HomeMy WebLinkAbout68-15 - Res. County Road Project 2004 All County Roads Culvert Installation 2005 All County Roads MiscRESOLUTION NO.: (08 -15
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY, WASHINGTON.
In the hatter of initiating county road projects and assigning CRP numbers.
IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed thereon as by law
provided. (RCW 36.75.050, 36.80.080, 36.80.070) (Optional References).
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineers estimates are hereby made in
the amount and for the purposes shown:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(9)
ITEM
ROAD
BRIDGE
NAME
NUMBER
AND/OR
ROAD
NUMBER
LOG
MP
TO
MP
TYPE
(see
codes)
OF
WORK
C
0
N
T.
COUNTY
FORCES
ENG'R.
PE
COST
R/W
ESTIMATE
FEDERAL
(THOUSANDS)
CONSTRUCTION
LOCAL
CRP
NO.
1.
All
(Culvert
County
installations,
Roads
as
needed)
----
---
--_
AL
X
20
10
100
2004
2.
All
(Miscellaneous
County
Roads
work,
as
needed)
----
---
----
ABCDGIL
X
X
10
5
85
2005
(4) TYPE OF WORK CODE
A. Grading & Draining
B. Base & Top Course
C. Bituminous Surface Treatment (BST) / Seals
D. A.C. / P.C.C. Pavement
E. Curbs and Gutters
F. Sidewalks
ADOPTED this 11 day of_ , 2015.
ST:r
li
Almanzor, Clerk of the Board
Tim WhiteeaCh. Deputy Prosecuting Attorney
c: Commissioners
Public Works
JOURNAL: Publ. lt: 12/31/15 (Bill Public Works)
G. Traffic Facilities
H. Paths & Trails Bikeways
I. Bridges
J. Ferry Facilities
K. Environmental Mitigation
L. Fish Passage
(5) The construction is to be accomplished by contract
in accordance with RCW 36.77.020 et. seq.
(6) The construction is to be accomplished by county
forces in accordance with RCW 36.77.065 and
WAC 136.18.
BOARD OF COUNTY COMMISSIONERS OF
MASON COUNTY, WASINGTON
TERRI JEFF\Vic: hair
TIM SHELDON, Commissioner