HomeMy WebLinkAbout2022-015 - Ord. Amending the Belfair Urban Growth Area Subarea Plan and Comprehensive Plan ORDINANCE NUMBER O -0ID
AMENDMENTS TO THE BELFAIR URBAN GROWTH AREA SUBAREA PLAN AND
COMPREHENSIVE PLAN
ORDINANCE adopting amendments to the Belfair Urban Growth Area (UGA) Subarea Plan and
Mason County Comprehensive Plan.
WHEREAS, under the authority of the Washington State Growth Management Act (GMA)
(RCW 36.70A) Mason County is taking legislative action to revise its comprehensive plan; and
WHEREAS, Mason County prepared a Planned Action Environmental Impact Statement(PAEIS)
for the Belfair UGA; and
WHEREAS, the Belfair UGA Subarea Plan was amended to align with the Preferred Alternative
of the PAEIS; and
WHEREAS, the Mason County Comprehensive Plan was amended to align with the Preferred
Alternative of the PAEIS; and
WHEREAS, on June 7 and December 6, 2021 the Mason County Planning Advisory Commission
held a public hearing to consider the amendments and passed a motion to recommend
approval of said amendments; and
WHEREAS, the Board of County Commissioners considered the updated Subarea Plan and
Comprehensive Plan at a duly advertised public hearing on February 15, 2022; and
WHEREAS,the Board of County Commissioners took public testimony from interested parties,
considered all the written and oral arguments, testimony and comments presented; and
WHEREAS, the Board of County Commissioners also considered the Staff Report and
recommendations of the Mason County Planning Advisory Commission; and
WHEREAS, the Board of County Commissioners finds that the updated Subarea Plan and
Comprehensive Plan complies with all applicable requirements of the Growth Management
Act, the Comprehensive Plan, and the Mason County Code, and that it is in the best public
interest; and
NOW THEREFORE BE IT HEREBY ORDAINED, the Mason County Board of Commissioners
hereby approves and ADOPTS amendments to the Belfair Urban Growth Area Subarea Plan
and the Comprehensive Plan amendments, which is attached hereto as Exhibit A.
DATED this day of 2022.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY, WASHINGTON
ATTEST:
MuQL'V 4�IW Kevin Shutty, Chair
McKenzie SrrWth, Clerk of the Board
APPROVED AS TO FORM: Sharon Trask, Commissioner
CA
Tim White , Chief DPA Randy Nfeaiherlin, Commissioner
z
BELFAIR
; URBAN GROWTH AREA
PLAN
December 2003
.. Updated February 2022
r ,
=s
. w 'A
�jY o `� �y�ye`r•
Prepared b%':
MAKERS
Prepared for:Mason County Heffron Transportation,inc.
ECONorthwest
MacLeod Reckord
2022 Plan update prepared by:
BERK Consulting,Inc.
MAKERS
The Transpo Group,Inc.
Herrera Environmental
FINAL—February 25, 2022
2004 Plan Credits
Belfair Sub-Area Planning Committee
Brian Peterson, Co-Chair Brigmon Lohman Charlie Benton
Bob Fink,Co-Chair Peter Merrill,Jr. Brian McLellan
Jack Johnson Steve Clayton Dan Hannafious
Dan Teeters Robert Hager Mark Flatau
Ken VanBuskirk Jacy Griffin Tim Wing
Fran Abbott Harry Martin Fred Barrett
Valerie McLeod Margie Kaiser Jack Nicklaus
Lee Swoboda Judy Scott Mike Boyle
David Overton Brian Davis Catherine Ann Woof
Washington Department of Community, Trade and
Economic Development
Mason County, Washington
Port of Allyn
North Mason Chamber of Commerce
Consultant Team
MAKERS ARCHITECTURE HEFFRON TRANSPORTATION
AND URBAN DESIGN Marni Heffron
John Owen Laura Van Dyke
Bob Bengford MACLEOD RECKORD
Thanasorn Kamolratanayothin
Terry Reckord
Janis Ford
ECONORTHWEST
Chris Mefford
BELFAIR UGA PLAN 2
FINAL—February 25, 2022
2021 Plan Credits
Mason County Planning Advisory Commission
Aaron Cleveland
Brian Smith
Darin Holland
Isaiah Johnston
Joseph Myers
Mac McLean
Consultant Team
MAKERS ARCHITECTURE AND URBAN DESIGN
John Owen
Bob Bengford
Ian Crozier
BERK CONSULTING INC.
Lisa Grueter
Kevin Gifford
Rebecca Fornaby
THE TRANSPO GROUP, INC.
Stephanie Herzstein
HERRERA ENVIRONMENTAL
Matt Fontaine
Belfair UGA PLAN 3
FINAL—February 25, 2022
Belfair Urban Growth Area Plan
December 2, 2003 — Updated February 2022
Table of Contents
Introduction..................................................................................................................................................5
Background & Purpose .............................................................................................................................5
PlanningProcess.......................................................................................................................................6
ExistingConditions......................................................................................................................................12
LandUses................................................................................................................................................12
Circulation...............................................................................................................................................14
NaturalEnvironment ..............................................................................................................................15
Pedestrian Network and Trails................................................................................................................16
EconomicConditions ..............................................................................................................................17
PlanOverview.............................................................................................................................................18
Vision.......................................................................................................................................................18
StrategicConcept....................................................................................................................................25
Recommendations......................................................................................................................................27
Land Use and Community Design...........................................................................................................27
Transportation ........................................................................................................................................47
Parks,Trails, Open Space, and Public Facilities.......................................................................................48
Water Quality Recommendations ..........................................................................................................51
ImplementationStrategy............................................................................................................................52
ImplementationUpdates........................................................................................................................53
BELFAIR UGA PLAN 4
FINAL—February 25, 2022
Introduction
Background & Purpose
Unincorporated Belfair is the primary
commercial center in the Northeast
corner of North Mason County. In 2003 JEFFERSON
COUNTY
Mason County identified Belfair as an
Urban Growth Area (UGA) of
approximately 2,400 acres.The current >� �' KITSAP SEATTLE
population within the UGA is COUP
approximately 1,100. However, Belfair
BREMERTON
serves residents within a larger rural ��� PORT ORCHARD
geographic area with a population of
approximately 23,000 as well as
LIELFAIR
tourists visiting the Hood Canal and
fv1AS�f
unique Theler Wetlands. COUNT)
GIG HARBOR
Given Belfair's status as an Urban
r
Growth Area, its location, market
conditions,and planned infrastructure TACOMA
SHELTON
investments a substantial increase in
population and land use activities are <} PIERCE
expected within the UGA boundaries COUNTY
over the next twenty-plus years. Mason Hi I
County's 2016 Comprehensive Plan O"PIA
projected a 2036 combined population } ,;
of 4,720 for Belfair and nearby Allyn, an
increase of 1,730 or 58%growth over Figure 1. Belfair Context
20 years. However, past projections of major growth have not been born out.The County's 1994
population estimate for the UGA projected up to 4,000 people by 2014, significantly above actual
growth. The Market Analysis (see Appendix 2) completed in 2003 with this plan projected a growth rate
ranging from 3-5%annually,suggesting a population just under 2,000 for the UGA by 2020 at the high
end.Actual results have come in closer to the Market Analysis projections, however,the Market
Analysis also identified several factors that could accelerate growth:available developable land,
infrastructures improvements and amenities, and demand for multifamily housing.As of 2021,the
County is reviewing permits for several urban single family and multifamily developments that would
BELFAIR UGA PLAN 5
FINAL—February 25, 2022
achieve the lower 2036 Belfair growth target years ahead of the planning horizon.While the general
planning horizon of this Plan is twenty years, a key goal of the Belfair Planning Committee was to
consider a much longer time period in the formulation of the Plan and its recommendations.
Consequently,this means planning for ultimate populations well above current levels.
While new development is on the rise in Belfair,the town is developing a particular character or'theme'
based around the Theler Wetlands as a conservation, recreation, and education destination.The Pacific
Northwest Salmon Center constructed in 2009 has cemented this theme and is a tourism draw and
located just abutting the Belfair UGA. It is anticipated that 300,000 people will visit the Salmon Center
annually.
Belfair is home to over 180 businesses located mostly along State Route 3 (SR-3), a busy arterial
cluttered by power lines and competitive signage. Ongoing planning efforts have focused on a desire to
make the town more attractive and pedestrian-friendly by allowing continued infill development and
housing near the commercial village. Recent construction of the sewer system in and improvements to
SR-3 will encourage such downtown development.These improvements and other water quality
measures have helped begin environmental clean-up of pollution in several lower rivers and streams in
and around Belfair.
Belfair appears to be primed for growth.The planned sewer and transportation improvements will
stimulate downtown development while regional projects, such as the Tacoma Narrows Bridge and the
industrial development of Puget Sound Industrial Center-Bremerton (PSIC-Bremerton)to the north,
increase growth pressure on the entire Belfair UGA. Expansion of commercial and industrial activity in
the northeast part of the UGA will add much needed family-wage jobs for area residents.The addition of
pedestrian facilities, continued development of a consistent town theme, an improved local economy
and the on-going programs at the Pacific Northwest Salmon Center will serve to make Belfair a
destination well into the foreseeable future.
Planning Process
Original Plan 2002-2004
The County hired the consultant team of MAKERS Architecture and Urban Design (lead consultant), Berk
and Associates, Heffron Transportation, and MacLeod Reckord in November 2002 to assist the
community in developing the Belfair sub-area plan.The consultant team worked directly with Mason
County and Belfair Planning Committee members to facilitate the process.
Specific events and activities included:
• November 26,2002—Planning Committee Meeting:This was the project kick-off meeting and
included introduction of the consultant team, County staff members, and Planning Committee
BELFAIR UGA PLAN 6
FINAL—February 25, 2022
members.Together,the team discussed the project scope and procedures, direction for
economic study,and committee members' individual thoughts and objectives, and summarized
information collected to date.
• January 21,2003—Planning Committee Meeting: Following up the last meeting,the project
team summarized planning activities including site visit, review of background planning
information and base map preparation.The team then reported on the existing conditions,
"Mirror on the Community,"from an outsiders' perspective.Chris Mefford of Berk and
Associates presented the findings from market study.The team discussed the upcoming
workshop.
• February 8,2003—Workshop#1:There
were about 80 people attending the first
workshop at Belfair Assembly of God
Church. Following introductions about the
plan by Makers, Chris Mefford summarized
economic conditions and opportunities.
The
• workshop involved small group sessions
taking part in mapping exercise and visual `
preference surveys.The mapping exercise —
gave each group a chance to identify
problems, issues, and opportunities related '
to land use and development,streetscape
and circulation,and parks and recreation
on the map which then be hung up on the "
wall and be presented to the group as a tom`
g
t
whole. �.
• February 18,2003—Planning Committee
r
Meeting:The consultant team summarized
results from the first workshop. Makers led
a discussion on sketch preliminary
alternatives related to redevelopment Figure 2. Workshop#t1:Map exercise and
ideas, circulation improvements, land visual preference survey
use/population patterns, connections, and design character.
