HomeMy WebLinkAboutCOM2021-00013 Shearwall Modifications - COM Inspections - 5/11/2021 POST-INSTALLED ANCHORS REPORT MAYES I Irerr7COr1 Report Number: M7211250.0002 Service Date: 05/11/21 20225 Cedar Valley Rd Ste 110 Report Date: 05/12/21 Lynnwood, WA 98036-6365 425-742-9360 Client Project North Forty Lodging LLC Alderbrook TI Shearwall Modification (T) Attn: Cathy Berg 10 E Alderbrook Dr PO Box 609 Union, WA Union, WA 98592 Project No.: M7211250 Permit No.: COM2021-00013 Weather: Inside Inspector: Tom Callea Onsite at Alderbrook TI Shearwall Modification 10 E Alderbrook Dr Union, WA to conduct post installed anchor inspection. The contractor has completed installing all shearwall hold-downs and tightening all anchor nuts for wall modification per RFI 4. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections/Materials Testing Mayes/Terracon Rep.: Thomas Callea Reported to: Randy/Walsh Construction 206.271.0867 Contractor: Walsh Construction Report Distribution: Mason County WA,Building (1)Mayes Testing Engineers,Inc, Official Belinda Rix / (1)Mayes Testing Engineers,Inc,Carl (1)North Forty Lodging LLC,Laurie Reviewed By: Tacker Kenneth (1)SKB Architects,Meg Taylor (1)Walsh Construction Co Carl Tacker (Washington),Randy Cossette Project Field Manager The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001,10-16-13,Rev.10 Page 1 of 1 WOOD FRAME OBSERVATIONS REPORT MAYES 11rerracon Report Number: M7211250.0003 Service Date: 05/19/21 20225 Cedar Valley Rd Ste 110 Report Date: 05/19/21 Lynnwood, WA 98036-6365 425-742-9360 Client Project North Forty Lodging LLC Alderbrook TI Shearwall Modification (T) Attn: Cathy Berg 10 E Alderbrook Dr PO Box 609 Union, WA Union, WA 98592 Project No.: M7211250 Permit No.: COMM2021-00013 Weather: Sunny On site to verify and inspect completion of shearwall panel nailing. Inspected nailing off 3 sheets of plywood on Reservation Room# 278, east wall starting just inside doorway. Work and nailing per notes and details on RFI #4. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections/Materials Testing Mayes/Terracon Rep.: Edward Bauman Reported to: Randy/Walsh Construction 206.271.0867 Contractor: Walsh Construction Report Distribution: 1 Mason Count WA,Building O y g (1)Mayes Testing Engineers,Inc, `/ / Official Belinda Rix -�-W; (1)Mayes Testing Engineers,Inc,Carl (1)North Forty Lodging LLC,Laurie Reviewed By: Tacker Kenneth (1)SKB Architects,Meg Taylor (1)Walsh Construction Co (Washington),Randy Cossette Carl Tacker Project Field Manager The tests were performed in general accordance with applicable ASTM,AASHTO,or )OT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001,10-16-13,Rev.10 Page 1 of 1 WOOD FRAME OBSERVATIONS REPORT MAYES I lrerracon Report Number: M7211250.0003 Service Date: 05/19/21 20225 Cedar Valley Rd Ste 110 Report Date: 05/19/21 Lynnwood,WA 98036-6365 425-742-9360 Client Project North Forty Lodging LLC Alderbrook TI Shearwall Modification (T) Attn: Cathy Berg 10 E Alderbrook Dr PO Box 609 Union, WA Union, WA 98592 Project No.: M7211250 Permit No.: COMM2021-00013 Weather: Sunny On site to verify and inspect completion of shearwall panel nailing. Inspected nailing off 3 sheets of plywood on Reservation Room #278, east wall starting just inside doorway. Work and nailing per notes and details on RFI #4. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. bM262,I - o0oi3 Services: Special Inspections/Materials Testing Mayes/Terracon Rep.: Edward Bauman Reported to: Randy/Walsh Construction 206.271.0867 Contractor: Walsh Construction Report Distribution: O Mason County WA,Building (1)Mayes Testing Engineers,Inc, ^ / Official L Belinda Rix �/ "_ (1)Mayes Testing Engineers,Inc,Carl (1)North Forty Lodging LC,Laurie Reviewed By: ;� Tacker Kenneth (1)SKB Architects,Meg Taylor (1)Walsh Construction Co Carl Tacker (Washington),Randy Cossette Project Field Manager The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001,10-16-13,Rev.10 Page 1 of 1 FABRICATION SHOP OBSERVATION REPORT MAYES I Herracon Report Number: M7211250.0004 Service Date: 10/13/21 20225 Cedar Valley Rd Ste 110 Report Date: 10/14/21 Lynnwood, WA 98036-6365 425-742-9360 Client Project North Forty Lodging LLC Alderbrook TI Shearwall Modification (T) Attn: Cathy Berg 10 E Alderbrook Dr PO Box 609 Union,WA Union, WA 98592 Project Number: M7211250 Permit No.: COMM2021-00013 GENERAL INFORMATION On site to conduct visual weld inspection. SUMMARY OF SERVICES The contractor has completed welding (1) angle weldment MK M-1513. The results of observation(s) for today were reported to Sarah. COMPLIANCE STATEMENT To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections/Materials Testing Mayes/Terracon Rep.: Thomas Callea Reported To: Walsh Construction Contractor: Walsh Construction Report Distribution: (1)Mason County WA,Building (1)Mayes Testing Engineers,Inc, Official Belinda Rix (1)Mayes Testing Engineers,Inc,Carl (1)North Forty Lodging LLC,Laurie Reviewed By: Tacker Kenneth (1)SKB Architects,Meg Taylor (1)Walsh Construction Co Mark Gordon (Washington),Randy Cossette Department Manager III The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001,10-16-13,Rev.10 Page 1 of 1