HomeMy WebLinkAboutChange Order # 007 for Colvos Construction DocuSign Envelope ID:9F692A5E-E3E1-4F4A-9711-EB04C18C6213
Colvos PCCO #007
Colvos Construction Project: - 20-031 Mason County Courthouse
711 Court C 414 West Franklin St
Tacoma,Washington 98402 Shelton,Washington 98584
Phone: (253)844-4640
Prime Contract Change Order #007: Multiple PCO's (PCO #038, 039, 040,
042, 043, 044, 047, 048) �-- ---
TO: Mason County I" FROM: Colvos Construction
411 North 5th St 711 Court C
Shelton,Washington 98584 Tacoma Washington 98402
DATE CREATED: 1/09/2021 CREATED BY: Casey Angeline(Colvos Construction)
REVISION: 0
INVOICED DATE: PAID DATE:
SCHEDULE IMPACT: 0 days EXECUTED: No
CONTRACT FOR: 1:20-031 Mason County Courthouse Prime TOTAL AMOUNT: $ 16,030.87
Contract
DESCRIPTION:
PCCO#07 encompasses all cost associated with the PCO's listed below.
1. PCO#038-Guard Rail and Hand Rail Clarifications
2. PCO#039-Exposed Sprinkler Piping in Holding Cells
3. PCO#040-Holding Cell Plumbing Fixture Clarifications
4. PCO#042-Al Panel Location
5. PCO#043-Storefront and Glazing Scope of Work(PCO#026)
6. PCO#044-NW Slab Reinforcing Detail
7. PCO#047-GL 3 Seismic Wall Adjustment
8. PCO#048-Duct and Ceiling Height Confliction
ATTACHMENTS:
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER:
PCO# Title Schedule Impact Amount
038 RFI#74: Guard Rail and Hand Rail Clarifications 0 days 2,918.69
039 RFI#77: Exposed Sprinkler Piping in Holding Cells 0 days 2,213.19
040 RFI#81: Holding Cell Plumbing Fixture Clarifications 0 days 627.68
042 RFI#83: Al Panel Location 0 days 3,148.42
043 Storefront and Glazing Scope of Work(PCO 4026) 0 days 1,501.41
044 RFI#90, NW Slab Reinforcing Detail 0 days 2,360.07
047 RFI#89: Gridline-3 Seismic Wall Adjustment 0 days 0.00
048 RFI#61: Duct and Ceiling Height Confliction 0 days 3.261.41
TOTAL: $16,030.87
CHANGE ORDER LINE ITEMS:
Colvos Construction page 1 of 4 Printed On: 1/11/2021 07:48 AM
DocuSign Envelope ID:9F692A5E-E3E1-4F4A-9711-EB04C18C6213
corlvos PCCO #007
PCO#038:RFI#74:Guard Rail and Hand Rail Clarifications
# Cost Code Description Type Amount
1 06.1053-Rough Carpentry 16 Hours of Additional Labor for Additional Guardrail Other $1,280.D0
2 06-11-13-Lumber Additional Treated Lumber for the Exterior Wood Ramp Guardrails Other $400.00
3 09-91-23-Interior Painting Painting of Additional Guardrails Other $575.D0
4 01-30-23-Project Engineer 1 Hour of Project Engineer Time Other $70.00
Subtotal: $2,325.00
Bond:3.00%Applies to all line item types. 69.75
Liability Insurance:1.26%Applies to all line item types. 29.93
Contractor Fee:10.00%Applies to all line item types. 242.47
B&O Tax:0.58%Applies to all line item types. 15.47
Sales Tax:8.80%Applies to all line item types. 236.07
Grand Total: $2,918.69
PCO#039:RFI#77:Exposed Sprinkler Piping in Holding Cells
# Cost Code Description Type Amount
1 21-10-13-Fire Sprinklers Demolishing,Capping,Re-Routing,and Installing Sprinkler Heads within Wag of Other $1,763.00
Holding Cells 126&126
Subtotal: $1,763.D0
Bond:3.00%Applies to all line item types. 52.89
Liability Insurance:1.26%Applies to all line item types. 22.70
Contractor Fee:10.00%Applies to all line item types. 183.86
B&O Tax:0.58%Applies to all line item types. 11.73
Sales Tax:8.808/.Applies to all line item types. 179.01
Grand Total: $2,213 919
PCO#040:RFI#81:Holding Cell Plumbing Fixture Clarifications
# I Cost Code Description Type Amount
1 22-40-01-Plumbing Change to Plumbing Fixture based on RFI#081 Response Other $500.00
Subtotal: $500.00
Bond:3.00%Applies to all line item types. 15.D0
Liability Insurance:1.26%Applies to all line item types. 6.44
Contractor Fee:10.00%Applies to all line item types. 52.14
B&O Tax:0.58%Applies to all line item types. 3.33
Sales Tax:8.80%Applies to all line item types. 50.77
Grand Total: $627.68
PCO#042:RFI#63;Al Panel Location
# Cost Code Description Type Amount
1 26.20-13-Building Electrical Relocating Al Panel into Room Electrical Room 110 Other $2,607.60
