Loading...
HomeMy WebLinkAbout106-09 - Res. Six-Year Transportation Improvement ProgramRESoLUTToN No. loc" -oq Six year Transportation Improvement Program WHEREAS, in compliance with V/.A.C. 136-15 Mason County has prepared the attachment Six Year Transportation Improvement Program for the period January 1, 2010 through December 31,2015; and, WHEREAS, in compliance with R.C.W. 36.81.121 and V/.A.C. 136-l4,the Board of Mason County Commissioners hereby certifies that the priority arcay of potential projects on this County's road system, including bridges, was prepared by the County Commissioners during the preparation of the said Six Year Transportation Improvement Program; and, \üHEREAS, in the further compliance with said law, the Board of County Commissioners has held a public hearing on this l't day of December 2009; NOW, THEREFORE, BE IT RESOLVED by the Board of Mason County Commissioners, in regular session assembled, that the attached Six Year Transportation Improvement Program for 2010 through 2015 be adopted, consisting of item No's I through 33, which are hereby incorporated and made part of this Resolution. BE IT FUTHER RESOLVED that the County Engineer is hereby directed to distribute copies of the Six Year Transportation Improvement Program for 2010-2015 to all required agencies. ADOPTED this 1't day of December 2009. BOARD OF COUNTY COMMISSIONERS MASON COI]NTY, WASHINGTON G s¿At* TIM SHELDON, Chair Community Development County Road Admin. Board WSDOT l' A RING ERICKSON, Commissioner (1) All dollar figures ¡n thousânds (2) PE = Preliminary Enginæring (3)RW= RightofWay (4) Constr = CE + Construct¡on (5) CE = Construction Eng¡neer¡ng 6.YEAR TIP PROGRAM 2010.2015 APPROVED BY TIP.CÂP Datê of Final Approvat: APPROVED BY BOARO OF COUNTY COMMISSIONERS Hearing Date: Date of F¡nalAdoption: - Resolut¡on Number PRþR]rY 2010 PE RW Constr 2010 2011PE RW Constr ¿v-t¿ PE RW Cônstr 2013 PE RW Coßtr ¿u"t+ PE RW Consfr 2015 PE RW Constr Project Total zo09 2l)10 lProiecf B¡'P \L;POverlays (mâintenanc(94'9C l,ZQt 1.4 r,4u(1.2 Jbl 3b,lt 601 1t tioi t¡60(tiol 1T 60(3,ð53(maintenanc(1¡201 1!201 4 4 úrnor L;onst 33 J5r 21 2'l zul 21 201 21 :/f.Jl 1,86iaroeL;Ulvefts lmãinlênânce 113 2Í 3(1l :J0t 3r 3Ur 3(4 1At 5.2 5.2 Jefia¡r layhua tsridoe R(u.t6 tf 5(6{ 5.3 v Lmp Road Stide b.u5 IT 45í 4ð 5.4 5 tand Htil Roâd stide 4.tu 1t 58{b1 1,22( 1,871 55 .owelEllendâhl Pass Rd R 0.00 1.ðr 17(9J 6 {onn Snore Road Ercs¡on Repaiß var val ,ohns Pra¡rie Rd 3.45 tt(1,1.1 a 1.61 3.50 3:10,421 56r 1('t u(tg 2,OO( 8.1 4.1 Clearinq and Grubbino 6.2 Road Construction v I /.59 10.oo 1(1O2i 46(5l:1(5(, to'J,49t(.leanno and Gnrtrb¡no 9.2 9.2 Road Construct¡on rU r0 )averCreek Br¡dqe Const o.tig 22!J(5 1.UU(6U 2.34t1tynch Rd / SR 10'f lmDrcvements u.0()1. 12 4.5U 15_5()&5'l 40(2,651 370¡ 1ø, t3 2!40{ 14 'l.73 2a 20(5{15 15 I lNorth lsland Dr- I 4\2l 3(3(z,uu(ltt -i:-{1 40(1t 2.1U 2,65(#lMatlock Bradv Road - Phæe I I ti(f3t 1.311 3(6ı(1 loi J(65 øt æi 38r 21 3( 2J t(l22 10t 23 24 24 23.53 5.2325 ,(l ¿6 l0(38i 38!?7 I OOt 28 3Ân.a l(3Els! ãã¡ 5ı¡ 5ã¡ 38¡ 51.( 3 n.a 1(30 \¡ewkirk Road Extens¡on n.a.1(1 eelwriqht Street n.a nà 2032ade Skæt n )ßon süeet I n.â. I n.â.1(lof 2U Page I