HomeMy WebLinkAboutChange Order # 013 for Colvos Constructioncolvos C O 1/ 5 T R U C T I O N Colvos Construction 711 Court C Tacoma, Washington 98402 Phone: (253) 844-4640 TO: PCCO #013 Project: - 21-025 Mason County Courthouse Exterior 414 West Franklin St Shelton, Washington 98584 Prime Contract Change Order #013: Site work Improvements DATE CREATED: REVISION: INVOICED DATE: SCHEDULE IMPACT: CONTRACT FOR: Mason County 411 North 5th St Shelton, Washington 98584 1 / 20 /2022 0 36 days FROM: CREATED BY: PAID DATE: EXECUTED: 1:21-025 Mason County Courthouse Exterior TOTAL AMOUNT: Prime Contract DESCRIPTION: The following PCO's are encompassed by PCCO #013 1. PCO #065 - Extruded Curb Planter Replacement 2. PCO #067 - Hydrant Revisions 3. PCO #068 - Existing Asphalt on SW & SE corners 4. PCO #069 - Project Delays 5. PCO #070 - W Franklin Additional Stop Signs 6. PCO #071 - NE Corner Revisions See attached PCO's for their individual scope descriptions Note: PCO #066 was voided due to no longer needing additional landscaping Colvos Construction 711 Court C Tacoma Washington 98402 Justin Tidwell (Colvos Construction) No $ 59,953.01 ATTACHMENTS: Buildingl0 PCO#70 - signed_1.12.22.pdf PCO #71 - NE Corner Revisions credit - signed.pdf PCO #67 Hydrant Revisions - signed_HDG.pdf PCO #69 Project Delays through 1_12_22 - signed pdf HDG.pdf Mason County Exterior - PCO #068 Existing Asphault and curb on SW & SE Corners SIGNED.pdf Mason Court House Exterior PCO#065.pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO # Title Schedule Impact Amount 065 Extruded Curb Planter Replacement 0 days 7,697.55 067 Hydrant Revisions 0 days 6,185.76 068 Existing Asphalt on SW & SE Corners 0 days 10,648.06 070 W Franklin Additional Stop Signs 0 days 2,393.69 071 NE Corner Revisions 0 days (2,557.45) 69 Project Delays 36 days 35,585.40 TOTAL: $ 59,953.01 CHANGE ORDER LINE ITEMS: Colvos Construction page 1 of 3 Printed On: 1/24/ 2022 11 :09 AM coLvos C O N S T R U C T I O N PCO # 065 : Extruded Curb Planter Replacement PCCO #013 # Cost Code Description Type Amount Other $ 2,800.00 1 31-10-10 - Earthwork Removal of existing planters and backfill 2 32-17-23 - Pavement Markings Installation of (5) new extruded curb planters Other $ 3,240.00 3 01-30-23 - Project Engineer 1 hr of PE time Other $ 70.00 Subtotal: $6,110.00 Bond: 3.00% Applies to all line item types. 183.30 Liability Insurance: 1.50% Applies to all line item types. 94.40 Contractor Fee: 10.00% Applies to all line item types. 638.77 B&O Tax: 0.69% Applies to all line item types. 48.48 Sales Taxes: 8.80% Applies to all line item types. 622.60 Grand Total: $7,697.55 PCO # 067 : Hydrant Revisions Type Amount # Cost Code Description 1 31-10-10 - Earthwork Hydrant Revisions Other $ 4,340.00 2 31-10-10 - Earthwork Install additional valve per COS request Other $ 500.00 Other $ 70.00 3 90-10-33 - Contractor Fee 1 hr PE time Subtotal: $4,910.00 Bond: 3.00% Applies to all line item types. 147.30 Liability Insurance: 1.50% Applies to all line item types. 75.86 Contractor Fee: 10.00% Applies to all line item types. 513.32 B&O Tax: 0.69% Applies to all line item types. 38.96 Sales Taxes: 8.80% Applies to all line item types. 