Loading...
HomeMy WebLinkAbout2022-019 - Res. for County Road Projects 2035 Boyer Road and 2036 Snider Road BEFORE THE BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY,WASHINGTON. In the matter of initiating county road projects and assigning CRP numbers. IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated. RESOLUTION NO.2022- O Iq These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed as by law provided.(RCW 36.75.050,36.80.030,36.80.070 and/or WAC 136-18-030). IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineers estimates are hereby made in the amount and for the purposes shown: Cost Estimate(Thousand$) 2021 , Annual M.P. 1 Type of Road Name or Road LogContract and/or Project CRP No. Const. Bridge No. No. Project Name to ; Work Local Grant Engr R/W County Forces Total Prog.Item M.P. 1(See Code) No. ' 2035 03 Boyer Road 03630 Resurfacing Project 0.00-0.50 C 50 50 50 2036 04 Snider Road 19210 Resurfacing Project 0.00-0.18 C 40 40 40 90 0 0 0 90 1 90 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (6) TYPE OF WORK CODE A.Grading and Drainage F.Sidewalks K.Environmental Mitigation (11) The construction is to be accomplished by contract B. Base&Top Course G.Traffic Facilities L.Fish Passage in accordance with RCW 36.77.020 et.seq.AND/OR C. B.S.T./SEALS H.Paths,Trails,Bikeways(RCW 47.3 The construction is to be accomplished by county D.A.C./P.C.C.Pavement I. Bridges forces in accordance with RCW 36.77.065 and WAC 136.18 E.Curbs and Gutters J. Ferry Facilities ADOPTED this of Ma)nC�N 2022 BOARD OF COUNTY COMMISSIONERS MASON CO SHINGTON ATTEST: IL mu<l Q/7 V I A W X`(Y\� � Kevin Shutty,Ch r McKenzie Smith, Jerk bf the Board APPROVE AS TO FORM: aron Trask,Vice Chair Tim to d, Ch.D.P.A Ra y Ne horlin,Commissioner cc: Commissioners Engineer JOURNAL: Publ.lt: /3 24/22(Bill Rd Dept.)