HomeMy WebLinkAbout107-10 - Res. County Road Project 1945 Star Lake DriveMASON COUNTY
COMMISSIONERS RESOLUTION NO: |OVT O
CoUNTY RoAD PROJECT NO. I9{5
WHEREAS, on Mason County Road No. @known locally as the $!4þþ[þ, and
more specifically located in Seq. 8. T19 N, R 5W, WM, at the approximate mile posts listed below;
work defined âs "construction" in the BARS Manual, Page II-63, et seq, is determined to be
necessary and proper; and,
WHEREAS, this project is identified as #2 on the officially adopted County Annual Road
Program.
THEREF'ORE, BE IT RESOLVED BY THE BOARD OF'' COUNTY COMMISSIONERS
that it is their intention to:
Apply two shots of BST (Bituminous surface treatment) at approximately milepost 2.398 to
2.621 ('Iotal mileage 0.223, approx. 1,115 feet) on Star Lake Drive to connect both paved ends of the
road.
SAID WORK is to be performed by County Forces in accordance with Washington State Standard
Specifications for Road and Bridge Construction as adopted by Mason County.
BE IT FURTHER RESOLVED that the described County Road Project is necessary and
proper, and the estimated costs of said project are herewith set out as follows:
Engineering: $ -0-
Right of Way $ -0-
Construction $ 22,500
The County Road project herein described in HEREBY DECLARED to be a public
necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report
and proceed thereon as by law, provided and in accordance with RCW 36.77,065 et. seq. and WAC
f36-18.030 et. seq.
ADOPTED ttris 2J day of December 2010.
Co. Commissioners
Engineer
JOURNAL: Publ.lt:
DY, Clerk of the Board
BOARD OF COUNTY COMMISSIONERS
, WASHINGTON
T_ st-a'1--
Monty
TIM SHELDON, Commissioner