Loading...
HomeMy WebLinkAboutBLD2021-01025 Final Detached Metal Shop - BLD Permit / Conditions - 1/25/2022 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us B DD2021-01025 GARAGE/ STORAGE PROJECT DESCRIPTION: NEW DETACHED METAL SHOP ISSUED: 08/20/2021 SITE ADDRESS: 233 E WILLIAMS PL ALLYN EXPIRES: 0 211 6/2 0 2 2 PARCEL: 122292400010 APPLICANT: ALLEN GREGORY WAYNE&TIFFANI JEAN OWNER: ALLEN GREGORY WAYNE&TIFFANI JEAN P0 BOX 1914 P0 BOX 1914 ALLYN,WA 98524 ALLYN,WA98524 253-229-9855 CONTRACTOR: ALL-STEEL CARPORTS INC PO BOX 613 FRESNO, CA 93703 559.354.6723 GENERAL CONTRACTOR'S LICENSE: ALL-STEEL CARPORTS INC License: CALIFAS843NC PO BOX 613 Expires: 08/30/2022 FRESNO,CA 93703 559.354.6723 VALUATIONS: FEES: Paid Due U VB Utility, miscellaneous 1500.00 $73,185.00 Building Permit Fee $885.22 $0.00 State Fee-Residential $6.50 $0.00 Planning Review Fee $240.00 $0.00 Technology Surcharge $29.21 $0.00 Plan Check Fee $575.39 $0.00 Total: $73,185.00 Totals : $1,736.32 $0.00 REQUIRED INSPECTIONS Setback Inspection Rough- Plumbing Inspection Footing Inspection Mechanical Inspection Foundation Wall-Pre-Pour Inspection Insulation Inspection Shearwall Inspection BLD-Final Inspection Framing Inspection Printed by:Genie Mcfarland on:08/20/2021 03:49 PM Page 1 of 5 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GARAGE/ STORAGE BLD2021-01025 CONDITIONS * The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal. * All property lines shall be clearly identified at the time of foundation inspection. * Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). * Retaining walls needed to support a surcharge such as structures, roads,or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. * All permits expire 180 days after permit issuance,or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * The foundation/footing must be placed on undisturbed,firm-native soil * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. Printed by:Genie Mcfarland on:08/20/2021 03:49 PM Page 2 of 5 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GARAGE/ STORAGE BLD2021-01025 ' CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED",they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. * When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at(206)357-2620, ext. 630. * WIND LOADS-Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * Approved per dimensions and setbacks on submitted site plan.Setbacks are measured from the furthest projection of the structure. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries(L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * When parcel development requires direct access to county road(s),a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext.450 or 100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. Printed by:Genie Mcfarland on:08/20/2021 03:49 PM Page 3 of 5 Mason County Mason County - Division of Community Development rz 615 W.Alder St. Bldg.8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GARAGE/ STORAGE BLD2021-01025 " All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option"A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan"constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * The applicant acknowledges that the structure is only permitted for use consistent with the parcel's current zoning. * Must comply with the regulations found in MCC 8.52.170-Fish and wildlife habitat conservation areas. https://library.municode.com/wa/mason county/codes/code of ordinances? node Id=TIT8EN PO—CH 8.52REOR 8.52.170FIWIHACOAR I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: 6 Ln L t-) C:ix�Contractor or AuthoJird Agent: Date: " Printed by:Genie Mcfarland on:08/20/2021 03:49 PM Page 4 of 5 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GARAGE/ STORAGE BLD2021-01025 Printed by:Genie Mcfariand on:08/20/2021 03:49 PM Page 5 of 5 MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 SHELTON:360-427-9670,EXT 352 COMMUNITY SERVICES BELFAIR:360-275-4467,EXT 352 Building,Planning,Environmental Health,Community Wealth E LMA:360-482-5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php Permit Number BLD2021-01025 Date Issued 08/20/2021 Issued By Project NEW DETACHED METAL SHOP Site Address 233 E WILLIAMS PL Applicant ALLEN GREGORY WAYNE&TIFFANI JEAN Contractor ALL-STEEL CARPORTS INC Contractor Phone 559.354.6723 Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type GARAGE/STORAGE Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED..** PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Department Building Official: Community Services Designee Concrete Setbacks Z.-L-o.� ,Tj-L Slab -Z-s<-L.� J"L. Footing Perimeter J7--e Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing)(- S­Lk UT-1 Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building T _ I- 7-3- 2'L Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other 'spa coo MASON COUNTY COMMUNITY SERVICES �ZI� 010ZS '► } PERMIT ASSISTANCE CENTER: Permit No: WW BUILDING.PLANNING.PUBLIC HEALTH.FIRE MARSHAL 615 W.Alder Street,Shelton,WA 98584 Phone Shelton:(360)427-9670 ext.352•Fax(360)427-7798 Phone Be/lab.(360)275-4467•Phone Elmo:(360)482-5269 BUILDING PERMIT APPLICATION PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATION: Jul f D NAME:Greg&Tiffani Allen NAME:California All-Steel Carports, Cy MAILING ADDRESS:PO Box 1914 MAILING ADDRESS:PO Box 613 V V� — CITY: Allyn STATE:WA ZIP:98524 CITY: Fresno STATE: CA ZIP: 9370 r Str�PHONE#I:253-229-9855(Greg) PHONE: 559-354-6723 CELL: �t PHONE#2:253-229-7153(Tiffani) EMAIL: sales@califomiaallsteel.com EMAIL:gallen745@comcast.net/tallen745(cDcomcast.net L&I REG# CALIFAS843NC EXP. 08/30/22 PRIMARY CONTACT: OWNER® CONTRACTOR❑ OTHER❑ NAME Greg Allen EMAIL gallen745@comcast.net MAILING ADDRESS PO Box 1914 CITY Allyn STATE WA ZIP 98524 PHONE 253-229-9855 CELL 253-229-9855 PARCEL INFORMATION: -8 _n PARCEL NUMBER(12 Digit Number) 12229-24-00010 ZONING R 1 LEGAL DESCRIPTION(Abbreviated) TR 1 OF SE NW FIRE DISTRICT 3 SITE ADDRESS r -133 & LJ,I I feAw r ICI CITY Allyn DIRECTIONS TO SITE ADDRESS Head North on WA-3 towards Allyn for 15.8 miles.Turn right onto private dirt road called'Williams Place' continue to 3-way fork and take middle road to house and turn left following easment to property.Follow red signs with property address. IS THE PROJECT WITHIN 300 FT OF SLOPES)GREATER THAN 14%: YES❑ NO Dg IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (Checkaurharapply): SALTWATER❑ LAKE❑ RIVER/CREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF❑ STREAM❑ TYPE OF WORK: NEW N ADDITION❑ ALTERATION❑ REPAIR❑ OTHER ❑ USE OF STRUCTURE(Residence,Garage,Commercial Bldg,Etc.) Garage IS USE: PRIMARY❑ SEASONAL❑ NUMBER OF BEDROOMS N/A NUMBER OF BATIIROOMS NIA HEATED STRUCTURE? YES(Wh,*Bldg)❑ YES(ParrAJojBldg)❑ NO DESCRIBE WORK Contruct an all metal garage attached to cement slab SQUARE FOOTAGE:(propme+e a upg) 1ST FLOOR sq.ft. 2ND FLOOR sq.IL 3RD FLOOR sq.ft. BASEMENT sq.ft. DECK sq.ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq.ft. GARAGE 1,500 sq.ft. Attached❑ Detached N CARPORT sq.ft. Attached❑ Detached❑ MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED* MAKE N/A MODEL N/A YEAR N/A _LENGTH N/A WIDTH NIA BEDROOMS NIA BATHS N/A SERIAL NUMBER NIA ENVIRONMENTAL HEALTH: Approved septic design and permit on file with Mason County Permit#SWG2020-00644 "*Note"*Septic system is not being Installed at this time. SEWAGE/SEWER SOURCE: SEPTIC JK SEWER❑ / NEW X EXISTING❑N/A PLUMBING IN STRUCTURE? YES❑ NO IJyes,attach completed Water Adequacy Form PERIMETERNOUNDATION DRAINS PROPOSED? YES❑ NOF EXISTING SQ.FT. EXISTING BEDROOMS NIA PROPOSED BEDROOMS NIA TOTAL BEDROOMS NIA OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such Is by signature below.I declare that I am the owner and I further declare that 1 am entitled to receive this permit and to do the work as proposed.I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project. The owner or legal representative,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or d construction work is suspended fora period of 180 days. - PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLIC N OF 180 DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON COUNTY CODE 14.08.42) Si a re&OWNER(Must be sinned by the OWNER) Date DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL PUBLIC HEALTH c d` '1` O d°/ > w a 1 37r�,► � n�G 22� dOVYO f cow Q � 1 m ' _. 