HomeMy WebLinkAboutChange Order # 005 for Colvos Construction DocuSign Envelope ID:022784FA-3151-4175-8289-1385A28E0571 coLvos PCCO #005 Colvos Construction Project: - 20-031 Mason County Courthouse 711 Court C 414 West Franklin St Tacoma,Washington 98402 Shelton,Washington 98584 Phone: (253)279-7887 Prime Contract Change Order #005: Multiple PCO's (PCO #020902f 10?12,02,,3,02�4,025,02�,027,028,029,030,031,033,035) TO: Mason County FROM: Colvos Construction 411 North 5th St 711 Court C Shelton,Washington 98584 Tacoma Washington 98402 DATE CREATED: 11/13/2020 CREATED BY: Casey Angeline(Colvos Construction) REVISION: 0 INVOICED DATE: PAID DATE: SCHEDULE IMPACT: 0 days EXECUTED: No CONTRACT FOR: 1:20-031 Mason County Courthouse Prime TOTAL AMOUNT: $85,994.17 Contract DESCRIPTION: PCCO#05 encompasses all cost associated with the PCO's listed below. 1. PCO#020-Ramp Clarifications 2. PCO#021-GL-B Wall Repair,Drain Removal,and Additional Anchors 3. PCO#022-Existing Joist Gaps 4. PCO#023-NE Existing Louver Clarification 5. PCO#024-Final Permit Revisions 6. PCO#025-Roof Hatch Access Ladder 7. PCO#026-Automatic Entrance Door Structure 8. PCO#027-Door 137E Alternate 9. PCO#028-Roofing Scope of Work 10. PCO#029-Auto Door Hardware Funcitonality 11. PCO#030-Ceiling Cover Clarifications 12. PCO#031-Ceiling Repairs 13. PCO#033-P-1 Light Fixture Revision 14. PCO#035-Concrete Admixture Credit ATTACHMENTS: POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# Title Schedule Impact Amount 020 Ramp Clarifications 0 days 1,280.46 021 GL-B Wall Repair, Drain Removal,and Additional Anchors 0 days 12,011.30 022 Existing Joist Gaps 0 days 2,100.48 023 NE Existing Louver Clarification 0 days 6,222.85 024 Final Permit Revisions 0 days 39,069.92 025 RFI#25: Roof Hatch Access Ladder 0 days 2,077.61 026 RFI#12: Automatic Entrance Door Structure 0 days 17,790.84 027 RFI#28: Door 137B Alternate 0 days 0.00 028 RFI#57: Roofing Scope of Work 0 days 0.00 029 RFI#62,Auto Door Hardware Functionality 0 days 2,840.87 030 RFI#54: Ceiling Cover Clarifications 0 days 1,721.09 031 RFI#55:Ceiling Repairs 0 days 878,75 033 RFI#66 P-1 Light Fixture Revision 0 days 0,00 035 Concrete Admixture Credit 0 days 0.00 Colvos Construction page 1 of 6 Printed On: 11/19/2020 12:24 PM DocuSign Envelope ID:022784FA-3151-4175-8289-1385A28E0571 t PCCO #005 TOTAL: $85,994.17 CHANGE ORDER LINE ITEMS: PCO#020:Ramp Clarifications # Cost Code Description Type Amount 1 06-11-13-Lumber Additional Lumber and Hardware Required per RFI#031 Response Other $300.00 2 0&10-53-Rough Carpentry Additional 8 Hours of Labor for Post Detail Clarification and Additional Post Other $640.D0 3 01-30-23-Project Engineer 1 Hr of PE Time Other $80.00 Subtotal: $1,020.00 Bond:3.00%Applies to all line item types. 30.60 Liability Insurance:1.26%Applies to all line item types. 13.13 Contractor Fee:10.00%Applies to all line item types. 106.37 9&O Tax:0.580 Applies to all line item types. 6.79 Sales Tax:&80%Applies to all line item types. 103.57 Grand Total: $1,280.46 PCO#021 :GL-B Wall Repair,Drain Removal,and Additional Anchors # Cost Code Description Type Amount 1 02-41-00-Demolition Demolition of Vents,Drains,and Cleanouts Other $4,908.00 2 05-11-13-Lumber Lumber for new wall at Gridline B Other $460.00 3 06.1053-Rough Carpentry Labor for new wall at Gridline B Other $1,280.00 4 01-30-23-Project Engineer 8 Hm of PE Time @$70/Hr Other $550 00 5 01-30-19-Project Manager 4 Hr of PM Time Other $450.00 6 03-36-03-Concrete Finishing Concrete Material and labor for Core and Drain Infills Other $1,500.00 7 06.11-13-Lumber Tden HD for CMU Voids Other $80.08 8 06-1053-Rough Carpentry Labor to install additional Titan HO Anchors Other $320.00 Subtotal: $9,568.08 Bond:3.00%Applies to all line item types. 