BELFAIR UGA PLAN 7
FINAL—February 25, 2022
discussion. Before adjourning,the team discussed the format and outreach for the second
workshop.
i w low ,
f ,
Figure 3. Workshop##2
• April 26, 2003—Workshop#2: Makers presented a summary the results from the first workshop
to the numerous community participants.The consultant team then presented three land use
alternatives,transportation options,and trails and open spaces options.Afterward,the
participants were broken into small groups to evaluate land use alternatives and circulation
options and to prioritize trails and open spaces options.
• May 20, 2003—Planning Committee Meeting: Makers presented the results of the second
workshop and presented preliminary ideas for preferred alternative including plan concept, land
use,circulation, parks and trails, and community design.
• August 19,2003—Planning Committee Meeting: Makers summarized comments on draft plan
and draft design standards. Meeting participants discussed proposed zoning district boundaries
and designations.
• August 26,2003—Planning Committee Meeting: Participants reviewed the draft design
standards.
• October 27, 2003—Updated UGA Plan Draft and Development Regulations are submitted to
the Planning Committee: Committee members have the opportunity to review the plan and
draft development regulations prior to the final public workshop.
• November 8,2003—Workshop#3: More than 130 participants attended this workshop to
review the final draft plan and development regulations. Participants completed surveys
BELFAIR UGA PLAN 8
FINAL—February 25, 2022
prioritizing key plan actions and provided a range of comments on plan and development
regulation details.
• November 18,2003—Planning Committee Meeting:After reviewing survey results from the
workshop and discussing final changes to the plan,the Planning Committee voted to
recommend adoption of the plan.
• April-December,2004—Public Hearings and Workshops:The Planning Advisory Commission
held a series of five public hearings and several workshops on the recommendation and related
amendments between April 2004 and October 2004. A final public hearing was held on
December 7, 2004.
• December 28,2004—Adoption:The Mason County Board of Commissioners voted to adopt the
UGA plan, related development code amendments, and zoning map.
2020-2021 PLAN UPDATE
Since 2004 major progress has been made on the infrastructure investments recommended in the
Belfair UGA plan. Because these investments are expected to trigger significant near-term growth,the
County decided to pursue a Planned Action Environmental Impact Statement and ordinance for the
Belfair UGA to facilitate growth reflective of a community-supported vision.This UGA plan was updated
in conjunction with the work on the Planned Action Ordinance. Because the update process took place
in the midst of the COVID-19 pandemic,all meetings and engagement activities took place remotely
using a variety of online platforms.
Specific events and activities included:
• May 19,2020—Kick-Off Meeting:The project team held a kickoff meeting to initiate the
Planned Action EIS and UGA Plan update.The consultant team,which included staff from BERK
Consulting, Makers, and Transpo Group, met Mason County staff, and reviewed the project
scope and schedule.The group discussed public engagement strategies in the context of the
ongoing COVID-19 pandemic, and timing for the scoping and visioning phase of the project.The
group also identified goals,timing, and data needs for the existing conditions report,to be
shared as part of the public outreach and visioning process.
• September 8,2020—Staff Workshop:The team refined objectives of the EIS and plan update,
reviewed objectives from the original UGA plan adopted in 2004 and discussed current
conditions. BERK staff provided an overview of current zoning, potential property development
in the area, and changes to the UGA under consideration.Transpo Group staff briefed the group
on the planned SR-3 bypass and its effects in the UGA, and Herrera staff summarized
hydrography and environmental conditions.
• November/December,2020 —Online Open House: BERK staff produced an online open house
as an education and engagement tool.Similar to an in-person open house,the online open
house included information about the project, maps, and interactive features. Participants were
able to add comments to maps showing potential UGA and zoning revisions.An online survey
BELFAIR UGA PLAN 9
FINAL—February 25, 2022
was also hosted at the same page,soliciting participant priorities for the future of the area and
feedback about zoning and UGA boundary proposals.
-T
��I•. I— �nru.hW 6arWYruN Yrro 4.aam.�brw.f._
— r
Zoning and Development
Regulation Review Areas j
Reviev.zom ng for passible '- I
short-term agriculture, I
12. Rezone Nort',M—n - -
v Regional Fire prcperty tc
Fubl'c Institution.
�.
�3,1 Rezone Feshecl Retnii rc
PAixcd Usc.
y
4 Review residenCal
transitions. � I
J
�S 1 Rev'e.Ic nd we and zo ung
mix along proposed Bypass
route and Romance HillF-
-.1110 foc u-
6;Rezone Wastewater
Figure 4. Online Open House interactive map of proposed zoning changes
BELFAIR UGA PLAN 10
FINAL—February 25, 2022
® .i
-- --
roi«, - o X
®rroa rwaic r
I.Mi�rMtwW MMVie9MInMMMaI.! O Puitm®w,mmafp:rfi ton
It�,,, IMs:rndN!M tx+,ea R.
®pJntt Ntae
}ivYrn Mti.yV•t.,1i5li Pl'A 3
asn,..x. ^,sic ®ri.anfi
Townhouses with open space 0
Figure 5. Online Community Workshop visual preference survey
• April 19, 2021—Planning Advisory Commission Meeting/Community Meeting.As part of the
regularly scheduled Planning Advisory Commission meeting,the County held a community
meeting under RCW 43.21c.440(3)(b)to share an early Planned Action Ordinance framework
and Subarea Plan adjustments.
• April-May 2021 Draft EIS Comment Period—With the issuance of a Draft EIS,the County held a
30-day comment period to solicit tribal, agency, and public comments.The Final EIS was
published in February 2022, and provides responses to comments.
• Subarea Plan and Planned Action Ordinance adoption following public meetings and hearings.
In spring and summer 2021, public meetings and hearings were held with the Planning Advisory
Commission and Board of County Commissioners.
BELFAIR UGA PLAN 11
FINAL—February 25, 2022
Exi' sting
Land Uses
Within the UGA, Belfair's commercial area is a three mile stretch along SR-3. From outsider's
perspectives, physically,this corridor can be divided into 3 nodes or areas.The most prominent
commercial node is what is often referred to as Belfair's downtown, centered around the Old Belfair
Highway and Clifton Lane intersections.The downtown is anchored by two grocery stores and contains
local and franchise restaurants,gas stations,car dealers, convenience and personal service uses,etc.
The second node is an area at the south end of the UGA around the community center, school, and
library.Together,these core uses function as Belfair's civic center and are in good physical condition.
Most of the surrounding areas, on the other hand, are underutilized and potentially redevelopable.The
Multi-Use Corridor between these two nodes is the third commercial area. It includes a mix of small-
scale retail,service, offices,churches, residential uses and the Salmon Center, a regional environmental
learning center and tourist draw.
While most sites within the downtown area and SR-3 corridor to the south feature some form of
development,there are numerous opportunities for commercial infill development and redevelopment.
Construction of the sewer system in the early 2010's greatly increased commercial and residential
development opportunities in Belfair; planned SR-3 bypass will further strengthen development
potential when built.The SR-3 corridor east of the railroad on the plateau provides substantial future
commercial development opportunities.
Belfair currently contains about 450 residential units within the UGA. Single family homes make up the
vast majority of the units.These uses are scattered mostly along the SR-3 corridor west of the railroad
and in the vicinity of Old Belfair Highway in the northwest portion of the UGA.
The UGA has seen significant residential growth since the original UGA plan was adopted,with overall
units up about 50%since 2003,though still below earlier projections. Prior to the Growth Management
Act residential growth in the rural areas outside of the UGA was substantial. Due in part to the size of
the UGA,there are many areas that provide future opportunities for new housing. First and foremost is
the area surrounding the downtown commercial core—where sites can accommodate a variety of
housing within walking distance of services and amenities. Other housing opportunities are the lower
flanks of the hillsides east
BELFAIR UGA PLAN 12
FINAL—February 25, 2022
Belfair UGA
Other UGAs
r—-i
L— Counties
Areas
Public lands ! Plateau }
111 Area
Railroad j 1
! Industrial +1
State Route ! Resource j
1 Uses }
t �
77-
�RAO
}
Downtown ? }
! ! ao
The Salmon ! i�
Center i
Ea1-
! Q, 0
_a
}
l�ir,� }
,4 I
1 }
}
fta 00 }
Southern }
}
Node }
t }
10 o Belfair UGA Plan
Figure 1. Important Areas in Belfair UGA
BELFAIR UGA PLAN a 3
FINAL—February 25, 2022
of SR-3—which contain substantial view opportunities towards the Olympic Mountains and Hood Canal.
Both of these areas contain environmental constraints, however, including some wetlands,waterways,
and steep slopes.While these factors may limit some development,they can provide opportunities to
enhance the quality of housing and environment if designed well.
The most substantial housing opportunities in the UGA may be on the plateau—between SR-3 and the
future SR-3 bypass route, where the land is relatively flat and there are few environmental constraints.
Here there is a great opportunity to create cohesive new residential neighborhoods. Connections to the
rest of the community will be important.
Also,on the plateau in the north of the subarea are the UGA's current industrial sites.These are likely to
continue in this use due to the highway and rail access and limited environmental and land use
constraints.
Circulation
There are only two main north-south roads in -
Belfair; SR-3 and NE Old Belfair Hwy. SR-3 is the
primary access to town which also functions as a
state highway connecting to Shelton to the south MASON
and Bremerton to the north. Because there is no
parallel route through the whole UGA,accidents on 3 -
SR-3 can cause extensive delays. Based on the $
Plan's transportation analysis, most of the
accidents happening along the corridor are at 300J j KITSAP
driveway intersections.There are approximately
100 driveways on SR-3 between Cokelet Lane and
io¢.
SR-106 alone. NE Old Belfair Highway,the other
north-south access road extends from SR-3 i
northward, serves mostly local uses.The SR-
300/Clifton Lane corridor is one of the few east- _
west corridors in the UGA. SR-300 links rural areas aoz,
to the west with Old Belfair Highway, and Clifton \3, PIERS E
Lane links both with SR-3 in the downtown core.
i
The recently completed Romance Hill Road,close
to a half mile south of the downtown area is the Future proposed alignment }
only public roadway connecting with SR-3 south of
Figure 2. SR-3 bypass proposed alignment.
downtown.All other streets south of downtown
Source: WSDOT
are private dead-end roads.
BELFAIR UGA PLAN 14
FINAL—February 25, 2022
With the lack of street grid system, local access relies solely on SR-3 and NE Old Belfair Highway.There is
no other alternative route.A planned alternative north/south route on the plateau, however,would
provide a second route through the Belfair area.The planned route extends from SR-3 near the UGA's
eastern boundary and travels southwesterly on the plateau to connect back with SR-3 south of the UGA.
Within the UGA a connection to the bypass via Romance Hill Road is planned. Considering growth
projections for the UGA and current traffic conditions, major transportation improvement in Belfair will
be needed over time.This includes improvements to SR-3,the planned alternative north/south route as
well as other local access roads.
Natural Environment
Belfair has tremendous amount of natural habitat
within the UGA.The Theler Wetland at the far west
end of the UGA is a 135-acre natural jewel for Belfair. It
provides trails along Hood Canal, Union River Wildlife
area and the Salmon Center west of SR-3. ,
v '
Wetlands:To the north there are extensive and
sensitive stream and wetland systems. Low lying areas _! ;,. V ,%
along the Union River in the northwest corner of the
I '
UGA have been designated by the County as a Class II
Critical Aquifer Recharge Area (see 3.2 Water
Resources in the EIS).
