HomeMy WebLinkAbout63-16 - Res. Six-Year Transportation Improvement ProgramRESOLUTION NO -16
Six -Year Transportation Improvement Program
WHEREAS, in compliance with 136-15 WAC, Mason County has prepared the
attachment Six -Year Transportation Improvement Program for the period January 1, 2017
through December 31 2022; and,
WHEREAS, the Board of County Commissioners hereby certifies that the priority array
of potential projects on this County's road system, including bridges, was prepared by the
County Engineer during the preparation of the said Six -Year Transportation Improvement
Pmgi am, and,
WHEREAS, the Board of County Commissioners has reviewed thebridge condition
report as prepared by the County Engineer during the review of the proposed 2017-2022 Six -
Year Transportation Improvement Program
WHEREAS, the Board of County Commissioners finds that the proposed 2017-2022
Six -Year Transportation Improvement Program is consistent with the County Comprehensive
plan; and,
WHEREAS, the Board of County Commissioners has held a public hearing on this 4t
day of October, 2016..
NOW, THEREFORE BE IT RESOLVED, that the attached Six -Year Transportation.
l nprovement Program for 2017 through 2022 be adopted, whichare hereby incoiporatedand.
made part of this Resolution.
BE IT TETHER RESOLVED that the County Engineer is hereby directed to distribute
copies of the Six -Year Transportation Improvement Program for 2017-2022 to all required
agencies.
ADOPTED this r day of tJ<� 2016.
ATTEST:
JU 1r ALMANZOR,
Clerk of the Board
APPROVED AS TO FOItM:
TIM WI4tIE EAD,
Ch. Deputy Prosecuting
Attorney
cc: Commissioners
Public Works
Community Development
Couoty Road.Admin, Board
WSDOT
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY, WASHINGTON
TIM SHELDON, Vice Chair
RANDY NEATHERLIN, Commissioner
0 7J T
z z m
o�.ET)
a) J "3 o
uo
5.
(D
m
c0
.D
CD
0
V
0 O 0
C 07, V
0 0 0
C4 OD V
0
Cb
0 o
CO V
Functional
Class
.-a
_.
.
_1
1
Priority
Number
CRP 1993
Culvert Replacement - Shelton Matlock Road
Rd. No.: 90100 - Shelton Matlock Road
From: MP 8.03 To: MP 8.03
Replace existing culvert with a new structure
'UNPLANNED CULVERT REPAIR/REPLACEMENT PROJECTS
Total 2017 Project Cost $ 130,000
UNPLANNED SMALL CAPITAL PROJECTS
Total 2017 Project Cost $ 100,000
2007, 2008 - Bear Crk-De
atic Safety Projects
2rious
)us
and Guardrail Projects
Project Cost $
- Arcadia Road
atic Preservation - HMA Overlays
1100
1.82 To: MP 6.98
Project Cost $ 1,960,000
i
,
C)1
[TOTALS RATA
PE 1/1/2018
RW 6/1/2018
CN 7/15/2019
!TOTALS 1218 742 1960
PE 1/1/2017 STP 26 4 30
RW
CN 6/1 /2017 STP 1192 738 1930
z *rn
z *m
Phase
Start
(mm/dd/yy)
LS 100 1001
130 1301
iIP 18 2 20
;IP 7 1 8
;IP 419 46 465
O j N
co 1
01 U1 0
O O O
ea
O .s i'J
0 0 0
Cn -.
CT Cn 0
CO
O
0-*
0
0
r.)0
0
1 465
�.
CO
I 30
CO
-•cO
W
«X
N)
O
O
0
O
Uf
Ul
O
CD
O
-1
0
CO
0
—
Co
0
r
.A
0
-1
0
G,
0
—
I 1071
00
-A
0
Co
-s
O
C_n
Cn
Owl
ah
o
4001
-.
0
_a
0
0
0
..1
85
0
20
O-
I-Ell
0
0
01
0
'r..
0
420I
30
co
0
o
0
c.n
LT)
-1
CSt
30
500
500
CO
0
GO
CO
a
CO
CO
0
0
o
m
0
0
m
m
.-
r.,
suer7d71-1
Only
V
z
D
?!W
auired
)ate
m/yy)
MPO/RTPO: Peninsula
3
m
0.
0
v
(D
g
CO a)
V)
0
c
Co. Name: Mason County
:ale° 6ulaeay
:ate° uondoPV
1
0
a
N
0
h 73 -0
Z rn
a •
0
re; - �.
C O
0)
'G
CD
5
to
O
o
0
w
o
o
-
c
co o
Functional
Class
�.
co`,
—
—
Priority
Number
CRP
Culvert Replacement - North Island Drive
Rd. No.: 39630 - North Island Drive
From: MP 3.46 To: MP 3.47
Replace existing culvert with a new structure
CRP 1995
Culvert Replacement - Cady Creek
Rd. No.: 70390 - North Shore Rd
From: MP 6.92 To: MP 6.92
Replace existing culvert with a new structure
CRP 1994
Culvert Replacement - Highland Road
Rd. No.: 04450 - Highland Road
From: MP 1.47 To: MP 1.47
Replace existing culvert with a new structure
1861
nons Road
\lo.: 15240
MP 0.00 To: MP 1.06
/ acquisition only
2017 Project Cost S 200,000
'1970
ock Brady Road
Vo.: 90100
is MP 26.37 To: MP 27.6
)nstruction
12017 Project Cost $ 1,455,000
)ad
i
To: MP 6.85
- Resurfacing, Restoration and Rehabilitation
act Cost S 1,520,000
No. B. Bridge No.
