Loading...
HomeMy WebLinkAbout56-14 - Res. Six-Year Transportation Improvement Program (TIP)RESOLUTION NO. Six year Transportation Improvement Program WHEREAS, in compliance with Chapter 136-15 WAC, Mason County has prepared the attachment Six Year Transportation Improvement Program for the period January 1, 2015 through December 31, 2020; and, WHEREAS, in compliance with RCW 36.81.121, the Board of Mason County Commissioners hereby certifies that the priority array of potential projects on this County's road system, including bridges, was prepared by the County Engineer during the preparation of the said Six Year Transportation Improvement Program; and, WHEREAS, in the further compliance with said law, the Board of County Commissioners has held a public hearing on this leday of October 2014; NOW, THEREFORE, BE IT RESOLVED by the Board of Mason County Commissioners, in regular session assembled, that the attached Six Year Transportation Improvement Program for 2015 through 2020 be adopted, which are hereby incorporated and made part of this Resolution. BE IT FUTHER RESOLVED that the County Engineer is hereby directed to distribute copies of the Six Year Transportation Improvement Program for 2015-2020 to all required agencies. ADOPTED this � `i day of ter 2014. ATTEST: IF, ALMANZOR, lerk of the Board APPROVED AS TO FORM: TIM WHITEHEAD, Ch. Deputy Prosecuting Attorney cc: Commissioners Public Works Community Development County Road Admin. Board WSDOT BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON JEFFC TIM SHELDON, Commissioner RANDY NEATHERLIN, Commissioner E E L 0) 0 L a_ 4-J c 0 0 0 L 0. E c ct L 0 0) 0 4) y. yd CD 0 46-41 r E 0 L LL 0 U 0 5 E z 0 U 0 0 0 O M Y u O C Z < 0 -�>.�� s T To q a) w a. 0 E co N O U m m W F- W W CD O O Expenditure Schedule (Local Agency) 4th thru 6th 1801 2874 N O M 501 20l o CO (O 750 30 In r N o (') 180' (0 cco N o N -O O 0 c0 O up (!) 100� O u) 4) 500 N(O 958 co 00 500] 0 0um) 0 m O C 350i V' N 109 O" O N 20 W" Lc)N O f) �" o O CD N O 100 " O 1 40 O 1601 „N PE 1/1/2015 STP 52 8 60 RW CN 6/1/2015 STP 828 129 957 TOTALS 880 137 1017 0 0 0 cO N 00 0 0 0 u) N CO Cl_r a a 0000 2 2 2 r0r N N N r 0 0) wiz Cl. CC 0 TOTALS HSIP 250 2501 O u) to r CO O N (O CO wiz 0_ EC U `TOTALS 100 100 0 0 0 N r O 0 0 O N r 0 Wiz 0 00 'TOTALS 130 130' 0 0 0 0' r (O O 0 0 V •'- c0 rr u� N N N r 0 0 Wiz 0 010 TOTALS 210 210 PE 1/1/2015 45 45 RW 9/1/2015 15 15 CN I A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name of Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done HMA Overlays Rd. No.: Various From: MP various To: MP various Total 2015 Project Cost $ 1,D17,000 Countywide Safety Grant - Highway Safety Improvement Program Rd. No.: Various From: various To: various .Total 2015 Project Cost $ 250,000 MISCELLANEOUS Total 2015 Project Cost $ 100,000 COUNTY WIDE CULVERTS Total 2015 Project Cost $ 130,000 Carman Road Culvert Rd. No.: 08810 - Carman Rd North Replace existing culvert with a new structure Total 2015 Project Cost $ 210,000 Homer Adams Road Culvert Rd. No.: 00610 - Homer Adams Road Replace existing culvert with a new structure Total 2015 Project Cost $ 60,000 ®EM 0 0 0 0 co m 0 0 O Ea m m 10 E E ro N L E 0 y O o a O U Qa a` m 0 0 y c E On m m O m ? 