Hillsides:Steep slopes parallel much of the east side of
the SR-3 corridor from the downtown area southward r.
—providing substantial view opportunities towards the
water and mountains.A relatively flat plateau lies to
the east of the ridge. p
Forests: Much of the UGA is well-forested.These areas stream&wetland systems
are colored dark green in Figure 3. - Forest
secondary forest
The uncolored areas in Figure 3 are developed sites, Logged areas&meadows
while the medium shade of green includes other steep slopes
wooded areas(secondary growth).The light brown Developed areas
areas illustrate recently logged areas or dry meadows. Figure 3. Belfair Natural Areas
BELFAIR UGA PLAN 15
FINAL—February 25, 2022
t ,
Figure 4. View of the Theler Wetland area Figure S. The Theler Wetland Trail
from the ridge above SR-3.
The community members proudly consider these wetlands, waterways, hillsides and forest land areas as
the treasure for their community that need to be protected for next generation to enjoy. Considering
population projections, however, participants recognize that structured open space with ballfields and
active recreational uses are sorely needed within the UGA.
Pedestrian Network and Trails
The pedestrian network in Belfair is limited.There are few sidewalks in general and thus it's difficult to
walk safely and comfortably within the community. Although Theler Wetland trail system is a wonderful
exception, it does not connect to other natural habitat and neighborhood areas.There is a strong
support from community members to expand the trail system throughout the community in different
loops that connects different land uses together.This trail system can be used as another alternative
route for pedestrians and bikers to get around in town.
BELFAIR UGA PLAN 16
FINAL—February 25, 2022
Economic Conditions
According to the 2003 economic analysis,the Belfair UGA had experienced very low growth in the
previous decade,while rapid growth occurred in the rural areas around the UGA. New land-use policies
for Mason County, related to GMA,suggest that growth will come to Belfair UGA at a higher rate than
previously experienced. Large amounts of vacant land within the UGA present an opportunity for a
housing developer to exploit economies of scale; developing a substantial pool of housing stock in the
same area helps keep prices down.Among potential opportunities,the absence of multi-family housing
is most notable and reportedly in strong demand.An influx of seniors provides a strong demand in
senior housing. Increased demands for retail space will come with the population growth.Though much
of this demand will likely occur in existing commercial centers that currently attract Belfair shoppers,
new retail in Belfair attracted by this growth would also benefit from changes in spending habits of
existing residents,thereby increasing capture rates for the trade area. In addition, lodging development
opportunities appear to exist, based on strong intra-regional tourism and limited competition from
existing lodging establishments. Industrial uses appear challenged by large amounts of competing
commercial land available nearby.The UGA's large, undeveloped parcels, however, are also an asset for
industrial development and may prove attractive to businesses that do not need the apparent
accessibility advantages offered nearby.
BELFAIR UGA PLAN 17
FINAL—February 2S, 2022
Plan ve ry i ew
Vision
The community's vision for Belfair's future begins with a feeling for the land.This feeling is reflected not
only by an appreciation for the area's scenic natural setting, precious water resources, and diverse
wildlife habitats, but also by the knowledge that the land is an important human resource. Care for the
land is critical to the community's economic health and long-term sustainability. For this reason,the
plan emphasizes measures to protect local streams and wetlands, locates growth where conditions are
most suitable, includes sustainable development standards, and takes greatest advantage of the area's
assets as an attraction to visitors and an amenity for residents and workers.
Economic vitality is a second critical community goal. For Belfair to grow and prosper, local jobs must
accompany residential growth, and the economy must diversify to include industrial, professional and
service, and tourist-based businesses.To this end,the plan includes three separate concentrations of
commercial activity, each appealing to a different economic sector. Additionally, recommendations for
development standards, design guidelines, and public works focus on supporting new development that
is compatible with Belfair's unique assets and economic potentials.A two-phased approach to highway
improvements will assist the downtown core in the short term and allow larger, diverse growth in the
plateau over time,as well as address critical near-and long-term transportation challenges.
Finally, participants in this planning process have expressed a desire for a more cohesive community
with a more integrated, positive identity.This means enhancing the area's visual quality. It means
ensuring that new buildings are friendly in their design and planning new residential development to
create neighborhoods, not just housing. It means providing the pedestrian and bicycle routes so that
people can use local businesses and enjoy the community amenities without having to get in their cars.
It also means protecting green belts of trees so that the area retains its"community in a forest"
character.These are the issues toward which many of the design and park and open space
recommendations are directed.
The community's vision is not a passive one. It cannot be attained without a lot of hard work and
cooperative effort. But the raw materials are there to make this vision a reality.The area will grow over
time, and this growth can be shaped so that the whole community will benefit.The sewer line and
improvements to SR-3 will give the central part of the community opportunities it has not had in the
past,and the Salmon Center, library, and clinic will help to activate the south part of the UGA.The
challenge is to make the most of this opportunity in time.And in the long term,the community's
potential is even more dramatic. Positive,cooperative master planning of the lands on the plateau early
can reap big rewards for the participants.
BELFAIR UGA PLAN 18
FINAL—February 25, 2022
4,
��, w •�
'"-i
fr }North
_ 1
( Neighborhood
Low density residental / Commercal or office
n areas less sulable fat c +4 —
development
- t r Zi .r ti % . � Large'ootonmretad
Protected green corridor �` ' _ i / - t �'
along highway \ -� Neigtborhooe
Protected streamoorridere -- �1 F School
(throughout) r Reg+one perk
'•` �,� � d , ` L•� ,/� r' New residential
community
IJ t1►..�c`. y�' i Wth a mac or
hous rated vntmggPes
t in"
7 open soar
va wsa / system
5.. � Ali{It `•Y
've ` .� 'Clean industrialt
� _ �• 1 � 4,.'be� 1 commercial park
�Wwnt
Node = ,` t/_ 4 "
Infill mired-use
with intleQfiOed peOCetflefl
jr t
nelWOflt
, U a
Trails from Salmon
Center to cc
mmunrty
nple ferrtiy
� resrdedthld :a-a e Imni y �±
Surface water treater
belore entering
UnionRrrerand .. "� —
Hood Canal w�
water: f'. . • F -� I ;Y -- _ _._._._t
Nodth•wullh by1nes with landscaping
Bypass Node
Alf
�E U
s —emu 4 Corridor Small scale retail
y:.
1 '\ 7 Mixed-Use and sen cies
s , r.
i'•-Improve SR-3 corridor with 3 tares,
aai tl pedestrian walkway.tandscaping.
safety Improvements,and utiilines
r �' '"`—Mixed-use deve'opmentalong
— - -- .• -` SR-3 corndor dea'gned to
as resent att active r
p ant to the
SOtrth@Prl - f ° street and minimize impacts to traffic
Node Pate=fiat for a Hotel+resort
7 Small scale 1
retail and - �'��` --Sin tla tar"dt 1
servciesrC SldC nlia''
J i Belfair 20 Year
Vision Plan
Figure 6. Belfair 20-year vision
The illustrations on the following pages depict some of these opportunities.They show what Belfair's
future could be like.The development of the individual properties is not likely to be like what is shown.
This is a conceptual plan that will change over time, but the overall qualities and general patterns of
development are a distinct possibility if the plan's recommendations are implemented.
BELFAIR UGA PLAN 19
FINAL—February 25, 2022
A Look at The Future
Southern Node
So,what will a visitor to Belfair see if he or she returns to the area in about 15 or 20 years?Our fictional
visitor might well start at the south end near where the new Salmon Center is located. Here is truly a
regional attraction, explaining the ecology of the area and providing children of all ages many
opportunities to engage in the learning about the land that supports them.She heads south to a small
cluster of shops and services and an inn where she can spend the night. Heading north again, our visitor
has the option of following the scenic trail along the marsh or the walkway along SR-3. She chooses the
walkway so that she can enjoy the street's boulevard-like character and new array of mixed-use
buildings.She notices that traffic is steady but not congested,thanks to the new bypass and the fact that
many of the local property owners have made a special effort to consolidate their driveways and
landscape their street fronts. It makes a huge difference from what she remembers at the turn of the
century. Even with the new buildings, she can see views of the inlet to the west.
BELFAIR UGA PLAN 20
FINAL-February 25, 2022
Loop trail to community
and residential neighborhoods C
III
Small scale services ■■■'■.'■•.
•�` HABITAT 4
Infill and new mixed use FO
development along HU T
SR-3 corridor with pedestrian
friendly elements
Streetscape
improvements i
Driveway consolidation
for safety and traffic flow
improvement -. �+r- ---i—•- _
9
Mixed use development
with multi-family residential
' behind
i
Illustration of Southern Node
Planning Objectives 0
North
Figure 7. Southern node planning objectives.
BELFAIR UGA PLAN 21
FINAL—February 25, 2022
Downtown Area
Entering the downtown, our visitor is surprised to see a number of multi-story residences surrounding a
small but lively shopping area.The new residential neighborhood that has grown up around the old core
provides a lot of people and activity.Some of the old landmarks are still there, in many cases spruced up
to fit with the newer development. She notices that it is easy to walk around the downtown, small
pathways providing easy access to inviting shops, cafes, professional services, and studios.The little
plaza in the center with the outdoor seating is just the place to meet a friend for a cup of coffee. Right
across the highway,the Saturday flea market is really hopping.There seem to be people from all
overlooking for treasures. Maybe she should stop and look for that old Johnny Cash record she needs for
her collection. But she decides that, if she wants to visit the whole community,she'd better see what's
happened on the plateau.
BELFAIR UGA PLAN 22
FINAL—February 25, 2022
fMixed use development to the Multi-family Residential
north on old Be Highway
��— Pedestrian o t mixed use
(typical southth of f the
access road)
Park Centralized plaza space
Access street to organize
area and improve circulation
"Keystone"buildings that
— / create a distinct character
at intersections
Streetscape Improvements
Coordinated parking lots for
greater efficiency
Stream protection measures
Intersection improvements
with crosswalk
Park and community market
1
Illustration of Downtown
Planning Objectives
Figure& Downtown Area planning objectives.
BELFAIR UGA PLAN 23
FINAL—February 25, 2022
Northern Plateau
It's a bit of a walk up from the downtown, but the footpath is pleasant.She notices that even with the
new development,there is a lot of green left.The creeks seem as free flowing as ever,with a lot of
native vegetation around them to help them stay healthy and protect the water quality. Our wandering
visitor also notices that the new residential development really seems to fit in with the surroundings.
The smaller streets, swales, rural footpaths, landscaping with native vegetation,and sensitive site
planning really make a difference. Here is proof that sustainable development makes sense, not only for
the environment, but for the lifestyles as well.
