HomeMy WebLinkAbout108-10 - Res. County Road ProjectsRESOLUTION No.: lÒ8 -rc
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF MASON COUN'trY, \ilASHINGTON.
In the matter of initiating county road projects and assigrring CRP numbers.
IT IS I{EREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed thereon as by law
provided. (RCW 36.7 5 .050, 3 6.80.080, 3 6.80.070) (Optional References).
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineers estimates are hereby made in
the and for the shown:
(4) TYPE OF WORK CODE
A. Grading & Draining
B. Base & Top Course
C. Bituminous Surface Treatment (BST) / Seals
D. A.C. /P.C.C. Pavement
E. Curbs and Gutters
F. Sidewalks
ADOPTEDthi Ll auy
Engineer
JOIIRNAL: Publ. lt: 12l30/l O(Bill Public Works)
G. Traffrc Facilities
H. Paths & Trails Bikeways
I. Bridges
J. Ferry Facilities
K. Environmental Mitigation
L. Fish Passage
(5) The construction is to be accomplished by contract
in accordance with RCW 36.77.020 et. seq.
(6) The construction is to be accomplished by county
forces in accordance with RCW 36.7'1 .060 and
wAC 136.18.
BOARD OF COLINTY COMMISSIONERS OF
010.
amount
(l)(2)(3)(4)(s)(6)(7)(8)(e)
ITEM
ROADNAMEAND/OR
BRIDGENUMBER
ROAD LOG
NUMBER MP TO MP
TYPE OF WORK
(see codes)
c
o
N
T.
COUNTY
FORCES
cosr ESTIMATE (THOUSANDS)
ENG'R. CONSTRUCTION
FEDERAL LOCAI
ANNUAL
CONST.
PROG.
ITEM
NO.
CRP
NO.
I All County Roads
(Sign Placemen! as needed)
G x 3 50 3
t946
2.All County Roads
(Culvert installations, as needed)
A X 38 4,5 t947
J All County Roads
(Wetland mitigation, as needed)
A X l1 4 1948
4.All County Roads
(Guardrail placement, as needed)
G X 4 4 3,4 1949
H:\Office Manaser\WP10\CRP\Annual -Countv-Wide CRP T.isf\COIINTY-WTDF-CRPS 201 I .rtoc