'j C .1 c" EF-0a m E a_ m a s E._ 0 0 Q c >, `m E O t- a u r o m� m aar ca ca N Et it N a (n ~ s m E a = ~Q m 1 ~ F- ' CC I a CO 0H z < 0 O N 0 N 0 [O CU D 0) 0 c c = 0 m E = Q 4.1 0 U c 0 0 a) E Z 0 U 0 c z Q MPCl/RTPCT Federally Funded' Projects Only �2a >m °- lc- a),-; N 5 a Li I- W 0 0 Expenditure Schedule (Local Agency) 4th thru 6th -O co 4001 400I 0. co M 0 M co N H 280 -0 c N 0 t,-- 20 0 O 0 ❑) 201 O h - CO 'Cr O N 0 (O 'n_ N N V N� co O 0 o O O 0 w co N 2665 RW 4/1/2015 25 25 CN 7/15/2015 RATA 230 239 469 TOTALS RATA 276 269 545 PE 5/1/2015 RATA 9 1 10 RW CN 7/15/2017 RATA TOTALS RATA 9 1 10 PE 5/1/2015 RATA 9 1 10 RW CN 7/15/2017 RATA TOTALS RATA 9 1 10 o .- a) Q Q f- I- a to Or O N N 1 L ^ d EC O (TOTALS RATA 9 1 10 cn O co N O co a) O 0 Q ID m N N M d rY U TOTALS BRAC 2060 605 2665 PE RATA 96 11 107 RW 3/1/2015 85 85 CN 5/1/2016 RATA Federal Cost by Phase 1116ual 19101 I .,-- o Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name of Number E Beginning MP or road - Ending MP or road F. Describe Work to be Done CRP 1969 Little Mission Creek Culvert Rd. No.: 70390 - North Shore Rd From: MP 3.47 To: MP 3.49 Replace existing culverts with a single structure Total 2015 Project Cost $ 545,000 CRP 1993 Shelton Matlock Road Culvert Rd. No.: 90100 - Shelton Matlock Road From: MP 8.03 To: MP 8.03 Replace existing culvert with a new structure CRP 1994 Highland Road Culvert Rd. No.: 04450 - Highland Road From: MP 1.47 To: MP 1.47 Replace existing culvert with a new structure Total 2015 Project Cost $ 10,000 CRP 1995 Cady Creek Culvert Rd. No.: 70390 - North Shore Rd From: MP 6.92 To: MP 6.92 Replace existing culvert with a new structure CRP 1829 Bridge No: 416400176 Hunter Creek Bridge Replacement Rd. No.: 41640 - Skokomish Valley Road From: MP 1.70 To: MP 1.88 Replace existing bridge Total 2015 Project Cost $ 2 665,000 ) r r ,- N Cn CO 0 0 0 co 0 m 0 m 0 m 0 m E E o 7G 2 2 Lo N a)E 2 2± a E c / 0 a 0 ca \ 0 w Ti z o o CL < Hearing Date: 10/14/2014 0 0 k ( \ Peninsula 0 0 0 \ /2 MPO/RTPO \~ak®{ \0 } Z \ ) j \ 0 S 0 ® © Expenditure Schedule 4th th ru 6th 1083 1083I 323 209 20 150 ouz PE RW CN 3/1/2015 BRAG 323 323 TOTALS BRAG 323 323( PE 5/1/2015 RATA 99 10 109 RW 9/1/2015 100 100 1CN 5/1/2016 RATA TOTALS RATA 99 110 209j y/K o o r TOTALS 100 1001 PE 1/1/2015 TAP 30 30' RW 2/1/2015 TAP 20 20 CN 8/1/2015 TAP 150 150 TOTALS 200 200 PE 6/1/2015 10 10 RW CN N. r Project Identification A. Federal Aid No. B. Bridge No, C. Project Title D. Street/Road Name of Number F Reninninn MP or road - Fndino MP or road CRP 1975 Bridge No: 901002328 Eddie Evers Bridge Rehabilitation Rd. No.: 90100 - Matlock Brady Road. From: MP 23.23 To: MP 23,23 Paint bridge to protect from further deterioration Total 2015 Project Cost $ 323,000 CRP 1970 Matlock Brady Road Rd. No.: 90100 From: MP 26.37 To: MP 27.6 Reconstruction CRP 1861 Simmons Road Rd, No.: 15240 From: MP 0,00 To: MP 1.06 'ROW acquisition only Total 2015 Project Cost $ 100,000 Belfair Area Sidewalks - Clifton Lane and Old Belfair Highway Rd. No.: 86750 and 98250 From: various To: various Construct ADA compliant Sidwalks Total 2015 Project Cost $ 200,000 ) 0