Industrial close to railroad line
Commercial or office with buffer
from highway
Large scale retail
L I = r Buffer to protect
green corridor along highway
, \ Neighborhood"main street"
I - = with small retail uses and
pedestrian amenities
i
Regional park
Manufacturing and clean
industrial uses at business park
I l W,fit
Wetland protection measures
1
� t-^; � � � ,.:G,� �''''�• Access streets to new residential
} �� ' � ; =a •. ' development
>. \
New multi-family residential
development integrated with
open space and trail systems
Northern Plateau
- �..r North
Figure 9. Northern Plateau planning objectives
BELFAIR UGA PLAN 24
FINAL—February 25, 2022
Finally, she reaches the crest of the ridge, and here she sees the biggest changes.There is a new,
attractive shopping center integrated with a business park, several ball fields and a new neighborhood
with a wide mix of housing types. It may not have the intimate charm of the downtown, but someone
has really done a good job of planning and designing the area.Jobs, services,amenities, and residences
are all here.The wetlands provide an interesting backdrop, and all the major features seem connected
with ribbons of open space.And, located near the intersection of old SR-3 and the new route, it is
convenient for all. Looking across the highway,she can see new retail development and perhaps just a
glimpse or two of the light industrial activities lined up along the rail siding.
Heading back toward her room at the Salmon Center Inn, she wishes that she had brought her bike with
her. It would be an easy roll along either the SR-3 trail or the Romance Hill connection. But the walk
gives her time to consider what she's seen.What strikes her is that,for a rural community, Belfair is
really a place of contrasts; old and new, a small town setting with some sophisticated aspects, and a
place where the old hamburger joint and the new coffee shop can coexist. Most importantly, she
ponders about how the three centers complement one another, each adding to the community as a
whole. It provides more choices, a richer mix of experiences and, literally,something for everyone.
Maybe,she thinks, she'll stay another day or two, maybe kayak the canal, maybe look for that old
Johnny Cash record, perhaps explore the job market a bit, and—what the heck—it can't hurt to do a bit
of house hunting.Just for fun...
Strategic Concept
The planning concept translates the community's vision described on the previous pages into a set of
key ideas that, in turn,form the basis for the individual planning recommendations. In Belfair,the
community's vision means that public and private partners work together to develop a linear sequence
of nodes—each with its own function and character—linked with an extensive trail system. Belfair's
downtown area will be the most important of these nodes and the focal point for civic and cultural
activities.
Actions to encourage the Salmon Center development will attract visitors from all over the region,
helping to fuel the local economy.And,the northern node will provide room to grow over the decades.
Establishing zoning and guidelines that will direct new development to create a high-quality
development with a mix of uses is critical. Improvements to SR-3 and guidelines to direct growth along
the highway form another set of actions that are necessary to ensure good circulation and that the three
nodes work together as a unified whole.The third major direction framing a number of planning
recommendations and design standards is the community's desire for a high-quality, sustainable
environment.
BELFAIR UGA PLAN 25
FINAL—February 25, 2022
Plan Concept
s�
1. Focus more diverse,
intense development in
four areas: tt
• North end to accommodate
larger footprint commercial ,, ,� t
• Downtown to provide mix of
pedestrian/local commuting/
mixed-use development .
• New node with services at
SR-3 bypass and Romance Hill -
connector
• Southern SR-3 corridor with
mix of businesses and services
• Southern nodes with + '
educational and recreational
activities
. 2. Upgrade SR-3
corridor
�• _" AW* • Complete 3 lane configuration
• Install sewer utilities and
If safety improvements
'., i` • Plan and build alternate route
+
f
f 3. Ensure quality living and
natural environment
f • Water quality programs
• New development fits with small-town
and natural character
• Connect and support neighborhoods
F with trails,parks and public services
___: +ter' «� ,�. •t
Belfair UGA Plan
Figure 10. Plon concept
BELFAIR UGA PLAN 26
FINAL—February 25, 2022
Recommendations
Land Use and CommunityDesign
Zoning regulations and design standards will be a critical tool in implementing the community's design
objectives. Six different land use designations are proposed and sited to concentrate development in the
commercial nodes, allow for residential development to accommodate projected growth,and protect
sensitive natural areas.These designations include:
• Mixed-Use—intended to provide for a wide variety of uses along much of the SR-3 corridor and
other areas.
• General Commercial—intended to provide for the full range of commercial uses to serve Belfair
and the surrounding region.
• Business-Industrial—intended to provide for employment growth in the Belfair area by
encouraging manufacturing,wholesale trade, and office uses.
• Residential—intended to provide opportunities for residential development within the Urban
Growth Area. Includes subdesignations of R-4, R-5, and R-10(numbers referring to the average
number of units allowed per acre. Regulations provide flexibility by encouraging clustering of
development on the sites that can best support development.
• Master Planned Mixed Use-intended to provide for large-scale master planned developments
with a mix of employment and residential uses in the north part of the area.
The chart on the following page identifies the difference between the zones,while the map on page 28
identifies the locations of each designation.
BELFAIR UGA PLAN 27
FINAL—February 25, 2022
Table 1. Comparison of Zoning Designations
Proposed
Use and Key General Mixed-Use Business Residential Master
Provisions Commercial (MU) Industrial (R-4,R-5,R- Planned
(GC) (BI) 10) Mixed Use
ALLOWED USES
Pedestrian Retail
General • • •
Commercial
Office
Residential
Industrial/
Manufacturing/ O
Wholesale
DENSITY PROVISIONS AND KEY DESIGN STANDARDS*
Height limit 3 stories 3-5 stories 3 stories 3-4 stories 5 stories
Residential 10 for R-10
No specified No specified
density Not permitted Not permitted 5 for R-5
(units/acre) limit 4 for R-4 limit
Front yard
landscaping 0-30' 0-30' 30-60' 10-30' 0-30'
area*
• = Permitted use;
O = Permitted only in the GC-BI Overlay Area
No Symbol = Use not permitted
See Mason County Municipal Code Chapters 17.20-17.35 for details
BELFAIR UGA PLAN 28
FINAL—February 25, 2022
Description of Uses
• Pedestrian Retail—Small scale retail trade uses(excluding auto-oriented uses), eating and
drinking places, hotels and motels, personal service uses.
• General Commercial—The full range of commercial uses including retail trade and shops, eating
and drinking places, hotels and motels, auto-oriented uses,finance, insurance, and real estate
uses, and service uses.
• Office—Professional office.
• Residential—Multi-family and/or single-family residential uses.
• Industrial/Manufacturing/Wholesale—Manufacturing,assembling,warehousing, repairing,
fabricating,and processing.
BELFAIR UGA PLAN 29
FINAL—February 25, 2022
o:
VV
gR ERTG=-
m Mg _
S ,NE MIGHT <s+�r -'A
Q'
+rr--J
�f p
Q'
N�
z �
la
00 fl/
ram. ^
f� 1
/ ?7 1
,i1 1
0 0 1
1
�f 1
1
1
1
Map Date:February 2022
—� Miles
Belfair UGA Boundary Belfai,UGA Zoning Mixed Use
UGA, Business Industrial Mosier Planned Mixed Use
Parcels General Commercial Multi Family Residential
L Approximote Byp—&Connector Route General Commercial and Business Industrial Public Facility
Long Term Agricultural Single Family Residential
Medium Density Residential
Figure 11. Proposed land use designations
BELFAIR UGA PLAN 30
FINAL—February 25, 2022
LU-1 : Amend UGA Boundary
Adopt recommend changes to the Belfair Urban Growth Area (UGA) boundary.The proposed changes
add one area with an essential public facility to the UGA and remove a parcel of publicly held forest land
that is unlikely to be developed.These changes are consistent with the goals of the Growth
Management Act and the vision of this UGA plan.
A. Expand the UGA boundary by approximately 54.5 acres to include the Belfair
Wastewater and Water Reclamation Facility, plus adjacent County-owned properties.
B. Reduce the UGA by approximately 40.6 acres in the southeastern corner of the UGA to
remove a property owned by Washington State Department of Natural Resources (DNR)
that is unlikely to be developed and which is not readily accessible from the rest of the
UGA.
t
FaD
NE.MCKN GH TaOt
.L
A
Belfair UGA Boundary
/J Parcels
Approximate Bypass & Connector Route
— UGA Boundary Revisions
0 Add to UGA
Remove from UGA
7 // T.."
Figure 12. Proposed UGA boundary revisions
BELFAIR UGA PLAN 31
FINAL—February 25, 2022
LU-2: Mixed-Use (MU) Designation
Purpose
The primary purpose of the Mixed-Use designation is to
provide for a mix of uses along the SR-3 corridor, in HE MGCKGi1T�'
J _
downtown Belfair, and at the future crossroads of Romance - ,
Hill Road and the planned SR-3 bypass. Permitted uses o -
include commercial, office, and residential uses. By
allowing a broad array of uses, property owners have more Z.
choice in how the land can be developed. Design standards Z
require pedestrian-friendly design in downtown Belfair
with either landscaping,small open spaces,or pedestrian-
oriented building facades. Design standards also encourage
pedestrian and vehicular connectivity between properties.
o u
Building heights up to three or five stories are permitted
depending on the area—otherwise, no specific density
limits are provided as the will be limited b rr
p ( y y parking rr
requirements, natural site constraints, and marketSa
constraints).
H/
Locations Figure 13. MU Land Use
Designation
Along the SR-3 corridor south of downtown, surrounding
the GC designation in downtown, and at the Romance Hill Road and planned SR-3 bypass crossroads.
Permitted Uses
A mix of public, professional office, light industrial, retail,service, and multi-family residential uses.
BELFAIR UGA PLAN 32
FINAL—February 25, 2022
Height Limits and Density
Three to five story height limit depending upon location. Five-story buildings may be allowed along the
east side of the SR-3 corridor where views can be maximized and impacts minimized. Buildings on the
west side of SR-3 must not reach an elevation of more than 35 feet above grade level within 150 feet of
the roadway,although taller heights could be considered with a Special Use Permit. Overall residential
densities are limited by height limits, parking,site constraints,and design standards.
Design Standards
Design standards promote good site planning, pedestrian and vehicular access, extensive landscaping,
and human-scale building design. It will be important to minimize or reduce the number of vehicular
access points off SR-3.
s
Figure 14. Development examples consistent with the vision for the Mixed-Use zone.
BELFAIR UGA PLAN 33
FINAL—February 25, 2022
LU-3: Create the Master Planned Mixed-Use
(MP-MU) Designation
Purpose
The purpose of this district is to provide for large-scale
master planned developments.This district allows a mix of m r 2`
commercial and residential uses with a focus on dE NEWKIRK Rp K4TCHFMAK��4 1
business/industrial park development and multifamily
housing. By allowing a broad array of uses, property
owners have more choice in how the land can be
developed. Design standards encourage landscaping, { //
particularly along the SR-3 corridor to retain the wooded
character of the area and between non-compatible uses to '
minimize negative impacts of parking, service,and/or
industrial areas on multifamily uses in the zone. Design t'
standards also promote safe vehicular and pedestrian
connectivity, development of pedestrian-oriented spaces,
and appropriately scaled building design.
Locations
Between SR-3 and the bypass in the northern-east part of Figure 15. MU Land Use
the UGA. Designation
Permitted Uses
A mix of professional office, light manufacturing, retail,service,and multi-family residential uses.
Height Limits and Density
Height and bulk standards in the MU zone apply, meaning building heights of five stories are allowed..
Residential densities are limited by height limits, parking, site constraints, and design standards.
