Loading...
HomeMy WebLinkAbout19-11 - Res. County Road Project 1952 Upgrade Warning SignsMASON COUNTY COMMISSIONERS RESOLUTION NO: COUNTY ROAD PROJECT NO. 1952 WHEREAS, on the Mason County Roads listed below be improved as shown between the points indicated. WHEREAS, this project is identified as # 3 on the officially adopted County Annual Road Program THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to: Upgrade warning signs from 30" to 36" and improve reflectivity. SAID WORK is to be performed by County Forces and/or Contract in accordance with Washington State Standard Specifications for Road and Bridge Construction as adopted by Mason County (RCW 26.77.065 and/or RCW 36.77.060). BE IT FURTHER RESOLVED that the described size and reflectivity upgrade of warning signs for the Mason County Run -Off and Intersection Safety Project is necessary and proper, and the Mason County Road Number, Road Name, and location of said project are herewith set out as follows: Road No. Road Name Number of Signs Section, Township & Range @ BOP 15500 Lynch Road 12 Sec. 8, T. 19 N., R. 3 W., W.M. 15830 Cole Road 10 Sec. 32, T. 20 N., R. 3 W., W.M. 91100 Arcadia 6 Sec. 29, T. 20 N., R. 3 W., W.M. 79800 Bear Creek Dewatto Road 47 Sec. 4, T. 23 N., R. 2 W., W.M. 97500 Belfair Tahuya Road 25 Sec. 22, T. 22 N., R. 3 W., W.M. 00110 Boundary Road West 5 Sec. 19, T. 19 N., R. 6 W., W.M. 10000 Cloquallum Road 12 Sec. 30, T. 20 N., R. 3 W., W.M. 76690 Dewatto Holly Road 47 Sec. 6, T. 23 N., R. 2 W., W.M. 76080 Dewatto Road 31 Sec. 2, T. 22 N., R. 3 W., W.M. 80610 Elfendahl Pass Road 39 Sec. 3, T. 22 N., R. 2 W., W.M. 96140 Grapeview Loop Road 22 Sec. 10, T. 21 N., R. 2 W., W.M. 39190 Harstine Island Road North 2 Sec. 14, T. 20 N., R. 2 W., W.M. 31110 Harstine Island Road South 4 Sec. 14, T. 20 N., R. 2 W., W.M. 04450 Highland Road 25 Sec. 18, T. 20 N., R. 4 W., W.M. 14880 Kamilche Point Road 2 Sec. 20, T. 19 N., R. 3 W., W.M. 52210 Mason Lake Road 40 Sec. 3, T. 20 N., R. 3 W., W.M. 97671 McReavy Road 26 Sec. 32, T. 22 N., R. 3 W., W.M. 39630 North Island Drive 25 Sec. 3, T. 20 N., R. 2 W., W.M. 70390 North Shore Road 24 Sec. 1, T. 22 N., R. 2 W., W.M. 20111 Parkway Boulevard 2 Sec. 21, T. 20 N., R .3 W., W.M. 28850 Pickering Road 14 Sec. 29, T. 21 N., R. 2 W., W.M. 41780 Purdy Cut Off Road 14 Sec. 22, T. 21 N., R. 4 W., W.M. 90100 Shelton Matlock Road 18 Sec. 24, T. 20 N., R. 4 W., W.M. 05930 Shelton Valley Road 3 Sec. 22, T. 21 N., R. 4 W., W.M. 41640 Skokomish Valley Road 11 Sec. 22, T. 21 N., R. 4 W., W.M. 70670 Tahuya Blacksmith Road 19 Sec. 4, T. 23 N., R. 2 W., W.M. 62310 Trails Road 9 Sec. 23, T. 22 N., R. 2 W., W.M. $43 per post $54 per sign material $38 per sign labor $25 vehicle TOTAL 494 21,242 26,676 18,772 12,350 Total Cost $79,040 The County Road project herein described in HEREBY DECLARED to be a public necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided and in accordance with RCW 36.77.020 et. seq. ADOPTED this day ofINCCLAL , 2011. ATTEST: APPROVED AS TO FORM: Tim Whitehead, Deputy Prosecuting Attorney BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON nida- I In/ Lynda Ringyrickson, Chair K. Lingle, Corti issioner Tim Sheldon, Commissioner cc: Co. Commissioners Engineer JOURNAL: Publ. lt: / Z (/2011 OfficeManager h:\wp\crp\CRP2011 SafetyGrantProj ects\1952-CRP-Res. doc