Name of Number
IP or road - Ending MP or road
)fk to be Done
b
a)
O
O
N
W
1
Total
Length
TOTALS 200 200
'TOTALS RATA 930 525 14551
PE 5/1/2015
RW 9/1/2015
CN 5/1/2016
TOTALS RATA*
PE 1/1/2020
RW 6/1/2020
CN 7/15/2021
TOTALS
PE 1/1/2018
RW 6/1/2018
CN 7/15/2019
z�rn0
RATA 26
` 6/1/2016
5/1/2017 RATA 650
D
r
0)
LS RATA` 1
1/1/2020
6/1/2020
7/15/2021
Cn(nCDD
v .- -
rn ID. g
D
State Local Total
Funds Funds Funds
"
V GJ
0 0
0)
�!
CD
CO
a
�1
0
W
0
N
0
00Z
...
_a
V
O
CO
O
N
O
co
—
N
co
cr.)
C✓l
cm
cm
70
CA)
ti
-
CO
c1i
c07Cn
000
v
N
0
0~
O
0
co
O
O
61
O
0
j
1
80
O
'J
CO
0
v
O
CO
0
O
0
N
0
O
0
O
0
O
O
N
0
Q
0
m
0
0
rn
0
0
m
0
0
m
0
n
m
0
a
m
'J
._a
0)
o
C31
C.Ti
01
U .L]
� m co
.. a
r iW
_D
3
CD
Q
0
O
F
:atea 6uueaH
:elect uolldopv
A-9
0
N.)
0
CAB
CD
0
n�
ass
:44
0
2
2
0
leek
efts! no
0 0
N to
wN �
F V
01
(0
lD
Pd
0
.73 I CI)
D -I
—I T
D v
=U
_ c
c
co
c J
D� cD
a ,
v 38 T
o
c
0 0 0
c o
3 CP
rn
1
0
co
3
0
N
O
O
sS
CRP
Trails Road - Alternate Route
08 c� Rd. No.: 62310
From: MP To MP
New Construction
Total 2017 Project Cost $ 100,000
0
o
0
o
Functional
Class
CO
rn
:,�
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name of Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
P
fair Connector Study - Alt. Route a
No. TLRD
m:
v Construction
312017 Project Cost $ 2C
P
ils Road - Repairs
No.: 62310
m: MP 0.00 To: MP 0.40
al 2017 Project Cost 5 715,000
P 2009
fair Area Sidewalks - Old Belfair Highway
No.: 98250
m: 0.00 To: 0.10
]struct ADA compliant Sidwalks
al 2017 Project Cost $ 185,000
To: MP 26.3
ng, Restoration and Rehabilitation
0
0
0
o
0
Total
Length
TOTALS RATA*
ap
z *m
!TOTALS 715 715
z m
z *m
z ID
*rn
-ALS 100 100
"ALS 200 2001
LS - 185 185
Bil
Bil<
State
Fund State Local
Source Funds Funds
N
a)
{I1 Cr
0
CJl 0
N
CPI
-.1
C71
NV
0
0
0)
C..) CO
U1 0
185
-'
N
N
�3
G)
O
f J
V
O
-a
CD
-I
C J
co
a
_s
N
O
C 1
CFl
0
O
CJl
0'
O
Cri
C71
CJ1
w
O
o
--a
0
0
N
0
0
of
v,
o
0
a
o
a
o
—
a
-
w
120
o
o
o
con
0
0
n
c7
rn
rn
rn
N)
rn
c0
N)
O,
in
t
3
a
0
0)
fD
0
5.
Z
0
co
0
O
c
:aieg 6uueaH
awn uogdopy
ZZOZ 04 LI.oz Woacfl
Six Year Transportation Improvement Program
D
Ey
t�
t cD
D 71 o a
O3 CD
CD
a
e
D ) n
3
W
<-
N �-
't•
r-
c
a
0)
0)
c0
0
CC
0
Cb
Ct5
C0
CD
Allyn Access, Circulation and ROW
08 11 Rd. No.: TBD
From: I o:
ROW acquisition
Total 2017 Project Cost $ 50,000
o
m
Functional
Class
Priority
Number
CRP
RR Ave/Shelton-Matlock Corridor Upgrade Plan
Rd. No.: 90100
From: MP 0.91 To: MP 1.70
0
y
co
!TOTALS
I /v T
z * m
Federal Funding
09
C3;
o
O
O
G
0
•
0
O
A
O
O
P
0
O
rn
op
:aae0 6uueaH
:also uoadopv
O
0
O
V/
aaam
x
0
crni
0
aasa
0
aaa!
m ta
ae®
V
'Z
3 3
N
ma eta
mO
0 0
N �
N
N3