Design Standards
Area-wide standards for site design, building design, and landscaping promote good site planning,
pedestrian and vehicular access, extensive landscaping, and human-scale building design. Requirements
for master planned developments reinforce design standards for landscaping, pedestrian and vehicle
circulation,and open space New vehicular access points off SR-3 should be minimized.
BELFAIR UGA PLAN 34
FINAL—February 25, 2022
Rill&iii ,a-,.r•a
r
K
J
Figure 16. Development examples consistent with the vision for the Master Planned Mixed-Use zone.
BELFAIR UGA PLAN 35
FINAL—February 25, 2022
LU-4: General Commercial (GC) Designation
Purpose ) Q
The primary purpose of the GC designation is to provide Z z &ui
areas that offer a wide range of consumer goods and NE NEWKIRK Rp i,Ch
services for both Belfair UGA residents, regional residents,
and the traveling public.An additional purpose is to /
provide a Business-Industrial Overlay(GC-BI)Area that �f
allows both commercial uses and services and industrial o
JE MCKNIGHTI 1
related uses on those properties close to the railroad
00
/
and/or already engaged in industrial-related uses(see LU-5 /i
Business Industrial Designation on page 38). Design
standards encourage landscaping, particularly along the SR-
3 corridor to retain the wooded character of the area and
minimize negative impacts of parking, service, and/or
industrial areas. Design standards also promote safe �� A
vehicular and pedestrian connectivity, development of A-
pedestrian-oriented spaces, and appropriately scaled Figure 17. GC and GC-81 Land Use
building design. Designations
Locations
Existing commercial areas at the northeast end of downtown along SR-3 and GC-BI overlay properties
on the plateau along the SR-3 corridor.
Permitted Uses
Allows for the full range of commercial uses, including retail trade and shops;finance, insurance, and
real estate uses; and professional office and service uses. Industrial/manufacturing/wholesale uses are
permitted in the General Commercial—Business-Industrial (GC-BI) Overlay(see Figure 17)as long as
they comply with the applicable buffer requirements for the BI classification. Residential uses are not
permitted.
BELFAIR UGA PLAN 36
FINAL—February 25, 2022
Height Limits and Density
Three-story height limit.
Design Standards
The most important design goals are to enhance pedestrian and vehicular safety—particularly along SR
3.This means consolidating existing driveways, where possible, and minimizing new access points for
new development and adding sidewalks and landscaping features along SR-3.Smaller scale signage
should be a key design component of these areas to reduce the visual pollution of the SR-3 corridor.
Design standards should encourage pitched roofs and use of natural building materials that can
contribute to Belfair's visual character and identity. Non-pedestrian-oriented facades should be
screened, especially on SR-3 and in pedestrian areas.
!If
Figure 18. Development examples consistent with the vision for the General Commercial zone.
BELFAIR UGA PLAN 37
FINAL—February 25, 2022
LU-5: Business — Industrial Overlay Designation
(BI)
Purpose:
The primary purpose of this district is to provide for the W�
location and grouping of industrial enterprises and
u i
activities involving manufacturing, assembly,fabrication, I >:
processing, bulk handling and storage, research facilities,
warehousing and heavy trucking. It is also a purpose of this NE NEWKiRK Ro
zone to protect the industrial land base for industrial
economic development and employment opportunities.
These purposes are accomplished by: ., )
i I
� E
• Allowing for a wide range of industrial and MCKNIGHTIP L
manufacturing uses.
• Limiting retail uses to those necessary to directly
y �
support industrial activities.
• Prohibiting residential uses.
Substantial landscape buffers are required for those ;
properties adjacent to the SR-3 corridor,otherwise Figure 19. BI and GC-Bi Land Use
Business-Industrial properties are exempted from most site Designations
planning and building design guidelines to maximize
flexibility for the uses.
Locations:
Properties in the northeast corner of the UGA. Provisions for the BI designation are also applicable to
industrial, manufacturing, and wholesale uses in the GC-BI overlay areas along the SR-3 corridor(see LU-
4 on page 36).
BELFAIR UGA PLAN 38
FINAL—February 25, 2022
Permitted Uses:
A combination of manufacturing, institutional,wholesale trade, professional office, and service uses.
Height Limits and Density:
Three-story height limit.
Design Guidelines:
Provide a wide landscaping buffer along SR-3 to screen uses from highway. Driveway and access
guidelines to enhance safety on SR-3.
Industrial use type, outside
storage or service uses Deese planting
9
I ,
30'minimum i
Row
Figure 20. Required landscape screen for Business-Industrial uses along the SR-3 Corridor.
BELFAIR UGA PLAN 39
FINAL—February 25, 2022
LU-6: Multi-Family Residential (R- 10)
Designation
Purpose
The purpose of the R-10 District is to provide sites for rfi
multi-family residential development that are within -
i
walking distance of commercial areas and services within
the Belfair UGA.The designation provides for a density of
ten dwelling units per acre. Clustering of the dwelling units o"~
and properties is encouraged to protect open space and
water quality, reduce infrastructure needs, and enhance u
energy efficiency. $ ,w
Locations
Within or adjacent to development nodes and i
commercially zoned areas within a normal walking distance °
of one-half to three-quarters of a mile. Locations generally Figure 21. R-10 Land Use
are areas not significantly impacted by critical areas and Designation
slopes.
Permitted Uses
Apartments,townhomes, and other multi-family uses—which may be clustered on site(s).These areas
will provide housing opportunities for seniors, singles, childless couples,and low-income families, and
other people who want to be close to services and amenities and prefer not to maintain a yard.
BELFAIR UGA PLAN 40
FINAL—February 25, 2022
Height Limits and Density
Four stories. Maximum density of ten dwelling units per acre, and a minimum density of ten units per
net developable acre. Development may be clustered as long as the average density for a property or
applicable properties does not exceed the 10 units per acre limit.
Design Guidelines
Design guidelines will be important to minimize environmental and visual impacts of developments and
provide amenities for residents. Consider density incentives that encourage the use of sustainable
design principles in site design, access, building design, and landscape. Protection of creeks and
wetlands is critical—these features should be preserved and integrated into the development as an
asset and amenity for residents. Open space and play areas will be important, particularly for young
families. Pedestrian access—between developments and to provide access to parks, open space,
commercial, and civic uses—is also very important.
d.
■
Figure 22. Development examples consistent with the vision for the R-10 zone.
BELFAIR UGA PLAN 41
FINAL—February 25, 2022
LU-7: Medium Density Residential (R-5)
Designation
Purpose
The purpose of the R-5 District is to provide sites for
moderate density residential development within the
Belfair Urban Growth Area.The district allows for a density
M�KfKa 4C
of five dwelling units per acre, except where"critical lands" c'
are present—which reduce the permitted density. z NENF.�,G. ":E„.N ;
Clustering of the dwelling units and properties are
encouraged to protect open space and water quality, ,,rs,R
reduce infrastructure needs,and enhance energy NE CKNC.- a
efficiency. Multi-family dwelling units are permitted as long arR r,
as they do not exceed the density requirement and
minimize impacts to adjacent single-family dwelling units.
Locations -
Generally away from development nodes and �ry'
commercially zoned areas, beyond a normal walking ;#
a
distance of one-half to three-quarters of a mile.
n
n
Permitted Uses n
This generally includes cottages,attached singled family,
and detached single family uses.Where uses are clustered '
to concentrate infrastructure and preserve sensitive
natural areas or open space,the housing could include Figure 23. R-5 Land Use Designation
townhouses or small-scale apartment buildings.
BELFAIR UGA PLAN 42
FINAL—February 25, 2022
Height Limits and Density
Three-story base height limit. Maximum density of five dwelling units per gross acre, and a minimum
density of four units per net developable acre.
Design Guidelines
Design guidelines for single family will focus on site planning and access issues. For example, new
developments should be integrated with open space, local and regional trail systems,and sensitive
natural areas. Use of sustainable design principles is encouraged.
A,
Figure 24. Development examples consistent with the vision for the R-5 zone.
BELFAIR UGA PLAN 43
FINAL—February 25, 2022
LU-8: Single-Family Residential (R-4)
Designation
Purpose
Purpose:The purpose of the R-4 designation is to provide
sites for detached single family residential development
within the Belfair UGA.The designation allows for a density
of four dwelling units per acre. Clustering of the dwellingRK ;c
}
units and properties is encouraged to protect open space !'
and water quality, reduce infrastructure needs, and
"f,
enhance energy efficiency. Multi-family dwelling units are wbfR :oR
NE M.CKN GM?`�
conditionally permitted as long as they do not exceed the -
t.RD
density requirement and minimize impacts to adjacent �P
single-family dwelling units. M
Locations
Restricted to sites containing critical areas and slopes as
development is expected to be clustered into the more y9
qa h
suitable building areas.Away from development nodes and
commercially zoned areas, beyond a normal walking a
distance of one-half to three-quarters of a mile. _ a
n
n
Permitted Uses y
Detached single family uses and duplexes are permitted at �ESOJIR<iF y/
a lower density due to topography or natural site
constraints. Where uses are clustered to concentrate Figure 25. R-4 Land Use
infrastructure and preserve sensitive natural areas or open Designation
space,the housing could include townhouses or small-scale apartment buildings.
BELFAIR UGA PLAN 44
FINAL—February 25, 2022
Height Limits and Density
Thirty-foot base height limit. Maximum density of four dwelling units per gross acre,and a minimum
density of three units per net developable acre
Design Guidelines
Integrate developments with open space,trails, and natural areas. Encourage use of sustainable design
principles.
110
Figure 26. Development examples consistent with the vision for the R-4 zone.
BELFAIR UGA PLAN 45
FINAL—February 25, 2022
LU-9: OTHER LAND USE ACTIONS AND
RECOMMENDATIONS
A. Long Term Agricultural (LTA)
�-x' t .
} �
Designation E"�"""R'
The purpose of the LTA designation is to support a
LU
commercial agriculture and provide open space within the m'
Belfair UGA. Applicable sites are on the east side of Old
O
Belfair Highway north of the downtown area.This E T�MeER z
designation permits single family uses and agriculture- F-DR
related uses.The base residential density is one dwelling NE rnCKN�GHT��
unit per 10 acres. However, density credits of up to three Rp _
dwelling units per acre are permitted provided that the
SQ
increased density is transferred to lands outside the LTA
Q L
designation but within the UGA. o
z O�
� O
B. Restrict Adult Businesses
Restrict the siting of adult businesses in the UGA.The Figure 27. LTA Land Use
community wishes to strongly discourage adult businesses Designation
and minimize their presence in the UGA.The County should
involve the Belfair community in their development guidelines for adult businesses in Mason County.
BELFAIR UGA PLAN 46
FINAL—February 25, 2022
Transportation
Significant progress has been made since 2003 in implementing the transportation recommendations of
the subarea plan.The list below shows the updated transportation recommendations for the subarea.
Location .
T-1 NE Old Belfair Highway/ Two-Way Stop:Two-way left-turn lane along NE Old
NE Newkirk Road Belfair Highway
.....................................................__........._........_...__.._........_........._.._..................._.._.....__.._......_........._.............;...__._....._.._...._...._........__.... ..........._................................................_....................................._...................