287.04 Liability Insurance:1.26%Applies to all line item types. 123.19 Contractor Fee:10.00%Applies to all line item types. 997.83 B&O Tax:0.58%Applies to all line item types. 53.66 Sales Tax:&80%Applies to all line item types. 971.50 Grand Total: $12,011.30 PCO#022:Existing Joist Gaps # Cost Code Description Type Amount 1 06.11-13-Lumber Lumber and Hardware for Additional 2x12 Joists Other $253.22 2 06.1053-Rough Carpentry 16 Hours of Labor to Instal additional joists full spanned joist Other $1,280.00 3 01-30-23-Project Engineer 2 Hrs of PE Time at$70/Hr Other $140.D0 Subtotal: $1,673.22 Bond:3.00%Applies to all line Item types. 50.20 Liability Insurance:1.25%Applies to all line Item types. 21.54 Contractor Fee:10.00%Applies to all line Item types. 174.50 B&O Tax:D.58%Applies to all line Item types. 11.13 Sales Tax:8.80%Applies to all line item types. 159.89 Grand Total: $2,100.48 Colvos Construction page 2 of 6 Printed On: 11/19/2020 12:24 PM DocuSign Envelope ID:022784FA-3151-4175-8289-1385A28E0571 colvos PCCO #006 PCO#023:NE Existing Louver Clarification # Cost Code Description Type Amount 1 04-30-06-CMU Additional Louver Infils Other $4,345.06 2 02-41-30-Demolition Removal of(3)Existing Louvers that were not shown on the drawings Other $192,00 3 06.10-S3-Rough Carpentry Labor to Safe-Off Openings Other $320.00 4 06-11-13-Lumber Lumber for Safe-Off of Openings Other $100.00 Subtotal: $4,957,06 Bond:&00%Applies to all line item types. 148.71 Liability insurance:1.26%Applies to all line item types. 63.82 Contractor Fee:10,00%Applies to all line item types. 516.96 B&O Tax:0.681A Applies to all line item types. 32.98 Sales Tax:8.80%Applies to all line item types. 503.32 Grand Total: $6,222.86 PCO#024:Final Permit Revisions # Cost Code Description Type Amount 1 02-41.30-Demolition Demolish HM Door and Frame,Demolish Opening for new Door, Demolish/Excavate for new ramp. Other $10,116.00 2 04-30-06-CMU Additional Infil for(1 EA)Door and CMU Detailing around(1 EA)new door i Other $6,017,39 opening. 3 05-50.30-Metal Railings Supply and Instal Approximately 11 LF of Pipe Rail and 14 LF of Hand Rail at Other $3,325.00 new Concrete Ramp 4 03.35-03-Concrete Finishing Formwork,Reinforcing,Placement,and Finishing of New Concrete at the NW Other $7,894.29 Ramp 5 01.30.23-Project Engineer 4 Hours of PE Time Other $200.00 6 01-30-19-Project Manager 2 Hours of PM Time Other $230.00 7 09-91-23-Interior Painting Painting of Railings at new Concrete Ramp Other $500.00 8 06-1053-Rough Carpentry 32 Hours for Layout.Temporary Security Cover,Door Bucking,and return trip for Other $2,S6D,00 Seismic Wag Construction 9 06-11-13-Lumber Lumber for Door Bucking and Temporary Security Opening Other $200.00 Subtotal: $31,122.68 Bond:&00%Applies to all line item types. 933.68 Liability Insurance:1.26%Applies to all line Rem types. 400.70 Contractor Fee:10.00%Applies to all line Rem types. 3,245.71 B&O Tax:0.68%Applies to all line item types. 207.08 Sales Tax:8.802A Applies to all line item tvpes. 3A 60.07 Grand Total: $39,069.92 PCO#025:RFI#25:Roof Hatch Access Ladder # Cost Code Description Type Amount 1 02-61-23-Asbestos Abatement Asbestos Abatement and Removal of Existing Roof Hatch Other $375.00 2 06-10-53-Rough Carpentry 6 Hours of Carpenter time to install infil framing below where the roof hatch used to be. ether $640.00 3 01-30-23-Project Engineer 2 His of PE Time Other $140.00 4 0&11-13-Lumber Lumber for Wood Framing Infill where Roof Hatch previously was bested Other $500.00 Subtotal: $1,6SS.00 Bond:3.00%Applies to all line item types. 