Building Permit Fee $156.00 $0.00
Mechanical Base Fee $30.00 $0.00
Plumbing Fees $36.00 $0.00
Change in Tenant- Minor EH $120.00 $0.00
Plan Review
Total: $2,669.94 Totals : $489.62 $0.00
FIXTURES
(sty Mechanical Fixtures (sty Plumbing Fixtures
1.0000 Spot Vent Fan(s) 1.0000 Bathroom Sink
1.0000 Ductless Heat Pump 1.0000 Number of Showers
1.0000 Number of Toilets
Printed by:Genie Mcfarland on:03/02/2022 01:49 PM
Page 1 of 4
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton,WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
ADDITION OR REMODEL- RESIDENTIAL BLD2021-01818
(Qt Plumbing Fixtures
1.0000 Number of Water Heaters and or Vent
REQUIRED INSPECTIONS
Rough- Plumbing Inspection BLD-Final Inspection
Mechanical Inspection
CONDITIONS
* A minimum of 75 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in accordance
with IECC/WSEC Section R404.1.
* The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not
allowed without the approval of the Mason County Fire Marshal.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* All changes to"approved"building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
* Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of
3000 psi (IRC Table R402.2).
Printed by:Genie Mcfarland on:03/02/2022 01:49 PM
Page 2 of 4
Mason County
I � Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
ADDITION OR REMODEL- RESIDENTIAL BLD2021-01818
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
* Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer
specifications and in accordance with IRC Section R315.
Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level
of the dwelling.
EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations (including addition or alteration of
fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or
created.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED",they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* All property lines shall be clearly identified at the time of foundation inspection.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
Printed by:Genie Mcfarland on:03/02/2022 01:49 PM
Page 3 of 4
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
ADDITION OR REMODEL- RESIDENTIAL BLD2021-01818
OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site
plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
* All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this
proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION.
* To perform an inspection the Mason County Building Inspector will need to access the interior of the structure. An
electrical permit completed and approved by Washington State Labor& Industries must be available on-site during the
inspection.
The Mason County Building Inspector will inspect the following: Verify that the system is installed in accordance with
manufacturer specifications;The inspector will check to make sure that the exterior unit is permanently installed and
supported, the exterior unit complies with required setbacks to property lines, fuel tanks are located at least 10-ft from the
system, a source of ignition,all exterior penetrations are properly sealed,condensate lines are installed and are properly
supported, including proper material, slope, and that the condensate line terminates to a proper location outside of the
foundation, copper refrigerant lines are insulated with '/z"thick continuous closed-cell foam insulation or better, indoor units
are located at least 3-ft from smoke and carbon monoxide alarms,and that modifications made to the structure, to install the
unit, does not affect existing structural members.
* The upper floor is reviewed and approved as a bonus area, NOT to have sleeping or cooking. If sleeping or cooking is
added additional permitting including a Flre Sprinkler System is required.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Autho a Agent: Date:
Printed by:Genie Mcfarland on:03/02/2022 01:49 PM
Page 4 of 4
MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352
m�
BELFAIR:360-275-4467,EXT 352
Building,Planning,Environmentdi Ilealtfi,Community lleal h ELMA:360-482-5269,EXT 352
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY** www.co.mason.wa.us
To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php
Permit Number BLD2021-01818 Date Issued 03/02/2022 Issued By
Project Adding a bathroom,converting existing heated storage to bonus room.
Site Address 1030 E SUNSET HILL RD
Applicant SCHAAF JUDITH A
Contractor
Contractor Phone
Primary Code 2015 IBC,IRC,IFC,IEC,IMC,& Type
UPC yp
Permit Type ADDITION OR REMODEL- Occupancy
RESIDENTIAL p y
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.**
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building
Department Building Official: Community Services Designee
Concrete Setbacks Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing ee 22
Groundwork Mechanical Plumbing c/ -2
Groundwork Gas Pipe Mechanical ���y/ZZ J a
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building •2 'ZZ l7 —
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other