_..__..................;
T-2 NE Old Belfair Highway/SR 300/NE Roundabout with northbound,southbound,and
Clifton Road eastbound right-turn lanes, plus a westbound right-
turn slip lane.
.............._.....;.._.........._._... ......... .................... .....---------........................................... _..................
T-3 NE Clifton Road/NE Roy Boad Road Single lane roundabout
------------ *--"..............................._.._.................................-----.....-....-------- ....._.............................................................._....._............
T-4 SR 3/Log Yard Road Roundabout with two(2)southbound through lanes
(tapered to one lane after the intersection)and
westbound and northbound right-turn slip lanes.
......................................_...................................................._..........................................
T-5 SR 3/Ridgepoint Boulevard Single-lane compact roundabout.
I
T-6 SR 3/NE Clifton Road Either install a roundabout or provide signal
i
modifications and a second eastbound left-turn (from
NE Clifton Road to northbound on SR 3).The
additional eastbound left-turn would require
i widening SR 3 to a 4-lane cross section between NE
I Clifton Road and Ridgepoint Boulevard.
....................._..........................................._....__.. ..............................-..............-..........--.................._.._........._.._...._..__................................_........_................................................_................_......._............
....... ._......_. .................
T-7 SR 3/SR 300 Single lane roundabout.
.................................................................................................................-............_....................................................;.................._.._...............................-........._....__......................................_................................................
...............................
.......:
T-8 SR 3/Romance Hill Road Roundabout with separate southbound through and
left-turn lanes.
_..............._____.._____}._._....__-----------.._...._................_..........._............................
_...___...______.._._._.__...._._._......._..............................................................__......_._...._..-.................__._.. .............................____.._......._.....
T-9 SR 3/SR 302 Roundabout with separate southbound through and
left-turn lanes.
_.............................................................._.._...._.................._........._.._.._......__..._._......................................................................................._.._...................................................._.................................................._...........................,
T-10 SR 3 Freight Corridor/Log Yard Road Single lane roundabout.
T-11 SR 3 Freight Corridor/Romance Hill Single lane roundabout.
j Road
.._.._.........._.._...........__j'---.............___..__....................._............................_......_...._...._.............__................"..__..-"'.._____"_..____.._....._.....__...._.._......__...._........_.................................--............................................_........._...........................
BELFAIR UGA PLAN 47
FINAL—February 25, 2022
Parks, Trails, Open Space, and
Public Facilities
P-1 : Expand stream corridor, wetlands, and critical areas
protection
The preliminary zoning recommendations call for lower densities in most of these areas. Maintain and
enforce the current critical areas ordinance. Proposed regulations and design guidelines also encourage
clustering of development to protect these resources.See Water Quality Recommendations below for
additional measures to protect water quality and stream integrity.
P-2: Create a centralized plaza space within the retail zone
downtown
The plaza would the focal point of social, cultural, and civic activities in Belfair.The plaza should be
design and sized large enough to hold the local farmers market.The plaza should be relatively informal
in its design and feature space for outdoor dining and socializing, pedestrian amenities, and landscaping
features. Proposed design guidelines address attractive pedestrian connections within the core.
P-3: Develop a park near downtown
One possible location for the park is on the east side of SR-3 near the Old Belfair Highway intersection.
This site could be assembled from underused County property and donated land. It would be a good
location for a farmers market and other civic activities benefiting from highway exposure and a central
location. Incorporate a farmers market at the site.The park should be clearly visible from the street and
contain sufficient parking. Improved crosswalks should be installed to connect this site to the downtown
core.See Recommendation T-7.
P-4: Develop parks in conjunction with new residential
development on the plateau
New residential development should include smaller neighborhood parks.The area also provides the
best opportunity for a larger park towards the northern end of the plateau to serve the north Mason
County region.The larger park should include active uses, such as ballfields,that draw from the greater
Belfair area.
BELFAIR UGA PLAN 48
FINAL—February 25, 2022
P-5: Expand the system of trails associated with the Theler
wetlands
The existing trail system should be extended and a new trail added along the eastern fringe of the
wetlands area paralleling SR-3 and connecting the Salmon Center with future corridor developments,
the downtown area,and the proposed downtown park. (See P-4.)
P-6: Install a trail/bikeway system along Sr-3
Provisions for pedestrian and bicycle travel are important for both local and regional circulation. Part of
the SR-3 widening to three lanes in the south should include, at a minimum, sidewalks and widened
shoulders for bicycles. Pedestrian/bicycle trails should be added to SR-3 sections that already feature
three lanes wherever there is sufficient right-of-way.
P-7: Develop a system of connected trails on the plateau
A combination of multi-purpose trails and walking trails connecting residential areas with parks, open
spaces, commercial uses, and other neighboring residential areas should be constructed.The network
should include a north/south trail paralleling the bypass route.Trail connections to the plateau retail
center and the SR-3 corridor are also very important. Implementation could be a partnership between
the developer(s),the County, and the State (associated with bypass construction).Trails should be
carefully designed to avoid erosion steep slopes.
P-8: Create a trail and sidewalk system that loops within and
around the downtown area
This would be a walking trail that would connect future residential areas on the fringe of downtown with
the wetlands, proposed downtown park and plaza spaces, and natural areas.
BELFAIR UGA PLAN 49
FINAL—February 25, 2022
Stream corridors and - - - '
wetland areas Add improved Create walkways and
access at bridge ,bicycles facilities along /
Other environmentally in the long term the SR-3 corridor
sensitive areas Expand stream b
`.
Proposed plaza corridor and
wetlands
t ote
• cion Proposed park protection
Proposed regional trail
Expansion of Theler
Wetland trail system
m Proposed walking trail
Pedestrian friendly
streetscapes - Regional Park
Pedestrian Plaza
" 7�I Develop a park near p' Develop a system of�
downtown ry �/ connected trails on
the plateau
Expand the Theler
Wetlands trail system
300,) ♦� // I
♦ // Neighborhood
Parks
lI �
Protect Hillsides
-
Figure 28. Parks, trails, and open space recommendations map
BELFAIR UGA PLAN 50
FINAL—February 25, 2022
Water Quality Recommendations
lA��. Onstall sa over trunk lino within the nowt F ve:ir�.
This is aR essential first step in upgFading water quality while accemmedatiRg gFOWth.The CGHRty is
RECOMMENDATION COMPLETE
W-2: undertake a program of local water quality facilities
to reduce pollutants in local streams and in the canal and
detention and infiltration facilities (where feasible) to improve
flow rates in streams.
Prior to 20th century settlement,the low-lying wetland areas along Union River and Hood Canal
retained and filtered storm water runoff before it entered the bay. Now, not only do human activities
add considerable pollutants,the development has reduced the land's ability to naturally clean the
water. It is especially important to prevent run-off from new roads and pavements from flowing directly
into natural streams without prior treatment. One way to lessen this problem is to, over time, install a
series of treatment facilities that filter out the pollutants through a system of ponds and swales. An
example of this type of facility is planned to handle the water from the new clinic development near
Romance Hill Road.This system could be studied as a prototype for other applications.
W-3: Continue current collaborative, inter-agency efforts to
monitor and upgrade water quality and quantity.
W-4: Encourage an education and volunteer program encouraging
local residents and property owners to adopt "best practices"
regarding stream and wetland maintenance and low impact
development.
The Salmon Center and local schools may provide excellent opportunities to initiate educational
programs.
BELFAIR UGA PLAN 51
FINAL—February 25, 2022
Implementation
Strategy
Participants in the Belfair Sub-Area Plan envision their community evolving from a "pass through" center
on the 511-3 corridor to a cohesive, multi-dimensional community with a strong, intimately scaled
downtown, attractive residential neighborhoods, an upgraded highway corridor with a second north-
south link,a new Salmon Center that along with the area's environmental setting serves as a regional
draw, and a new mixed-use development on the plateau.This is an ambitious vision. It will require years
of sustained efforts on the part of all community interests including business and landowners, residents,
environmental advocates,and Mason County and Washington State agencies.
Unincorporated communities implementing improvement plans generally face additional challenges
because they do not have a self-contained local government specifically addressing their concerns.
County governments, because of their broad geographic jurisdiction and rural context, generally find it
difficult to focus on the needs of a single urban growth area. In addition,there is no formal local
organizational structure to initiate improvement actions or coordinate efforts as is typical in even a
small town.
Because of these challenges, it is especially important that local citizens cooperate to initiate
improvement efforts and consistently advocate county and state governments for the necessary public
actions.Therefore,successful implementation of the Belfair plan depends on the ability of the various
local interests to organize and cooperate for mutual benefit.
Current conditions and community priorities identified during the planning process suggest a three-
phase implementation strategy.The first phase,to be initiated immediately is to create a sound
framework for future work by establishing the necessary regulatory provisions, planning for SR-3
corridor and sewer line construction and organizing local interests to initiate small scale downtown
improvements. Given the current economic climate and the time it takes to secure public funds and
most of the immediate visible improvements will likely be rather modest, such as a new small business,
consolidated driveways,or a renovated property. But such actions are necessary to provide the spark for
later efforts.As in the case of building a camp fire where you need to start with tinder and twigs before
you can pile on the big logs,community redevelopment often requires starting with small, immediately
achievable efforts and not waiting for the larger projects.
Phase 2 should complete the initial infrastructure improvements along the SR-3 corridor necessary for
the redevelopment of the urban growth area and hopefully add the Salmon Center as a regional
attraction. During this phase, downtown interests should also accomplish the highest priority projects to
BELFAIR UGA PLAN 52
FINAL—February 25, 2022
take advantage of the corridor improvements and encourage the development of close-in residential
development. In addition, planning and funding acquisition of the by-pass corridor be initiated. It is
during this period that the community will begin to see both major public improvements and increased
interest in substantive higher quality private development.
During Phase 3,the community,the County and the State should work together to complete the north-
south bypass,extend utility lines and capitalize on the work of the previous phases. By this time, if the
real estate market has matured, development should be in full swing with infill redevelopment around
the downtown, along the corridor and on the plateau.
It is difficult to estimate the timing of these three phases for several reasons:
• Development trends depend on the growth of the regional and South Kitsap Peninsula
economy, both of which are difficult to predict at this time.
• The short-term effect of the new sewer line in stimulating local growth is also difficult to predict.
• The funding of major public infrastructure is currently difficult,given the budget difficulties at all
levels of government.
• The timing of positive projects such as the Salmon Center and regional trails is also
unpredictable.
Given these uncertainties,the general timing of the various recommended actions cannot be overly
specific. Of course, during this time certain critical needs or funding opportunities may arise that spur or
delay a specific recommendation.
Implementation Updates
Since 2004,significant progress has been made towards implementation of the UGA plan
recommendations, including:
• Adoption of development regulations and other regulatory actions. (Recommendations LU-2
and 4 through 8).
