Loading...
HomeMy WebLinkAbout41-11 - Res. County Road Project 1961 Purdy Cut Off RoadMASON COUNTY COMMISSIONERS RESOLUTION NO: 4-14--1 COUNTY ROAD PROJECT NO. 1961 WHEREAS, on Mason County Road No.41780, known locally as the Purdy Cut Off Road and more specifically located in Sec. 13 & 14, T 21 N, R 4 W, WM, from approximately mile post 0.84 to mile post 2.37; work defined as "construction" in the BARS Manual, Page II-63, et seq, is determined to be necessary and proper; and, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to: Remove all slide material and debris from the culverts and ditches and the roadway at approximately six (6) sites along the road and rebuild the eroded shoulders. SAID WORK is to be performed by County Forces in accordance with Washington State Standard Specifications for Road and Bridge Construction as adopted by Mason County. BE IT FURTHER RESOLVED that the described County Road Project is necessary and proper, and the estimated costs of said project are herewith set out as follows: Engineering: $ 2,000. Right of Way $ -0- Construction $ 13,000. The County Road project herein described in HEREBY DECLARED to be a public necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided and in accordance with RCW 36.77.070 et. seq. ADOPTED this 5th day of July 2011. BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON /6;04G/tin /A /74 Ly daiRing Erickson, . it ATTEST: Shannon Goudy, Clerk of the Board erry K. Lingle, Commission APPROVED AS TO FORM: Tim Whitehead, Deputy Prosecuting Attorney cc: Co. Commissioners Engineer JOURNAL: Publ. lt: 7/1411 OfficeManager h:\wp\crp\ 1961 CRP -Res. doc 9