COMMISSIONERS RESOLUTION NO.: 08
COUNTY ROAD PROJECT NO.: 1829-R
WHEREAS, on Mason County Road No. 41640 , known locally as the Skokomish Valley Road , and
more specifically located in Sec. 16, T21N, R4W, WM; , M.P. 1.70 to M.P. 1.88, work defined as "construction" in
the BARS Manual, Page II-63, et seq, is determined to be necessary and proper; and,
WHEREAS, this project is identified as # 14 on the officially adopted 2011 Annual Construction Program.
THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention
to:
Perform engineering and right of way for the realignment and construction of the Hunter Creek Bridge replacement.
SAID WORK is to be performed by Contract in accordance with the Washington State Standard
Specifications for Road and Bridge Construction as adopted by Mason County.
BE IT FURTHER RESOLVED that the above described County Road Project is necessary and proper, and the
estimated costs of said project are herewith set out as follows:
Engineering
Right -of -Way
Road Construction
$ 336,500.
$ 45,000.
$ 1,824,736.
The County Road Project herein described is HEREBY DECLARED to be a public necessity, and the County Road
Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided and in
accordance with RCW 36.77.020 et. seq.
ADOPTED this 15th day of February , 2011.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY, WASHINGTON
2
1
fait
Clerk: the:•ard
APPROVED AS TO FORM:
rat-
��--�
-16.n
Tim Whitehead, Deputy Prosecuting Attorney
cc: Co. Commissioners
Engineer
JOURNAL: Publ. it.: 2/15/11(Bill Rd. Dept.)
Adel
A RING ERIC,,KCON, Chair
Y K. L ' GLE. Commis ' • ner