• SR-3 conversion to three lanes, addition of sidewalks and shoulder bike lanes, and driveway
consolidation throughout Belfair's core. (Recommendation T-1 in original plan)
• Design and construction of the sewer trunk line. (Recommendation W-1)
• Construction of the Salmon Center(at a different location than originally proposed in the 2004
plan) and some trail improvements near the center. (Recommendation P-5)
• Planning and funding for SR-3 bypass. (Recommendation T-6 in original plan)
• Design and construction of the sewer trunk line. (Recommendation W-1)
Successful progress on these projects demonstrates the hard-work and dedication of Belfair residents,
the County, and agency partners, and sets the stage for future growth in line with the community's
vision. Much work remains to be done.With the infrastructure investments in Belfair, property
BELFAIR UGA PLAN 53
FINAL—February 25, 2022
development will likely accelerate, increasing the need for stakeholders to work together to implement
the recommendations in this plan to provide parks and open space amenities, and to improve walking
and driving conditions in Belfair's downtown. The following efforts should be completed within the next
1S years as growth and property development take place:
Future and on-going efforts
Updated development regulations and UGA boundary(Recommendations LU-1 and 3).
Continue water quality improvement efforts. (Recommendations W-2 through W-4).
Plan driveway consolidation/streetscape improvements for properties along SR-3.This is a necessary
adjunct to the SR-3 street improvements. (Recommendation P-6)
Establish a downtown improvement task force to initiate collaborative projects such as pedestrian
network,farmer's market/park, etc. (Recommendation LU-1, P-2, P-3, and P-9)
Complete intersection and pedestrian improvements in downtown. (Recommendations P-S and P-6)
Construct alternate North-South SR-3 bypass route. (Recommendation T-6 in original plan)
Add park and other needed community services. (Recommendations P-4 and P-8)
Complete trail system. (Recommendations P-1 through P-9)
BELFAIR UGA PLAN 54
Attachment A: Comprehensive Plan Consistency Edits
EDITS TO COMPREHENSIVE PLAN PAGES
Chapter 1 Citizen's Guide: Amend tables, figures, and text to show a transfer of population growth from
rural county to the Belfair UGA.
Chapter 1 Introduction, Page 5
Remove the following Table
Mason County Population Growth Projection 2016-2036
2016 2036 Population Percent
Increase Increase
2016-2036
Mason County
Total 62,320 83,800 21,480 34%
City of Shelton 10,070 16,200 6,130 61%
Shelton UGA 3,740 7,220 3,480 93%
Urban Growth
Areas(Allyn,
Belfair) 2,990 4,720 1 1,730 58%
i
Rural County 45,520 55,660 1 10,140 22%
Source: Washington State Office of Financial Management and Gty of Shelton
Replace the Table as follows
Mason County Population Growth Allocations: 2016-2036
Area 2016 2036 Population Percent
Increase Increase
2016-2036
Mason County 62,320 83,800 21,480 34%
Total
City of Shelton 10,070 16,200 6,130 61%
Shelton UGA 3,740 7,220 3,480 93%
UGA: Allyn 11990 3,290 1,300 65%
UGA: Belfair 11000 6,510 5,510 551%
Rural County 45,520 50,580 5,060 1 1%
Sources: Washington State Office of Financial Management, City of Shelton, and Belfair UGA Plan
1
Chapter 1 Introduction, Page 7
Remove the following chart
Neyv Reside 2016-2036
Ne4.$fie5idenCs n UCiAs(ANr�,Behar,5tielton) � <•�
Ne,v I bAnf Needed to Aceonyr oda0e2b36 Pcpuiation +
Nee,Nrxcvre nUG&AABetar,Shekon)
i
Total t:, wly for Aci iitiaia Habi ei ft"Caixrty ■�� ..
i
tic.xryr !Capa*it UGAs(ADABel*,51 ltcn)
0 5000 10000 15000 20000 254M
Source: Washington State Office of Financial Management and City of Shelton Forecast
Replace the chart as follows
New Residents 2016-2036
New Residents in UGAs(Allyn,Belfair,
Shelton)
New Housing Needed to Accommodate
2036 Population
New Housing in UGAs(Allyn,Belfair,
Shelton)
Total Capacity for Additional Housing in
Rural County
Housing Capacity in UGAs(Allyn,Belfair,
Shelton)
0 5,000 10,000 15,000 20,000 25,000
Sources: Washington State Office of Financial Management, City of Shelton Forecast, Belfair UGA Plan
CHAPTER 3 LAND USE ELEMENT
Amend tables, figures, and text to show a transfer of population growth from rural county to the Belfair
UGA, e.g., Tables 1 and 14.
2
Remove Table 1
Table I.-Mason County Population Projection 2016-2036
MASON COUN rY AND URBAN GROWTH AREA
20 YEAR POPULATION PROJECTION
2016 2036 Population Parctnt
Increaso Increase
2016-2036
aeon County
atal 62,320 UM 21,480 34%
of Shehon 10,070 16,200 6,130 61%
Shelton U 3,740 7,220 3,480 93%
rban Growth
s(Allyn,
elfair) 2,990 4,720 1,730 58%
Ural County 45,520 55,660 10,140 22%
Source Washongton$late Office of Financial Manaeemem
Replace Table 1 as follows
Table 1. Mason County Population Growth Allocations: 2016-2036
Area 2016 2036 Population Percent
Increase Increase
2016-2036
Mason County 62,320 83,800 21,480 34%
Total
City of Shelton 10,070 16,200 6,130 61%
Shelton UGA 3,740 7,220 3,480 93%
UGA: Allyn 1,990 3,290 1,300 65%
UGA: Belfair 1,000 6,510 5,510 551%
Rural County 45,520 50,580 5,060 1 1
Sources: Washington State Office of Financial Management, City of Shelton, and Belfair UGA Plan
3
Remove Table 14 as follows
Table 14. Area Growth Projections for Mason County 2016-2036
Area Additional Shan of Percent Total
Population Population Land Area
Growth
Shelton Urban Growth
Area 9,610 44% 1.5%
tielfair Urban Growth Area 430 2% .4%
Allyn Urban Growth Area 1,300 6% .1%
Fully Contained
Community Reserve 600 3% -
RAC—LAM IRDS 400 2% <1%
Rural Lands 9,140 43% 63'§
Total County 21,480 100%
Replace Table 14 as follows
Area Additional Share of Percent
Population Population Total
Growth Land Area
Shelton Urban Growth Area 9,610 45% 1.5%
Belfair Urban Growth Area 5,510 26% 0.4%
Allyn Urban Growth Area 1,300 6% 0.1%
Fully Contained Community Reserve 600 3% -
RAC— LAMIRDS 400 2% 1 <1%
Rural Lands 1 4,060 19% 63%
Total County 21,480 100%
Future Land Use Map: Published outside of plan — Amend UGA boundary to reflect adjustments for
public lands. See Error! Reference source not found..
4
Amend growth capacity to match preferred alternative in Table 9.
Remove Table 9
Table 9_ Bel#air Urban Growth Area Zoning Summary 2015-2016
Zone Total Undeveloped Dwelling Potential Times 2.S
Acres Acres u"itli/saes Units persons/unit
Long Term Agriculture(LTA) 17 0 1/10 1 2
Festival Retail(FR) 20 3 0 0 0
General Commercial(G() 146 107 0 0 0
General Commercial Business
Industrial(GC-81) 146 83 0 0 0
Mixed Use(M Li l ----------- --- 185� �—_ 78 � 1 Clt'1 -------- 787
------�—._ 1967
Business Industrial(B-1) 133 59 0 0 0
Multi Family Residential(R-10) 11_717 158 1i1P1 1584 3961
Med.Density Residential(R-5) 825 716 5/1 3580 8951
Single Family Residential(R-4)— 723 279 4/1 1117 — 279
Totals 2,392 1,433 7,069 17,675
Sauce: Masan County Assessor's Office,2015 and Masan Courty Zoning Map
*Assessors Data and Zoning Data are different data sets,used for destinct purposes,and de o"land use differently.
Replace Table 9 as follows
Belfair Urban Growth Area Zoning Summary 2022
Zone Gross Net Max Assumed Percent Pipeline Total Net Total Net
Acres Developable Residential Residential Residenti HU Pop HU
Acres Density Density al
(DU/AC) (DU/AC)
R-4 579 39 4.0 3.0 100% - 274 113
R-5 609 138 5.0 4.0 100% 160 1,725 712
R-10 213 56 10.0 5.79 100% - 785 324
PF 94 - - - - - - -
LTA 17 8 - - - - - -
MU 220 34 - 15.0 50% 234 1,136 469
MP-MU 245 76 - 15.0 50% 85 1,589 656
GC 28 3 - - - - - -
GC-BI 81 21 - - - - - -
B-1 129 44 - - - - - -
Total 2,216 420 479 5,509 2,274
Note: The model subtracts existing housing units on redevelopable properties in some locations and are reflected in total net
housing units.
5
Amend demand for residential capacity in net acres in Table 16.
Remove Table 16
Table M land Capacity Summary(Net Acres)
Area(all acres Residential Non- Total
are net Capacity Residential Capacity
acres)" Capacity
Urban Growth
Areas $1100 1,710 4,810
-Shelton 1,650 1,430 3,080
- Belfair 1,230 250 1,480
Allyn 220 30 250
•E xcf;,s,vely nan-res�dent�al
••Net acres excludes unavailable lands,unsuitable lands;20 percent roads&25
percent market factor
Replace Table 16 as follows
Area (all acres Residential Non Total
are net acres) Capacity Residential Capacity
Capacity
Urban Growth Areas 3,100 1,710 4,810
-Shelton ** 1,650 1,430* 3,080
- Belfair*** 1,652 564 2,216
-Allyn ** 220 30* 250
*Exclusively non-residential
** Net acres excludes unavailable lands, unsuitable lands; 20 percent roads & 25 percent market factor
***See Belfair UGA Plan and EIS.Excludes unavailable and unsuitable lands and applies discount factors.
CHAPTER 4 RURAL ELEMENT
Amend tables, figures, and text to show a transfer of population growth from rural county to the Belfair
UGA, e.g., Table 1.
6
Remove Table 1, page 6 of 28
Table 1. Mason County Population Projection 2016-2036
MASON COUNTY AND URBAN GROWTH AREA
20 YEAR POPULATION PROJECTION
P"ulatlon Percent Increase
2016 2036 Increase 2016-2036
Mason County Total 62,320 83,800 21,48 34
City of Shelton 10,070 16,20C 6,13 61
Shelton UGA 3,740 7,22 3,4$ 93
rban Growth Areas(Allyn,
Ffair) 2,99 C44,72 A1,173 5f8'oral Gour�ty :45,S S7, 10,1 Z�
--,—T ---- '
Source: Washington State Office of financial Management
Replace Table 1 as follows
Table 1. Mason County Population Growth Allocations: 2016-2036
Area 2016 2036 Population Percent
Increase Increase
2016-2036
Mason County 62,320 83,800 21,480 34%
Total
City of Shelton 10,070 16,200 6,130 61%
Shelton UGA 3,740 7,220 3,480 93%
UGA: Allyn 1,990 3,290 1,300 65%
UGA: Belfair 11000 6,510 5,510 551%
Rural County 45,520 50,580 5,060 1 1
Sources: Washington State Office of Financial Management, City of Shelton, and Belfair UGA Plan
7
Amend Figure 1, page 10 of element, with Belfair UGA Boundaries per Exhibit 1 below.
