Loading...
HomeMy WebLinkAboutChange Order # 007 for Colvos Construction DocuSign Envelope ID:9F692A5E-E3E1-4F4A-9711-EB04C18C6213 Colvos PCCO #007 Colvos Construction Project: - 20-031 Mason County Courthouse 711 Court C 414 West Franklin St Tacoma,Washington 98402 Shelton,Washington 98584 Phone: (253)844-4640 Prime Contract Change Order #007: Multiple PCO's (PCO #038, 039, 040, 042, 043, 044, 047, 048) �-- --- TO: Mason County I" FROM: Colvos Construction 411 North 5th St 711 Court C Shelton,Washington 98584 Tacoma Washington 98402 DATE CREATED: 1/09/2021 CREATED BY: Casey Angeline(Colvos Construction) REVISION: 0 INVOICED DATE: PAID DATE: SCHEDULE IMPACT: 0 days EXECUTED: No CONTRACT FOR: 1:20-031 Mason County Courthouse Prime TOTAL AMOUNT: $ 16,030.87 Contract DESCRIPTION: PCCO#07 encompasses all cost associated with the PCO's listed below. 1. PCO#038-Guard Rail and Hand Rail Clarifications 2. PCO#039-Exposed Sprinkler Piping in Holding Cells 3. PCO#040-Holding Cell Plumbing Fixture Clarifications 4. PCO#042-Al Panel Location 5. PCO#043-Storefront and Glazing Scope of Work(PCO#026) 6. PCO#044-NW Slab Reinforcing Detail 7. PCO#047-GL 3 Seismic Wall Adjustment 8. PCO#048-Duct and Ceiling Height Confliction ATTACHMENTS: POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# Title Schedule Impact Amount 038 RFI#74: Guard Rail and Hand Rail Clarifications 0 days 2,918.69 039 RFI#77: Exposed Sprinkler Piping in Holding Cells 0 days 2,213.19 040 RFI#81: Holding Cell Plumbing Fixture Clarifications 0 days 627.68 042 RFI#83: Al Panel Location 0 days 3,148.42 043 Storefront and Glazing Scope of Work(PCO 4026) 0 days 1,501.41 044 RFI#90, NW Slab Reinforcing Detail 0 days 2,360.07 047 RFI#89: Gridline-3 Seismic Wall Adjustment 0 days 0.00 048 RFI#61: Duct and Ceiling Height Confliction 0 days 3.261.41 TOTAL: $16,030.87 CHANGE ORDER LINE ITEMS: Colvos Construction page 1 of 4 Printed On: 1/11/2021 07:48 AM DocuSign Envelope ID:9F692A5E-E3E1-4F4A-9711-EB04C18C6213 corlvos PCCO #007 PCO#038:RFI#74:Guard Rail and Hand Rail Clarifications # Cost Code Description Type Amount 1 06.1053-Rough Carpentry 16 Hours of Additional Labor for Additional Guardrail Other $1,280.D0 2 06-11-13-Lumber Additional Treated Lumber for the Exterior Wood Ramp Guardrails Other $400.00 3 09-91-23-Interior Painting Painting of Additional Guardrails Other $575.D0 4 01-30-23-Project Engineer 1 Hour of Project Engineer Time Other $70.00 Subtotal: $2,325.00 Bond:3.00%Applies to all line item types. 69.75 Liability Insurance:1.26%Applies to all line item types. 29.93 Contractor Fee:10.00%Applies to all line item types. 242.47 B&O Tax:0.58%Applies to all line item types. 15.47 Sales Tax:8.80%Applies to all line item types. 236.07 Grand Total: $2,918.69 PCO#039:RFI#77:Exposed Sprinkler Piping in Holding Cells # Cost Code Description Type Amount 1 21-10-13-Fire Sprinklers Demolishing,Capping,Re-Routing,and Installing Sprinkler Heads within Wag of Other $1,763.00 Holding Cells 126&126 Subtotal: $1,763.D0 Bond:3.00%Applies to all line item types. 52.89 Liability Insurance:1.26%Applies to all line item types. 22.70 Contractor Fee:10.00%Applies to all line item types. 183.86 B&O Tax:0.58%Applies to all line item types. 11.73 Sales Tax:8.808/.Applies to all line item types. 179.01 Grand Total: $2,213 919 PCO#040:RFI#81:Holding Cell Plumbing Fixture Clarifications # I Cost Code Description Type Amount 1 22-40-01-Plumbing Change to Plumbing Fixture based on RFI#081 Response Other $500.00 Subtotal: $500.00 Bond:3.00%Applies to all line item types. 15.D0 Liability Insurance:1.26%Applies to all line item types. 6.44 Contractor Fee:10.00%Applies to all line item types. 52.14 B&O Tax:0.58%Applies to all line item types. 3.33 Sales Tax:8.80%Applies to all line item types. 