Loading...
HomeMy WebLinkAbout20-12 - Res. County Road Project No. 1969 North Shore RoadM kSON COU\ I Y COMMIISSIONE -ZS RESOLD ON ITS 2 0 12— COUI :Y ROAD PROJECNO. 1969 WHEREAS, on Mason County oad No. 70390, known locally as the North Shore Road and more specifically located iSec. 1, T. 22 N, 'm 2W, WY, at approximately mile post 3047 ; work defied as "construction" in the BARS Manu .1, Page 639 et seg9 is determined to De necessary and proper; and, WHEREAS, this project is identified under item #5 o Road Program. {n the ficial;y adopted County Annual THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNr:Y CCOMMIISSIONERS hat it is their intention to: Remove the existing undersized Little Mission Creek culvert with a larger culvert to reduce creek overflow over the county roadway. SAID WORK is to be performed by Contract and/or County Forces in accordance with Washington State Standard Specifications for Road and Bridge Construction as adopted icy Mason. County. (RCW 36.77.060 and/or RCW 26 77.065) BE IT FURTHER RESOLVED that tie described County < oad Projec proper, and the estimated costs of said project are herewith set out as follows: Engineering: $ 50,000 Right of Way $ 20,000 Construction $400,000 lls aecessa y and The County Road project herein described in HEREBY DECLARED to be a public necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided and in accordance with RCW 36 77.070 et. seq. ADOPTED this ' 1 day ofi 1 ��6012. Y ATTEST: APPROVED AS TO FORM: 1 Tim Whitehead, Deputy Prosecuting Attorney cc: Co. Commissioners ngbbeer �TO ATFJ: FIRM. _ t� 0 BOARD OF COUNTY COMMISSIONE '< S MASON COUNTY, WASHINGTON IA ilk. G inErickson, C Ly ; g / C.� S Lester(4 - Tim Sheldon, Commissioner n Bloomfield, Conmi s oner