49.65 Liability Insurance:1.25%Applies to all line Rem types. 21.31 Contractor Fee:10.00°/6 Applies to all line item types. 172.60 B&O Tax:0.58%Applies to all line Rem types. 11.01 Sales Tax:&80-A Applies to all line Rem types. 168.04 Grand Total: $2,077.61 Colvos Construction page 3 of 6 Printed On: 11/19/2020 12:24 PM DocuSign Envelope ID:022784FA-3151-4175-8289-1385A28E0571 corlvos PCCO #005 PCO#026:RFI#12:Automatic Entrance Door Structure # Cost Code Description Type Amount 1 03-80-03-Concrete Cutting Removal of Concrete where new HSS Posts will be installed. Other $1,180.00 2 0S-20-03-Structural Steel 2 EA-5x2.5xl14 HSS Columns Other $3,244.DD 3 03-35-03-Concrete Finishing Concrete Pourbacks for the new footing and slab removal. Other $1,794.00 4 01-30-23-Project Engineer 2 Hm of PE Time Other $140.00 5 01-54-23-Temporary ScaffoldlPlatforms Temporary Shoring to support existing structure Other $4,894.00 6 06.10-53-Rough Carpentry 24 Hours for constructing and removing temporary opening cover Other $1,920.00 7 06-11-13-Lumber Lumber and Hardware for Temporary Opening Cover Other $1.000.00 Subtotal: $14,172.DO Bond:&00%Applies to all line item types. 425.16 Liability Insurance:1.25%Applies to all line item types. 182.46 Contractor Fee:10.00%Applies to all line item types. 1.477,96 B&O Tax:0.68%Applies to all line item types. 94.29 Sales Tax:8.80%Applies to all line item types. 1,438.97 Grand Total: $17,79M" PCO#027:RFI#28:Door 137E Alternate # Cost Code Description Type Amount 1 08-11-16-Metal Doors and Frames Deduct for Changing Door 137E from STC 43 to Standard Door Other ($3,245.00) 2 08-11-16-Metal Doors and Frames Add for Standard Door with Sound Gasketing,Auto Door Bottom and Threshold Other $720.00 3 90.10-13-Contingency Credit Amount from Door 137E Change that will be moved to Owner Other $2,525.00 Contingency Subtotal: $0.00 Bond:3.00%Applies to all line item types. 0.00 Liability Insurance:1.26%Applies to all line Item types. 0.00 Contractor Fee:10.00%Applies to all line Item types. 0.00 B&O Tax:0.58%Applies to all line Item types. 0.00 Sales Tax:&BO%Applies to all line item types. 0.00 Grand Total: $0.00 PCO#028:RFI#57:Roofing Scope of Work it Cost Code Description Type Amount 1 07-54-13-Thermoplastic Membrane Roofing Deductive Change Order to Transfer Cost Responsibility from Colvos Other ($5,000.00) Construction to Mason County 2 90.10-13-Contingency Add to Owner Contingency for Removal of Roofing Scope of Work Other $5,000.00 Subtotal: $0.D0 Bond:3.00%Applies to all line item types. 0.00 Liability Insurance:1.26%Applies to all line item types. 0.00 Contractor Fee:10.00%Applies to all line item types. 0.00 B&O Tax:0.68%Applies to all line item types. 0.00 Sales Tax:&B(PA Applies to all line item types. O.DO Grand Total: $0.00 Colvos Construction page 4 of 6 Printed On: 11/19/2020 12:24 PM DocuSign Envelope ID:022784FA-3151-4175-8289-1385A28E0571 corLvos PCCO #006 PCO#029: RFI#62:Auto Door Hardware Functionality # Cost Code Description Type Amount 1 08-42-29-Automatic Entrances Panic Exit Devices with Auto Locks as well as(1 EA)door jamb-mounted on/oft Other $2,123.00 keyswitch 2 01-30-23-Project Engineer 2 Hours of PE Time Other $140.00 Subtotal: $2,263.00 Bond:3.00%Applies to all line item types. 