500.32 Grand Total: $6,185.76 PCO # 068 : Existing Asphalt on SW & SE Corners Type Amount # Cost Code Description Other $ 1,630.00 1 31-10-10 - Earthwork Demo existing asphalt & re grade Other $ 6,752.00 2 03-47-03 - Site Concrete Additional site concrete - sidewalk extension SE & SW corner Other $ 70.00 3 01-30-23 - Project Engineer 1 hr PE time Subtotal: $8,452.00 Bond: 3.00% Applies to all line item types. 253.56 Liability Insurance: 1.50% Applies to all line item types. 130.58 Contractor Fee: 10.00% Applies to all line item types. 883.61 B&O Tax: 0.69% Applies to all line item types. 67.07 Sales Taxes: 8.80% Applies to all line item types. 861.24 Grand Total: $10,648.06 PCO # 070 : W Franklin Additional Stop Signs # Cost Code Description Type Amount 1 32-17-23 - Pavement Markings Furnish (2) Metal Sign posts Other $ 1,600.00 2 06-10-53 - Rough Carpentry Install (2) metal Sign post bases Other $ 160.00 01-30-23 - Project Engineer 2 hr PE Time Other $ 140.00 3 Subtotal: $1,900.00 Bond: 3.00% Applies to all line item types. 57.00 Liability Insurance: 1.50% Applies to all line item types. 29.36 Contractor Fee: 10.00% Applies to all line item types. 198.64 B&O Tax: 0.69% Applies to all line item types. 15.08 Sales Taxes: 8.80% Applies to all line item types. 193.61 Grand Total: $2,393.69 Colvos Construction page 2 of 3 Printed On: 1 /24/ 2022 11 :09 AM coLvos CONSTRUCTIOU PCO # 071 : NE Corner Revisions PCCO #013 # Cost Code Description Type Amount 1 05-50-30 - Metal Railings (Credit) 21 LF 2 Strand Railing Other ($2,280.00) 2 03-47-03 - Site Concrete Tuf Indicators Other $ 250.00 Tile Directional 3 - Rough Carpentry Installation of (12) LF of TWSI's Other $ 420.00 06-10-53 4 06-10-53 - Rough Carpentry (Credit) 8 Hours of Install for Railing Other ($560.00) 5 01-30-23 - Project Engineer 2 Hrs of PE Other $ 140.00 Time Subtotal: ($2,030.00) Bond: 3.00% Applies to all line item types. (60.90) Liability Insurance: 1.50% Applies to all line item types. (31.36) Contractor Fee: 10.00% Applies to all line item types. (212.23) B&O 0.69% Applies to all line item types. (16.11) Tax: Sales Taxes: 8.80% Applies to all line item types. (206.85) Grand Total: ($2,557.45) PCO # 69 : Project Delays # Cost Code Description Type Amount 1 01-53-09 - Temporary Fencing Temporary Site Fencing Other $ 2,100.00 2 01-52-13 - Temporary Field Office Temporary Field Office Other $ 937.50 3 01-55-25 - Traffic Control Traffic Control Other $ 2,300.00 4 01-30-13 - Project Superintendent Project Superintendent Other $ 21,000.00 5 01-52-19 - Sani Cans Sani Cans Other $ 218.75 6 01-30-32 - Fuel / Oil / Maint / Parts Fuel and Mileage (1) trip per day to & from Colvos office Other $ 1,550.00 7 01-30-23 - Project Engineer PE Processing Time Other $ 140.00 Subtotal: $28,246.25 Bond: 3.00% Applies to all line item types. 847.39 Liability Insurance: 1.50% Applies to all line item types. 436.40 Contractor Fee: 10.00% Applies to all line item types. 2,953.00 B&O Tax: 0.69% Applies to all line item types. 224.13 Sales Taxes: 8.80% Applies to all line item types. 2,878.23 Grand Total: $35,585.40 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 36 days Bruce McKean (Helix Design Group) 6021 12th St E, Suite 201 Tacoma Washington 98424 SIGNATURE Mason County 411 North 5th St Shelton Washington 98584 DATE SIG ' TU RE 2Z DATE $ 2,880,715.06 $ 724,698.31 $ 3,605,413.37 $ 59,953.01 $ 3,665,366.38 Colvos Construction 711 Court C Tacoma Washington 98402 SIGNATURE DATE Colvos Construction page 3 of 3 Printed On: 1 /24/ 2022 11 :09 AM