50.77 Grand Total: $627.68 PCO#042:RFI#63;Al Panel Location # Cost Code Description Type Amount 1 26.20-13-Building Electrical Relocating Al Panel into Room Electrical Room 110 Other $2,607.60 2 26.20-13-Building Electrical Credit for 250 MC At Material and Labor Other ($169.60) 3 01-30-23-Project Engineer 1 Hr of PE Time Other $70.00 Subtotal: $2,508.00 Bond:3.00%Applies to all line item types. 75.24 Liability Insurance:1.26%Applies to all line item types. 32.29 Contractor Fee:10.00%Applies to all line item types. 261.55 B&O Tax:D.58%Applies to all line item types. 16.69 Sales Tax:8.80%Applies to all line item types. 254.65 Grand Total: $3,148.42 Colvos Construction page 2 of 4 Printed On: 1/11/2021 07:48 AM DocuSign Envelope ID:9F692A5E-E3E1-4F4A-9711-EB04C18C6213 coLvos PCCO #007 PCO#043:Storefront and Glazing Scope of Work(PCO#026) # Cost Code Description Type Amount 1 08-43-03-Storefronts New Glazing for Storefront Opening that is altered as well as the aluminum Other $1,196.00 cladding for 2 EA 5x2.5xl14 HSS Posts Subtotal: $1,1II&M Bond:3.00%Applies to all line item types. 35.88 Liability Insurance:1.26%Applies to all line item types. 15.40 Contractor Fee:Y D.00%Applies to all line item types. 124.73 B80 Tax:0.58%Applies to all line item types. 7.96 Sales Tax:8.80%Applies to all line item types. 121.44 Grand Total: $1,s01.4Y PCO#044: RFI#90:NW Slab Reinforcing Detail # I Cost Code Description Type Amount 1 03-3S-03-Concrete Finishing Additional Reinforcing for the NW Slab/Ramp that was not originally anticipated Other $1,880.00 Subtotal: $1,880.00 Bond:3.00%Applies to all line item types. 56.40 Liability Insurance:1.25%Applies to all line item types. 24.21 Contractor Fee:10.00%Applies to all line item types. 196.06 B&O Tax:0.68%Applies to all line item types. 12.51 Sales Tax:8.80%Applies to all line item types. 190.89 Grand Total: $2,360.07 PCO#047:RFI#89:Gridline-3 Seismic Wall Adjustment # Cost Code Description Type Amount 1 06.1053-Rough Carpentry Credit of 16 Hours of Carpentry Time Other ($1,280.00) 2 06-11-13-Lumber Credit for Lumber and Hardware not needing to be used during Phase 1. Other ($454.00) 3 90-10-13-Contingency Add to owner Contingency Other $1,734.00 Subtotal: $0.00 Bond:3.00%Applies to all line item types. 0.00 Liability Insurance:1.26%Applies to all line Item types. 0.00 Contractor Fee:10.00%Applies to all line item types. 0.00 B&O Tax:0.58%Applies to all line item types. 0.00 Sales Tax:8.80%Applies to all line item types. 0.00 Grand Total: $0.00 PCO#048:RFI#61:Duct and Ceiling Height Confliction # Cost Code Description Type Amount 1 09-22-16-Non-structural Metal Framing Additional GM,Finish,and Taping for Drywall at Ceiling Drop Other $1,344.00 2 09-91-23-Interior Painting Paint GWB Drops Other $128.00 3 09-51-13-Acoustical Panel Ceilings ACT Trim and Framing for Transition Other $1,am.00 4 01-30-23-Project Engineer 1 Hr of PE Time Other $70.00 Subtotal: $2,598.00 Bond:3.00%Applies to all line item types. 77.94 Liability Insurance:1.26%Applies to all line item types. 33.45 Contractor Fee:10.00%Applies to all line item types. 270.94 B&o Tax:o.sa%Applies to all line Item types. 17.29 Sales Tax:8.80%Applies to all line item types. 263.79 Grand Total: $3,261.41 Colvos Construction page 3 of 4 Printed On: 1/11/2021 07:48 AM DocuSign Envelope ID:coLlvos PCCO #007 The original(Contract Sum) $ 2,216,218.00 Net change by previously authorized Change Orders $ 574,139.65 The contract sum prior to this Change Order was $2,790,357.65 The contract sum would be changed by this Change Order in the amount of $ 16,030.87 The new contract sum including this Change Order will be $ 2,806,388.52 The contract time will not be changed by this Change Order by 0 days Bruce McKean(Helix Design Group) Mason County Colvos Construction 6021 12th St E,Suite 201 411 North 5th St 711 Court C EDSTacoma Washington 98424 Shekon Washington 98584 Tacoma Washington 98402 DocuSigned by: Soff rw&kr 1/14/2021 SIGNATURE DATE TU ATE INJIUUREM4E2... DATE Colvos Construction page 4 of 4 Printed On: 1/11/2021 07:48 AM