67.89 Liability Insurance:1.25%Applies to all line item types. 29.14 Contractor Fee:10.00%Applies to all line item types. 236.00 B&O Tax:0.58%Applies to all line item types. 15.06 Sales Tax:8.80%Applies to all line item types. 229.78 Grand Total: $2,840.87 PCO#030:RFI#54:Ceiling Cover Clarifications # Cost Code Description Type Amount 1 07-21-16-Blanket Insulation Additional Insulation at Exposed Ceiling Other $1,051.00 2 06-10-53-Rough Carpentry 4 Hours of Labor for additional sheathing to cover insulation Other $320.00 Subtotal: $1,371.00 Bond:3.00%Applies to all line item types. 41.13 Liability Insurance:1.25%Applies to all line item types. 17.65 Contractor Fee:10.00%Applies to all line item types. 142.98 B&O Tax:0.58%Applies to all line item types. 9.12 Sales Tax:8.30%Applies to all line item types. 139.21 Grand Total: $1,721.09 PCO#031 : RFI#55:Ceiling Repairs # Cost Code Description Type Amount 1 07-21-16-Blanket Insulation Additional Insulation needed at Ceiling above Auto Entrance where existing ceiling is broken. Other $190.00 Additional Sheathing and Blocking Required to replace broken ceiling above 2 06-11-13-Lumber Other Auto Entrance $350.00 3 06-10-53-Rough Carpentry 2 Hours of Additional Labor to install additional sheathing above Auto Entrance Other $150.00 Subtotal: $700.00 Bond:3.00%Applies to all line item types. 21.00 Liability Insurance:1.25%Applies to all line item types. 9.01 Contractor Fee:10.00%Applies to all line item types. 73.00 B&O Tax:0.58%Applies to all line item types. 4.66 Sales Tax:8.80%Applies to all line item types. 71.08 Grand Total: $878.75 PCO#033: RFI#66:P-1 Light Fixture Revision # Cost Code Description Type Amount 1 26-20-13-Building Electrical Revised P-1 Lighting Fixture Other ($4,600.00) 2 90-10-13-Contingency Credit to owner Contingency Other $4,600.00 Subtotal: $0.00 Bond:3.00%Applies to all line item types. 0.00 Liability Insurance:1.25%Applies to all line item types. 0.00 Contractor Fee:10.00%Applies to all line item types. 0.00 B&O Tax:0.58%Applies to all line item types. 0.00 Sales Tax:8.80%Applies to all line item types. 0.00 Grand Total: $0.00 Colvos Construction page 5 of 6 Printed On: 11/1912020 12:24 PM DocuSign Envelope ID:022784FA-3151-4175-8289-1385A28E0571 coLvos PCCO #005 PCO#035:Concrete Admixture Credit # Cost Code Description Type Amount 1 03.35-03-Concrete Finishing Credit for Admixtures,Accelerators,and Blankets that were not used Other ($5,890.00) 2 90.10-13-Contingency Credit amount that will be transferred to Owner Contingency Other $5,890.00 Subtotal, $0.00 Bond:3.00%Applies to all line item types. 0.00 Liability Insurance:1.26%Applies to all line Item types. 0.00 Contractor Fee:10.00%Applies to a8line item types. 0.00 B&O Tax:0.68%Applies to all line item types. 0.00 Sales Tax:8.80%Applies to all line item types. 0.00 Grand Total: $0.00 The original(Contract Sum) $2,216,218.00 Net change by previously authorized Change Orders $483,555.92 The contract sum prior to this Change Order was $ 2,699,773.92 The contract sum would be changed by this Change Order in the amount of $ 85,994.17 The new contract sum including this Change Order will be $2,785,768.09 The contract time will not be changed by this Change Order by 0 days Bruce McKean(Helix Design Group) Mason County Colvos Construction Es' 6021 12th St E,Suite 201 411 North 5th St 711 Court C Tacoma Washington 98424 Shelton Washington 98584 Tacoma Washington 98402 DocuSigned by: 11/23/2020 SIGNATURE DATE AT DATE NAfE3B4E2... DATE Colvos Construction page 6 of 6 Printed On:11/19/2020 12:24 PM