HomeMy WebLinkAbout106-09 - Res. Six-Year Transportation Improvement ProgramRESoLUTToN No. loc" -oq
Six year Transportation Improvement Program
WHEREAS, in compliance with V/.A.C. 136-15 Mason County has prepared
the attachment Six Year Transportation Improvement Program for the period January 1,
2010 through December 31,2015; and,
WHEREAS, in compliance with R.C.W. 36.81.121 and V/.A.C. 136-l4,the
Board of Mason County Commissioners hereby certifies that the priority arcay of
potential projects on this County's road system, including bridges, was prepared by the
County Commissioners during the preparation of the said Six Year Transportation
Improvement Program; and,
\üHEREAS, in the further compliance with said law, the Board of County
Commissioners has held a public hearing on this l't day of December 2009;
NOW, THEREFORE, BE IT RESOLVED by the Board of Mason County
Commissioners, in regular session assembled, that the attached Six Year Transportation
Improvement Program for 2010 through 2015 be adopted, consisting of item No's I
through 33, which are hereby incorporated and made part of this Resolution.
BE IT FUTHER RESOLVED that the County Engineer is hereby directed to
distribute copies of the Six Year Transportation Improvement Program for 2010-2015 to
all required agencies.
ADOPTED this 1't day of December 2009.
BOARD OF COUNTY COMMISSIONERS
MASON COI]NTY, WASHINGTON
G s¿At*
TIM SHELDON, Chair
Community Development
County Road Admin. Board
WSDOT l'
A RING ERICKSON, Commissioner
(1) All dollar figures ¡n thousânds
(2) PE = Preliminary Enginæring
(3)RW= RightofWay
(4) Constr = CE + Construct¡on
(5) CE = Construction Eng¡neer¡ng
6.YEAR TIP PROGRAM 2010.2015
APPROVED BY TIP.CÂP
Datê of Final Approvat:
APPROVED BY BOARO OF COUNTY COMMISSIONERS
Hearing Date:
Date of F¡nalAdoption:
-
Resolut¡on Number
PRþR]rY 2010
PE RW Constr
2010 2011PE RW Constr
¿v-t¿
PE RW Cônstr
2013
PE RW Coßtr
¿u"t+
PE RW Consfr
2015
PE RW Constr
Project
Total
zo09 2l)10 lProiecf B¡'P
\L;POverlays (mâintenanc(94'9C l,ZQt 1.4 r,4u(1.2 Jbl 3b,lt 601 1t tioi t¡60(tiol 1T 60(3,ð53(maintenanc(1¡201 1!201
4 4 úrnor L;onst 33 J5r 21 2'l zul 21 201 21 :/f.Jl 1,86iaroeL;Ulvefts lmãinlênânce 113 2Í 3(1l :J0t 3r 3Ur 3(4 1At
5.2 5.2 Jefia¡r layhua tsridoe R(u.t6 tf 5(6{
5.3 v Lmp Road Stide b.u5 IT 45í 4ð
5.4 5 tand Htil Roâd stide 4.tu 1t 58{b1 1,22(
1,871
55 .owelEllendâhl Pass Rd R 0.00 1.ðr 17(9J
6 {onn Snore Road Ercs¡on Repaiß var val
,ohns Pra¡rie Rd 3.45 tt(1,1.1
a 1.61 3.50 3:10,421 56r 1('t u(tg 2,OO(
8.1 4.1 Clearinq and Grubbino
6.2 Road Construction
v I /.59 10.oo 1(1O2i 46(5l:1(5(, to'J,49t(.leanno and Gnrtrb¡no
9.2 9.2 Road Construct¡on
rU r0 )averCreek Br¡dqe Const o.tig 22!J(5 1.UU(6U 2.34t1tynch Rd / SR 10'f lmDrcvements u.0()1.
12 4.5U 15_5()&5'l 40(2,651
370¡
1ø,
t3 2!40{
14 'l.73 2a 20(5{15 15 I lNorth lsland Dr- I 4\2l 3(3(z,uu(ltt -i:-{1 40(1t 2.1U 2,65(#lMatlock Bradv Road - Phæe I I ti(f3t 1.311
3(6ı(1 loi
J(65
øt
æi
38r
21
3(
2J
t(l22
10t
23
24 24 23.53
5.2325 ,(l
¿6 l0(38i
38!?7 I OOt
28 3Ân.a l(3Els!
ãã¡
5ı¡
5ã¡
38¡
51.( 3 n.a 1(30 \¡ewkirk Road Extens¡on n.a.1(1 eelwriqht Street n.a nà 2032ade Skæt n
)ßon süeet I n.â. I n.â.1(lof 2U
Page I