Loading...
HomeMy WebLinkAbout71-13 - Res. Bridge LimitsRESOLUTION NO. 11 -13 BRIDGE LIMITS WHEREAS, in conformance with procedures adopted by the Washington State Association of Counties, and in the interest of safety, Mason County makes periodic inspections of bridges on the County Road System; and, WHEREAS, inspection and evaluation of Mason County bridges was completed and reported in the 2013 Bridge Inventory Report; and WHEREAS, such inspection has determined that four (4) bridges of Mason County's fifty-eight (58) bridges cannot be certified as safe for all legal highway loads, and, WHEREAS, one (1) bridge of Mason County's fifty-eight (58) bridges has suffered structural deterioration requiring the two lane bridge to be reduced to one (1) lane with traffic lights for traffic control and, NOW, THEREFORE, BE IT RESOLVED, that the lane limitations, closure and load limits be posted to control traffic on the bridges, as listed below, for a period of one (1) year, unless the Board shall, by appropriate action based upon proper certification, modify or remove such restrictions. Max No. of Maximum Bridge No. Bridge Name Load Limit Lanes Speed Limit 10290-035 Hliboki Bridge Bulb Farm Rd. 10510-0.23 Gosnel Creek Bridge Bolling Road 11070-0.15 Eich Road (1) Bridge Eich Road 11070-0.26 Eich Bridge Eich Road 1 1 1 1 *416400176 Hunter Creek Bridge Reduced to one (1) 1 20 Skokomish Valley Road lane bridge NOW, THEREFORE, BE IT FURTHER RESOLVED, that the County Engineer shall post the said bridges as listed with the lane limits and load limits, as set forth herein. Violation of these limits shall constitute a misdemeanor in accordance with RCW 36.75.270. DATED this 17th day of December 2013. A iT- ST: MINDI BROCK, Clerk of the Board APPROVED AS TO FORM: f/ Tim Whitehead, Ch. Deputy Prosecuting Attorney BOARD OF COUNTY COMMISSIONERS MASON COUNTY, W • SHINGTON RANDY NEATHERLIN, Chair sLtaena TIM SHELDON, Commissioner TERRI JEFF '. :iC _ C ,i issioner * Note- Load Restrictions not applicable to school buses and emergency vehicles cc: Public Works Sheriff Prosecutor H:1Office Manager\WP 10\BRIDGES\Bridge 20 14 \BRIDGE-LIMITS-RES 14. doc