HomeMy WebLinkAboutCOM2021-00013 Shearwall Modifications - COM Inspections - 5/11/2021 POST-INSTALLED ANCHORS REPORT MAYES I Irerr7COr1
Report Number: M7211250.0002
Service Date: 05/11/21 20225 Cedar Valley Rd Ste 110
Report Date: 05/12/21 Lynnwood, WA 98036-6365
425-742-9360
Client Project
North Forty Lodging LLC Alderbrook TI Shearwall Modification (T)
Attn: Cathy Berg 10 E Alderbrook Dr
PO Box 609 Union, WA
Union, WA 98592
Project No.: M7211250
Permit No.: COM2021-00013 Weather: Inside
Inspector: Tom Callea
Onsite at Alderbrook TI Shearwall Modification 10 E Alderbrook Dr Union, WA to conduct post installed anchor
inspection.
The contractor has completed installing all shearwall hold-downs and tightening all anchor nuts for wall
modification per RFI 4.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections/Materials Testing
Mayes/Terracon Rep.: Thomas Callea
Reported to: Randy/Walsh Construction 206.271.0867
Contractor: Walsh Construction
Report Distribution:
Mason County WA,Building (1)Mayes Testing Engineers,Inc,
Official Belinda Rix /
(1)Mayes Testing Engineers,Inc,Carl (1)North Forty Lodging LLC,Laurie Reviewed By:
Tacker Kenneth
(1)SKB Architects,Meg Taylor (1)Walsh Construction Co Carl Tacker
(Washington),Randy Cossette
Project Field Manager
The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0001,10-16-13,Rev.10 Page 1 of 1
WOOD FRAME OBSERVATIONS REPORT MAYES 11rerracon
Report Number: M7211250.0003
Service Date: 05/19/21 20225 Cedar Valley Rd Ste 110
Report Date: 05/19/21 Lynnwood, WA 98036-6365
425-742-9360
Client Project
North Forty Lodging LLC Alderbrook TI Shearwall Modification (T)
Attn: Cathy Berg 10 E Alderbrook Dr
PO Box 609 Union, WA
Union, WA 98592
Project No.: M7211250
Permit No.: COMM2021-00013 Weather: Sunny
On site to verify and inspect completion of shearwall panel nailing.
Inspected nailing off 3 sheets of plywood on Reservation Room# 278, east wall starting just inside doorway.
Work and nailing per notes and details on RFI #4.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections/Materials Testing
Mayes/Terracon Rep.: Edward Bauman
Reported to: Randy/Walsh Construction 206.271.0867
Contractor: Walsh Construction
Report Distribution:
1 Mason Count WA,Building O y g (1)Mayes Testing Engineers,Inc, `/ /
Official Belinda Rix
-�-W;
(1)Mayes Testing Engineers,Inc,Carl (1)North Forty Lodging LLC,Laurie Reviewed By:
Tacker Kenneth
(1)SKB Architects,Meg Taylor (1)Walsh Construction Co
(Washington),Randy Cossette Carl Tacker
Project Field Manager
The tests were performed in general accordance with applicable ASTM,AASHTO,or )OT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0001,10-16-13,Rev.10 Page 1 of 1
WOOD FRAME OBSERVATIONS REPORT MAYES I lrerracon
Report Number: M7211250.0003
Service Date: 05/19/21 20225 Cedar Valley Rd Ste 110
Report Date: 05/19/21 Lynnwood,WA 98036-6365
425-742-9360
Client Project
North Forty Lodging LLC Alderbrook TI Shearwall Modification (T)
Attn: Cathy Berg 10 E Alderbrook Dr
PO Box 609 Union, WA
Union, WA 98592
Project No.: M7211250
Permit No.: COMM2021-00013 Weather: Sunny
On site to verify and inspect completion of shearwall panel nailing.
Inspected nailing off 3 sheets of plywood on Reservation Room #278, east wall starting just inside doorway.
Work and nailing per notes and details on RFI #4.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
bM262,I - o0oi3
Services: Special Inspections/Materials Testing
Mayes/Terracon Rep.: Edward Bauman
Reported to: Randy/Walsh Construction 206.271.0867
Contractor: Walsh Construction
Report Distribution:
O Mason County WA,Building (1)Mayes Testing Engineers,Inc, ^ /
Official L
Belinda Rix �/ "_
(1)Mayes Testing Engineers,Inc,Carl (1)North Forty Lodging LC,Laurie Reviewed By:
;�
Tacker Kenneth
(1)SKB Architects,Meg Taylor (1)Walsh Construction Co
Carl Tacker
(Washington),Randy Cossette
Project Field Manager
The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0001,10-16-13,Rev.10 Page 1 of 1
FABRICATION SHOP OBSERVATION REPORT MAYES I Herracon
Report Number: M7211250.0004
Service Date: 10/13/21 20225 Cedar Valley Rd Ste 110
Report Date: 10/14/21 Lynnwood, WA 98036-6365
425-742-9360
Client Project
North Forty Lodging LLC Alderbrook TI Shearwall Modification (T)
Attn: Cathy Berg 10 E Alderbrook Dr
PO Box 609 Union,WA
Union, WA 98592
Project Number: M7211250
Permit No.: COMM2021-00013
GENERAL INFORMATION
On site to conduct visual weld inspection.
SUMMARY OF SERVICES
The contractor has completed welding (1) angle weldment MK M-1513.
The results of observation(s) for today were reported to Sarah.
COMPLIANCE STATEMENT
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections/Materials Testing
Mayes/Terracon Rep.: Thomas Callea
Reported To: Walsh Construction
Contractor: Walsh Construction
Report Distribution:
(1)Mason County WA,Building (1)Mayes Testing Engineers,Inc,
Official Belinda Rix
(1)Mayes Testing Engineers,Inc,Carl (1)North Forty Lodging LLC,Laurie Reviewed By:
Tacker Kenneth
(1)SKB Architects,Meg Taylor (1)Walsh Construction Co Mark Gordon
(Washington),Randy Cossette
Department Manager III
The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0001,10-16-13,Rev.10 Page 1 of 1