Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
02-08 - Res. County Road Project 1905
MASON COUNTY COMM SSONIERS RESOLUTION NO: 02..0 COUN Y ROAD PROJECT NO. 1905 J)1_ERREAS, on I`[ason County Road No. 97500,, known llocalllly as the Bell afrr `ThL_uya Road, and more sped icaLy llocated in Sec. 32, Y "ITT 23, RW, 2 WY9 at the approximate mille posts �fisted bellow; work defines as "coRstrraction" in the 3 kRS I`�arrnall9 Page J1lT0639 et sec', is c eterrnined to be necessary and proper; and, WHEREAS, this project is not fdentilled as part Road IPrograrrn the floss ® the bridge eras e resuilt or a rant that fit is '.RERRETORIE 9 BTR heir intention to: T RESOLVED YTjIk; me officially adopted County Annuall l rail dfsaster9 CARD OF COUNTY CCOMWTIISSIION!H RS Repllace the bridge that conveys the Bellfahrr Yahuya Road over the TahLya River. Wor=� to be performed at amroxi mate rrmllleposts: got© and 8.25. SAIIB WORK is to be performed by day tabor/contract fin accordance with Washington State Standd rd Specfiflcations for Road and Bridge Construction as adopted by Yason County. 73IE proper, and T 'FURTHER TI HER RESOLVED that the described County Road Pr©: ect is necessary and the estimated costs oT said protect are herewith set out as follows: Engineering $t 5O,000 1ght 0f Way $2 0,000 Corr struction: $2,600,000 The County Road project herein described fin HEREBY DECO , kRED t© be a public necessity, and the County Road ,nghrreer is HEREBY BY ORDERED AND AUTIHIOII II?ED to report and proceed thereon as by 11aw9 provided and an accordance with W kCC 13648 DOPTIKD this 8th day of „anuary9 2008 BO A RI D OF COUNTY CCOYMIISSIIONERS MASON CCO .JNY9 W SHL GT'ON Il ATTEST: REBE A S. ROGERS, Cller of the Board cc: Co. Com ran issio errs Engineers JOURNAL: Publ. 11t: 1/10/08 M SIHIE LDOI a, 9 flair *DA RING CC SON9 Corn m Ilssfloner 4 OSS GALLAGHE3, ' mmissfonerr H:\Office Managei\WP10\CRP\1905-Belf-Tah-Rd-Bridge-Res.doc