Figure 1. Mason County Rural Lands
� � ,.,,,,.,,.,... •�rl ,•.mow' F �, ,..�..--�.._..�--_,..-..-,
a s
- jr
§ ,a
t
8
Exhibit 1. Belfair UGA Boundaries as Amended
'' rl
t �
KEG N R D
E
r = 0
I
'' 2 I �-P
NEWKIRK'RD a 1
�cLN 1 BREMERTON
n 1
Hp'14,
8
EPo",DR
I
1
p� 1
O NE MCKNIGHT RD
Q Z .:- -
D 0 1
LL Z
v m p
u, = w e 1
3.)
1
pa � Q NEB' 1
I
NE�ARSG�g`JO �yo2 W 1
CEP Z 1
��P I
F 2 300qj
- �p
1
O AO 11
1
3 1
1
1
1
1
NESOUBE�N 1
1
NE q��ER 1
- Z 1
1
1
1
1
1
1
1
0 Miles :1II BERK
Map Date:February 2022
13 Belfair UGA Boundary Future Land Use
UGAs Agricultural Resource Lands
Water Bodies Agricultural/UGA Overlap
Streams ❑ Long Term Commercial Forest
❑ Rural
Urban Growth Area
9
CHAPTER 5 HOUSING ELEMENT
Amend tables, figures, and text to show a transfer of population growth from rural county to the Belfair
UGA, e.g., Table 1.
Remove Table 1, page 6 of 30
Table 1. Mason County Population Projection 2016-2036
----MASON COUNTY AND URBAtvi GROWTH AREA
20 YEAR POPULATION PROJECTION
2016 2036 Population Percent
Increase Increase
2016-2036
sawn County 62,320 83,800 21,480 34%
otal
ity of Shelton 10,070 16.200 6,130 61%
Shelton UGA 3,740 7,220 3,480 93%
Urban Growth 2,990 4320 1,730 58%
ural County 45,520 55,660 10,140 22%
Source: Washington State Office of Financial Management
Replace Table 1 as follows
Table 1. Mason County Population Growth Allocations: 2016-2036
Area 2016 2036 Population Percent
Increase Increase
2016-2036
Mason County 62,320 83,800 21,480 34%
Total
City of Shelton 10,070 16,200 6,130 61%
Shelton UGA 3,740 7,220 3,480 93%
UGA: Allyn 1,990 3,290 1,300 65%
UGA: Belfair 1,000 6,510 5,510 551%
Rural County 45,520 50,580 5,060 1 1
Sources: Washington State Office of Financial Management, City of Shelton, and Belfair UGA Plan
10
Remove Table 5, page 12 of 30
Table S. Mason County Housing Projection 2016-2036
2016 Housing 2036 Housing Number of New %Increase 2016-
Units Units Housing Units 2036
Mason County Total 33,400 44,000 10,650 32%
City of Shelton 3,900 5,000 1,150 30%
Urban Growth Areas
(Allyn,Belfair,Shelton) 3,000 4,500 1,500 50%
Rural County 26,500 34,500 8,000 30%
Source: Washington State Office of Financial Management
Replace Table 5 as follows
Table 5. Mason County Housing Projection 2016-2036
2016 Housing Units 2016 Housing 2036 Housing Number of % Increase
Units Units New 2016-
Housing Units 2036
Mason County Total 33,400 44,000 10,650 32%
City of Shelton 3,900 5,000 1,150 29%
Urban Growth Areas 3,000 6,600 3,600 120%
(Allyn, Belfair, Shelton)
Rural County 26,500 32,400 5,900 22%
11
Remove Figure 4, page 13 of 30
NP%v Residents 20I&2036
Ne v lie�in LUk,VWA,Etelfair,5heken) +
Nee Ikxr4-f Needed toAcconviWate20 bPoxidation
Ne%v Hogg in L1GAs Mn,Bela r,9Acn)
Total Capacityfor Additional Ha&v in Rural Cocnty �■� �:
Hutni C QPa Xity in LJIG&V lhyrl,Belf4,9 1AM) w
0 S000 10000 15000 20000 25000
Source: Washington State Office of financial Management and City of Shehon forecast
Replace the chart as follows
New Residents 2016-2036
New Residents in UGAs(Allyn,Belfair,
Shelton)
New Housing Needed to Accommodate
2036 Population
New Housing in UGAs(Allyn,Belfair,
Shelton)
Total Capacity for Additional Housing in _-,■,�Rural County
Housing Capacity in UGAs(Allyn,Belfair,
Shelton)
0 5,000 10,000 15,000 20,000 25,000
Sources: Washington State Office of Financial Management, City of Shelton Forecast, Belfair UGA Plan
12
CHAPTER 6 CAPITAL FACILITIES ELEMENT
Amend tables, figures, and text to show a transfer of population growth from rural county to the Belfair
UGA, e.g., Table 3.
Amend Figure 1, page 4 of 85
Figure 1.Map of Mason County 2018-2023 Capital Facilities Plan
5vMOM �w.ats
#ar Aow o Rn�t
belNlarilw, .�', .r"r
"WOa,9b-W T ,rb' 1 tl t flaw
t�ls..• *,"PY I.l_.k.x R.Fk.,�.JMIt�IF�hi{�.
llpteatYfFtatx '; r'� lR1W1�(3M Il�R
_ fi �yl,M�C-Jtxjl�N�1N
i •'
s w•
+arse
Ldu�tji F acilities Element Page 4 Of as
Amend Belfair UGA boundary to match Exhibit 1 on page 9.
13
Amend Table 3 page 9 of 85
Tabla 3. Mason County Population Growth Projection 2016-2036
Percent
Population Increase
2016 2036 Increase 2016-2036
Mason County Total 62,320 83,800 21,480 3414
City of Shelton 10,07 16,200 6,13 61
Shelton UGA 3,74 7,220 3.48 9394
Urban Growth Areas(Allyn,Belfair) 2.99 4,720 1,73 5894
Rural Coun 45,52 55,660 10,14 22
Replace Table 3 as follows
Mason County Population Growth Allocations: 2016-2036
Area 2016 2036 Population Percent
Increase Increase
2016-2036
Mason County 62,320 83,800 21,480 34%
Total
City of Shelton 10,070 16,200 6,130 61%
Shelton UGA 31740 7,220 3,480 93%
UGA: Allyn 1,990 3,290 1,300 65%
UGA: Belfair 1,000 6,510 5,510 551%
Rural County 45,520 50,580 5,060 1 1
Sources: Washington State Office of Financial Management, City of Shelton, and Belfair UGA Plan
Create a subsection that references capital improvements identified in Belfair Planned Action, particularly
transportation improvements and the SEPA mitigation fee.
Create new Section 8 after page 84
Section 8. Belfair UGA
The Belfair UGA has been evaluated for transportation, sewer, water, and power and other services.
Please see the Belfair UGA Plan 2022, and the Belfair Planned Action EIS and Ordinance regarding
improvements and a SEPA mitigation fee for transportation.
CHAPTER 7 UTILITIES ELEMENT
Amend tables, figures, and text to show a transfer of expected housing growth from rural county to the
Belfair UGA, e.g., Table 4.
14
Replace Table 4, page 23
Table 4. Projected Housing Needs 2016-2036
2016 Housing 2036 Housing Number of New %Increase
Units Units Housing Units 2016-2036
Urban Growth Areas 3,000 4,5)00 1,500 50%
- - ----------- _l
(--- Rural County 26,500 34,500 8,000 30%
Shelton 3,000 S'(W 1,150 30%
Mason County Total 33,400 44,000 10,650 32%
Source_US Census Housing Survey and Office of Financial Management
Replace Table 4 as follows
Table 4. Mason County Projected Housing Needs 2016-2036
2016 Housing Units 2016 Housing 2036 Housing Number of % Increase
Units Units New 2016-
Housing Units 2036
Mason County Total 33,400 44,000 10,650 32%
City of Shelton 3,900 5,000 1,150 29%
Urban Growth Areas 3,000 6,600 3,600 120%
(Allyn, Belfair, Shelton)
Rural County 26,500 32,400 5,900 22%
Reference the Belfair Planned Action for growth assumptions and planned improvements, especially
power, e.g., in relation to Table 5.
15
Add a footnote below Table 5 as follows:
Table 5. Mason County Residential,Commercial, Industrial Electricity Demand 2016-2036
1993 2016 2036 Projection
Mason County Population 38,350 62,320 83AM
PUD 3 Electricity(kWh) 493,000,000 610,000,000 770,000,000
PUD 1 Electricity(kWh) S8,700,000 73,100,000 91,000,000
Per Capita kWh 14,390 10,960 110,000
Source:U,S.Energy Information Administration(EIA)State Energy Data System,PUD No. 1,PUD No.3.and
the 2010 Census
Average household size was estimated to be 2.57,US Census Bureau,American Community Survey
See the Belfair Planned Action EIS for power evaluation.
CHAPTER 8 TRANSPORTATION ELEMENT
Update plans incorporated into the Transportation Element, page 3:
Urban Growth Area Plans
• Belfair Urban Growth Area Plan:https://masoncountywa.gov/community-services/belfair-eis/
Amend description of Belfair UGA Plan and Access and Circulation, page 56.
BELFAIR UGA PLAN UPDATE, INCLUDING ACCESS AND CIRCULATION STUDY
Planned construction of a sewer system and improvements associated with the Belfair Bypass create
an opportunity for Mason County to realize its long-range vision for this small urban growth area and
reduce growth pressures in outlying areas.A transportation plan,subarea plan update,and planned action EIS and
ordinance,coordinated with intended changes to land use will help guide near-term and long-term investments in
order to maximize the opportunities presented by upcoming Belfair Bypass project funding, maximize mobility
benefits to this small community,and inform WSDOT decisions about practical solutions for enhancing the
character of SR 3 through Belfair,where the state highway effectively functions as"Main Street'for this small
community.A focus on access and circulation can address not only long-term opportunities but also the
near-term impacts associated with what will be several years of major traffic disruption caused by
Bypass construction activities.An access and circulation study can also speak to specific local concerns
such as emergency response access,and appropriate speed limits on urban facilities.
Amend description of. Cross reference Belfair Planned Action in Capital Facilities Project List, page 58.
BELFAIR CONNECTOR STUDY
While the Bypass itself is a funded WSDOT project, many ancillary projects and needs
will require Mason County's leadership and coordination if they are to be fully
realized.This includes the location and configuration of potential new connections
between SR 3 and the new bypass.Various studies over the years have considered
possible connections between the limited access bypass and SR 3.Some of the
potential connections discussed previously have included Rasor Road, Romance Hill
Road,and Newkirk Road.The Belfair Connector Study will identify the most practical
16
route options and an associated funding strategy.These will be County roads,not
WSDOT facilities. Ideally,construction of one or more of these new connections will
be complete at the same time as the new bypass, ate_.A source of planned improvements also includes the
subarea plan update, and planned action EIS and ordinance.
Update list of transportation improvements based on Preferred Alternative mitigation in Transportation
Improvement Program (Appendix B).
Add as a page in Appendix B:
The Belfair UGA has been evaluated for transportation. Please see the Belfair UGA Plan 2022,
and the Belfair Planned Action EIS and Ordinance regarding improvements and a SEPA mitigation
fee for transportation.
17