Loading...
HomeMy WebLinkAbout63-16 - Res. Six-Year Transportation Improvement ProgramRESOLUTION NO -16 Six -Year Transportation Improvement Program WHEREAS, in compliance with 136-15 WAC, Mason County has prepared the attachment Six -Year Transportation Improvement Program for the period January 1, 2017 through December 31 2022; and, WHEREAS, the Board of County Commissioners hereby certifies that the priority array of potential projects on this County's road system, including bridges, was prepared by the County Engineer during the preparation of the said Six -Year Transportation Improvement Pmgi am, and, WHEREAS, the Board of County Commissioners has reviewed thebridge condition report as prepared by the County Engineer during the review of the proposed 2017-2022 Six - Year Transportation Improvement Program WHEREAS, the Board of County Commissioners finds that the proposed 2017-2022 Six -Year Transportation Improvement Program is consistent with the County Comprehensive plan; and, WHEREAS, the Board of County Commissioners has held a public hearing on this 4t day of October, 2016.. NOW, THEREFORE BE IT RESOLVED, that the attached Six -Year Transportation. l nprovement Program for 2017 through 2022 be adopted, whichare hereby incoiporatedand. made part of this Resolution. BE IT TETHER RESOLVED that the County Engineer is hereby directed to distribute copies of the Six -Year Transportation Improvement Program for 2017-2022 to all required agencies. ADOPTED this r day of tJ<� 2016. ATTEST: JU 1r ALMANZOR, Clerk of the Board APPROVED AS TO FOItM: TIM WI4tIE EAD, Ch. Deputy Prosecuting Attorney cc: Commissioners Public Works Community Development Couoty Road.Admin, Board WSDOT BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON TIM SHELDON, Vice Chair RANDY NEATHERLIN, Commissioner 0 7J T z z m o�.ET) a) J "3 o uo 5. (D m c0 .D CD 0 V 0 O 0 C 07, V 0 0 0 C4 OD V 0 Cb 0 o CO V Functional Class .-a _. . _1 1 Priority Number CRP 1993 Culvert Replacement - Shelton Matlock Road Rd. No.: 90100 - Shelton Matlock Road From: MP 8.03 To: MP 8.03 Replace existing culvert with a new structure 'UNPLANNED CULVERT REPAIR/REPLACEMENT PROJECTS Total 2017 Project Cost $ 130,000 UNPLANNED SMALL CAPITAL PROJECTS Total 2017 Project Cost $ 100,000 2007, 2008 - Bear Crk-De atic Safety Projects 2rious )us and Guardrail Projects Project Cost $ - Arcadia Road atic Preservation - HMA Overlays 1100 1.82 To: MP 6.98 Project Cost $ 1,960,000 i , C)1 [TOTALS RATA PE 1/1/2018 RW 6/1/2018 CN 7/15/2019 !TOTALS 1218 742 1960 PE 1/1/2017 STP 26 4 30 RW CN 6/1 /2017 STP 1192 738 1930 z *rn z *m Phase Start (mm/dd/yy) LS 100 1001 130 1301 iIP 18 2 20 ;IP 7 1 8 ;IP 419 46 465 O j N co 1 01 U1 0 O O O ea O .s i'J 0 0 0 Cn -. CT Cn 0 CO O 0-* 0 0 r.)0 0 1 465 �. CO I 30 CO -•cO W «X N) O O 0 O Uf Ul O CD O -1 0 CO 0 — Co 0 r .A 0 -1 0 G, 0 — I 1071 00 -A 0 Co -s O C_n Cn Owl ah o 4001 -. 0 _a 0 0 0 ..1 85 0 20 O- I-Ell 0 0 01 0 'r.. 0 420I 30 co 0 o 0 c.n LT) -1 CSt 30 500 500 CO 0 GO CO a CO CO 0 0 o m 0 0 m m .- r., suer7d71-1 Only V z D ?!W auired )ate m/yy) MPO/RTPO: Peninsula 3 m 0. 