HomeMy WebLinkAbout03-11 - Res. County Road Project 1950 North Shore Road to Repair and Stabilize Slide Areat14
Chair
rry K. Lingle, Comm toner
ATTEST:
ere
Clerk of the Board
MASON COUNTY
COMMISSIONERS RESOLUTION NO: 03--q/
COUNTY ROAD PROJECT NO. 1950
WHEREAS, on Mason County Road No.70390, known locally as the North Shore Road, and
more specifically located in Sec. 20, T22 N, R 3W, WM, at the approximate mile posts listed below;
work defined as "construction" in the BARS Manual, Page 11-63, et seq, is determined to be
necessary and proper; and,
THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS
that it is their intention to:
Repair and stabilize slide area. Work to be performed at approximate mileposts: 18.04.
SAID WORK is to be performed by Contract in accordance with Washington State Standard
Specifications for Road and Bridge Construction as adopted by Mason County.
BE IT FURTHER RESOLVED that the described County Road Project is necessary and
proper, and the estimated costs of said project are herewith set out as follows:
Engineering:$ 25,000.
Right of Way $ 0 .
Construction $ 175 000.
The County Road project herein described in HEREBY DECLARED to be a public
necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report
and proceed thereon as by law, provided and in accordance with RCW 36.77.020 et. seq.
ADOPTED this 11 th day of January, 2011.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY, WASHINGTON
Tim Sheldon, Commissioner
APPROVED AS TO FORM:
2 ice; .);r- 3 2-6; /
Tim Whitehead,Deputy Prosecuting Attorney
cc: Co. Commissioners
Engineer
JOURNAL: Publ. lt: 1/20/11
OfficeManager h:\wp\crp\1950-CRP-Res.doc