Loading...
HomeMy WebLinkAbout03-08 - Res. County Road Project 1904MASITT COUNTY COMM SS ONF,RS RESOI , T'EON NO: 03-0 g CCO U NYY ?WAD PROJECT O. 1904. WHEREAS, on Mason County Road No. 39630, 1known locally as the North ffsiarS Drive, and more specifically flocated in Sec. 279rN9 21 RW 9 2 WM, at the approximate mice posts'listed bellow; work defined as "construction" in th BARS Vanuai, Page 1I-639 et sec, is determined to be necessary and proper; arnd9 WHEREAS, his project is Mend IPrograHrno ied as # 5 on the o tidally adopted Comity uai Road T1 THTE I*.FORI9 BE IT II RESOI NED BY IIJHTE BOARD OF COUN that it is their intention too COMWIITSSIIWNIERS Remove and replace the existirg corrugated sled ©divert wiitJi fish 1passalbie culvert. Work to be perribrme al of proximate mileposts: 2.85 and 2.97 SAIIB WORK is to be performed by day =arbor/contract hi accordance with Washington State Standard Speci: ica`Wions for Road an© Bridge Construe ion as adopted by Mason County. BE III` FURTHER RT,SOLVED that the described Col proper, and the estimated costs of said project are Engineering Right of Wv'ay my Road Project is necessary and ,lerewit s set out as 'ell S209000 S 110,000 Construe' ion S4$$4,9000> S394,000 of construction costs is t:o be reimbursed by the Salmon Iecove 7 FLnding Board. The Coal sty Road project herein described in IHIERIE Y DEC AA3IED to be a pi 3llic necessity, and the County Road Engineer is HIEREI- " ORDERED AND AU I HORfZED t:o rreport and proceed thereon as by iaw9 provided and in accordance with WAC -1136418. AID GIP ATTEST: ED L ;Ills 8° day of January, 2008 Cal /l �rx R SECCCA So ROGERS, CCierr cc: o-e the Board Co. Commissioners Engineer JOURNAL: PaubL 11: ij/=0/08 H:\Office Managei\WP 1 0\CRP\ 1 904-RES. doc BOARD OF CCOUN`:Y CCOMMIISSIION dRS S N COUNTY, WASHINGII ON ILISsomer- ecTm uana. TIM SHELDON, Chair R dttr, D'A RING ERICK3ON 9 CComr.issioner SS GALLAGHER, CCo urnissionerr