0 v (D g CO a) V) 0 c Co. Name: Mason County :ale° 6ulaeay :ate° uondoPV 1 0 a N 0 h 73 -0 Z rn a • 0 re; - �. C O 0) 'G CD 5 to O o 0 w o o - c co o Functional Class �. co`, — — Priority Number CRP Culvert Replacement - North Island Drive Rd. No.: 39630 - North Island Drive From: MP 3.46 To: MP 3.47 Replace existing culvert with a new structure CRP 1995 Culvert Replacement - Cady Creek Rd. No.: 70390 - North Shore Rd From: MP 6.92 To: MP 6.92 Replace existing culvert with a new structure CRP 1994 Culvert Replacement - Highland Road Rd. No.: 04450 - Highland Road From: MP 1.47 To: MP 1.47 Replace existing culvert with a new structure 1861 nons Road \lo.: 15240 MP 0.00 To: MP 1.06 / acquisition only 2017 Project Cost S 200,000 '1970 ock Brady Road Vo.: 90100 is MP 26.37 To: MP 27.6 )nstruction 12017 Project Cost $ 1,455,000 )ad i To: MP 6.85 - Resurfacing, Restoration and Rehabilitation act Cost S 1,520,000 No. B. Bridge No. Name of Number IP or road - Ending MP or road )fk to be Done b a) O O N W 1 Total Length TOTALS 200 200 'TOTALS RATA 930 525 14551 PE 5/1/2015 RW 9/1/2015 CN 5/1/2016 TOTALS RATA* PE 1/1/2020 RW 6/1/2020 CN 7/15/2021 TOTALS PE 1/1/2018 RW 6/1/2018 CN 7/15/2019 z�rn0 RATA 26 ` 6/1/2016 5/1/2017 RATA 650 D r 0) LS RATA` 1 1/1/2020 6/1/2020 7/15/2021 Cn(nCDD v .- - rn ID. g D State Local Total Funds Funds Funds " V GJ 0 0 0) �! CD CO a �1 0 W 0 N 0 00Z ... _a V O CO O N O co — N co cr.) C✓l cm cm 70 CA) ti - CO c1i c07Cn 000 v N 0 0~ O 0 co O O 61 O 0 j 1 80 O 'J CO 0 v O CO 0 O 0 N 0 O 0 O 0 O O N 0 Q 0 m 0 0 rn 0 0 m 0 0 m 0 n m 0 a m 'J ._a 0) o C31 C.Ti 01 U .L] � m co .. a r iW _D 3 CD Q 0 O F :atea 6uueaH :elect uolldopv A-9 0 N.) 0 CAB CD 0 n� ass :44 0 2 2 0 leek efts! no 0 0 N to wN � F V 01 (0 lD Pd 0 .73 I CI) D -I —I T D v =U _ c c co c J D� cD a , v 38 T o c 0 0 0 c o 3 CP rn 1 0 co 3 0 N O O sS CRP Trails Road - Alternate Route 08 c� Rd. No.: 62310 From: MP To MP New Construction Total 2017 Project Cost $ 100,000 0 o 0 o Functional Class CO rn :,� Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name of Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done P fair Connector Study - Alt. Route a No. TLRD m: v Construction 312017 Project Cost $ 2C P ils Road - Repairs No.: 62310 m: MP 0.00 To: MP 0.40 al 2017 Project Cost 5 715,000 P 2009 fair Area Sidewalks - Old Belfair Highway No.: 98250 m: 0.00 To: 0.10 ]struct ADA compliant Sidwalks al 2017 Project Cost $ 185,000 To: MP 26.3 ng, Restoration and Rehabilitation 0 0 0 o 0 Total Length TOTALS RATA* ap z *m !TOTALS 715 715 z m z *m z ID *rn -ALS 100 100 "ALS 200 2001 LS - 185 185 Bil Bil< State Fund State Local Source Funds Funds N a) {I1 Cr 0 CJl 0 N CPI -.1 C71 NV 0 0 0) C..) CO U1 0 185 -' N N �3 G) O f J V O -a CD -I C J co a _s N O C 1 CFl 0 O CJl 0' O Cri C71 CJ1 w O o --a 0 0 N 0 0 of v, o 0 a o a o — a - w 120 o o o con 0 0 n c7 rn rn rn N) rn c0 N) O, in t 3 a 0 0) fD 0 5. Z 0 co 0 O c :aieg 6uueaH awn uogdopy ZZOZ 04 LI.oz Woacfl Six Year Transportation Improvement Program D Ey t� t cD D 71 o a O3 CD CD a e D ) n 3 W <- N �- 't• r- c a 0) 0) c0 0 CC 0 Cb Ct5 C0 CD Allyn Access, Circulation and ROW 08 11 Rd. No.: TBD From: I o: ROW acquisition Total 2017 Project Cost $ 50,000 o m Functional Class Priority Number CRP RR Ave/Shelton-Matlock Corridor Upgrade Plan Rd. No.: 90100 From: MP 0.91 To: MP 1.70 0 y co !TOTALS I /v T z * m Federal Funding 09 C3; o O O G 0 • 0 O A O O P 0 O rn op :aae0 6uueaH :also uoadopv O 0 O V/ aaam x 0 crni 0 aasa 0 aaa! m ta ae® V 'Z 3 3 N ma eta mO 0 0 N � N N3