Loading...
HomeMy WebLinkAbout03-11 - Res. County Road Project 1950 North Shore Road to Repair and Stabilize Slide Areat14 Chair rry K. Lingle, Comm toner ATTEST: ere Clerk of the Board MASON COUNTY COMMISSIONERS RESOLUTION NO: 03--q/ COUNTY ROAD PROJECT NO. 1950 WHEREAS, on Mason County Road No.70390, known locally as the North Shore Road, and more specifically located in Sec. 20, T22 N, R 3W, WM, at the approximate mile posts listed below; work defined as "construction" in the BARS Manual, Page 11-63, et seq, is determined to be necessary and proper; and, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to: Repair and stabilize slide area. Work to be performed at approximate mileposts: 18.04. SAID WORK is to be performed by Contract in accordance with Washington State Standard Specifications for Road and Bridge Construction as adopted by Mason County. BE IT FURTHER RESOLVED that the described County Road Project is necessary and proper, and the estimated costs of said project are herewith set out as follows: Engineering:$ 25,000. Right of Way $ 0 . Construction $ 175 000. The County Road project herein described in HEREBY DECLARED to be a public necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided and in accordance with RCW 36.77.020 et. seq. ADOPTED this 11 th day of January, 2011. BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON Tim Sheldon, Commissioner APPROVED AS TO FORM: 2 ice; .);r- 3 2-6; / Tim Whitehead,Deputy Prosecuting Attorney cc: Co. Commissioners Engineer JOURNAL: Publ. lt: 1/20/11 OfficeManager h:\wp\crp\1950-CRP-Res.doc