HomeMy WebLinkAbout15-13 - Res. County Road Projects 1976 to 1981RESOLUTION NO: / t 13
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY, WASHINGTON.
In the matter of initiating County Road Projects and assigning CRP numbers.
IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed
as by law provided. (RCW 36.75.050, 36.80.080, 36.80.070) (Optional References).
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineers estimates
are hereby made in the amount and for the purposes shown:
Item
6-Year
Item No.
2 1
3 1
4 1
5 1
6
7
8
9
10
11
12
Road No.
Road Name
M.P
Type of
Work
See Code)
50810 Shelton Springs Road 0.00-0.88 i
97671 McReavy Road 1.03-2.56
04450 Highland Road
1.99-4.65 1 D
Cont.
County
Forces
D
X
X
90100 Shelton -Matlock Road 11.45-13.45; D X
98250 Old Belfair Highway 2.25-3.89 T D X
62310 Trails Road
A. Grading & Draining
(1) (2) (3) (4)
(7) TYPE OF WORK CODE
F. Sidewalks
B. Base & Top Course
C. B.S.T. / Seals
D. A.C./P.C.C. Pavement I. Bridges
E Curbs and Gutters J. Ferry Facilities
ADOPTED this day of March, 2013
G. Traffic Facilities
1.44-3.34 D X
-1
J
Imams
Local
5
45
85
64
38
52
Cost Estimate (Thousand $)
FED
(5) (6) (7) (8)
K. Environmental Mitigation
L Fish Passage
H. Paths, Trails, Bikeways
ATTEST:
Sh u on oudy, Clerk o e Board
APPROVE : S TO FORM:
.�.. a._.
eeeer
Tim Whitehead, Ch. Deputy Prosecuting Attorney
cc: Commissioners
Engineer
JOURNAL: Publ. It: '
!a
(Bill Rd Dept.)
(9)
30
287
542
409
243
333
1..845
Engr
R/W
Const
10 25
17 315
17 610
18 455
18 263
20 365
100
0
2,033
(10) (11) (12) (13)
Section, Township, Range
Sec. 12, T20, R4
Sec. 5&8, T21, R3
Sec. 24,25,&26, T20, R5
Sec. 3,4,8,&9, T20, R5
Sec. 17,16,&9, T23, R1
Sec. 23,26,34,&35 T22, R2
(7) The construction is to be accomplished by contract
in accordance with RCW 36.77.065 et. seq.
(8) The construction is to be accomplished by county
forces in accordance with RCW 36.77.060 and WAC 136.18
BOARD OF COUNTY COMMLSSIONERS
MASON COUNTY, WASIINGTN
RANDY NEATHERLIN, Chair
TIM SHELDON, CQmmissioner
TEJEFFREYS C omurnaissioner
(14
CRP No.
1976
1977
1978
1979
1980
1981
C
2,133