2 26.20-13-Building Electrical Credit for 250 MC At Material and Labor Other ($169.60)
3 01-30-23-Project Engineer 1 Hr of PE Time Other $70.00
Subtotal: $2,508.00
Bond:3.00%Applies to all line item types. 75.24
Liability Insurance:1.26%Applies to all line item types. 32.29
Contractor Fee:10.00%Applies to all line item types. 261.55
B&O Tax:D.58%Applies to all line item types. 16.69
Sales Tax:8.80%Applies to all line item types. 254.65
Grand Total: $3,148.42
Colvos Construction page 2 of 4 Printed On: 1/11/2021 07:48 AM
DocuSign Envelope ID:9F692A5E-E3E1-4F4A-9711-EB04C18C6213
coLvos PCCO #007
PCO#043:Storefront and Glazing Scope of Work(PCO#026)
# Cost Code Description Type Amount
1 08-43-03-Storefronts New Glazing for Storefront Opening that is altered as well as the aluminum Other $1,196.00
cladding for 2 EA 5x2.5xl14 HSS Posts
Subtotal: $1,1II&M
Bond:3.00%Applies to all line item types. 35.88
Liability Insurance:1.26%Applies to all line item types. 15.40
Contractor Fee:Y D.00%Applies to all line item types. 124.73
B80 Tax:0.58%Applies to all line item types. 7.96
Sales Tax:8.80%Applies to all line item types. 121.44
Grand Total: $1,s01.4Y
PCO#044: RFI#90:NW Slab Reinforcing Detail
# I Cost Code Description Type Amount
1 03-3S-03-Concrete Finishing Additional Reinforcing for the NW Slab/Ramp that was not originally anticipated Other $1,880.00
Subtotal: $1,880.00
Bond:3.00%Applies to all line item types. 56.40
Liability Insurance:1.25%Applies to all line item types. 24.21
Contractor Fee:10.00%Applies to all line item types. 196.06
B&O Tax:0.68%Applies to all line item types. 12.51
Sales Tax:8.80%Applies to all line item types. 190.89
Grand Total: $2,360.07
PCO#047:RFI#89:Gridline-3 Seismic Wall Adjustment
# Cost Code Description Type Amount
1 06.1053-Rough Carpentry Credit of 16 Hours of Carpentry Time Other ($1,280.00)
2 06-11-13-Lumber Credit for Lumber and Hardware not needing to be used during Phase 1. Other ($454.00)
3 90-10-13-Contingency Add to owner Contingency Other $1,734.00
Subtotal: $0.00
Bond:3.00%Applies to all line item types. 0.00
Liability Insurance:1.26%Applies to all line Item types. 0.00
Contractor Fee:10.00%Applies to all line item types. 0.00
B&O Tax:0.58%Applies to all line item types. 0.00
Sales Tax:8.80%Applies to all line item types. 0.00
Grand Total: $0.00
PCO#048:RFI#61:Duct and Ceiling Height Confliction
# Cost Code Description Type Amount
1 09-22-16-Non-structural Metal Framing Additional GM,Finish,and Taping for Drywall at Ceiling Drop Other $1,344.00
2 09-91-23-Interior Painting Paint GWB Drops Other $128.00
3 09-51-13-Acoustical Panel Ceilings ACT Trim and Framing for Transition Other $1,am.00
4 01-30-23-Project Engineer 1 Hr of PE Time Other $70.00
Subtotal: $2,598.00
Bond:3.00%Applies to all line item types. 77.94
Liability Insurance:1.26%Applies to all line item types. 33.45
Contractor Fee:10.00%Applies to all line item types. 270.94
B&o Tax:o.sa%Applies to all line Item types. 17.29
Sales Tax:8.80%Applies to all line item types. 263.79
Grand Total: $3,261.41
Colvos Construction page 3 of 4 Printed On: 1/11/2021 07:48 AM
DocuSign Envelope ID:coLlvos
PCCO #007
The original(Contract Sum) $ 2,216,218.00
Net change by previously authorized Change Orders $ 574,139.65
The contract sum prior to this Change Order was $2,790,357.65
The contract sum would be changed by this Change Order in the amount of $ 16,030.87
The new contract sum including this Change Order will be $ 2,806,388.52
The contract time will not be changed by this Change Order by 0 days
Bruce McKean(Helix Design Group) Mason County Colvos Construction
6021 12th St E,Suite 201 411 North 5th St 711 Court C EDSTacoma Washington 98424 Shekon Washington 98584 Tacoma Washington 98402
DocuSigned by:
Soff rw&kr 1/14/2021
SIGNATURE DATE TU ATE INJIUUREM4E2... DATE
Colvos Construction page 4 of 4 Printed On: 1/11/2021 07:48 AM