3 CD Dw� PLANNING: / - o -ALL SETBACKS ARE MEASURED _ o _ yD` yo FROM THE FURTHEST QJECTIOI�d OF THE BUILDING R "T 6 _ L - • A1�� T t r _. . . . 1 9 r 3 _ CD '^ i N o O � O b N .. �l f - _ m _0 03D C C CL m ° N Df' _.GE¢��J/7 j _ N(_o raopo"_wEw.t c ► v:.� ._, , =cb axi ixc /Nth ". CD _ ( B�oG - APPROVED mAwm couwff DCD PLANNING S�pLA*REQUIRES?TO BE ON SITE SUBSET TO APPROVAL ii.4_ Gi eg Allen Parcel# 12229-24-00010 Bin# (p 2 S JUL 01 2021 Mason County zi Department of Community Development 615 V�. ' :. . _ mail Parcel Stormwater Management Application/Worksheet (page 1 of 2) Per Mason County Code, Title 14,Chapter 14.48 a stormwater site plan is required whenever a building application is made for residential development, or redevelopment',with more than 2,000 square feet of impervious surfacez. 'Redevelopment means,on an already developed site,the creation or addition of impervious surfaces,structural development including construction, installation or expansion of a building or other structure,and/or replacement of impervious surface that is not part of a routine maintenance activity,and land disturbing activities associated with structural or impervious redevelopment. 2Common impervious surfaces include,but are not limited to,rooftops,walkways,patios,driveways,parking lots or storage areas, concrete or asphalt paving,gravel roads,packed earthen materials,and oiled,macadam or other surfaces which similarly impede the natural infiltration of stormwater. Open,uncovered retention/detention facilities shall not be considered as impervious surfaces. To Calculate Impervious Surfaces Please Complete This Table Surface Type Length X Width = Area *All dimensions in feet Buildings 30- X 50' = 1,500 sq.ft. X = Measurements for buildings are taken at the X = perimeter of the farthest projections(example: X eaves/gutters) = Driveways 416' X 10' = 4,160 sq.ft. X = Length of drive begins at the right of way X = Parking Areas X = X = Any paved, gravel or packed area per definition X — above table Patios/Walks X = X = Any paved, gravel or packed area per definition — above table X Others X = EX = If the total impervious area of the proposed site X = development is greater than 2000 square feet a Total Impervious Surface Area (sum of all areas) 5,660 sq.ft. Small Parcel Stormwater Site Plan is Required If the Total Impervious Surface Area is LESS THAN 2000 Square Feet,please read,acknowledge and sign below. Based Upon the information you have provided a Stormwater Site Plan IS NOT required for this development activity. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owner's legal representative,or the contractor.I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- described property for review and inspection as may be required. X Owner/Agent/Contractor(circle one)Date: If the Total Impervious Surface Area is GREATER THAN 2000 Square Feet,please read,acknowledge and sign the information provided on page 2 of 2. Page 1 of 2 .Name � Greg Allen Parcel # 12229-24-00010 BLD# Mason County Department of Community Development Small Parcel Stormwater Management Application/Worksheet (page 2 of 2) Based Upon the information you have provided a Stornmuter Site Plan IS Required for this development activity. Title 14,Chapter 14.48 of the Mason County Code(MCC)regulates compliance requirements for Stormwater Management in this jurisdiction.A complete copy of the ordinance can be found on the Mason County website: http//www.co.mason.wa—us/code/commissioners/index.htm Please follow the links to"Title 14,Chapter 14.48 Stormwater Management". Regulated activities shall be conducted only after Mason County Public Works approves a stormwater site plan (Mason County Code Title 14 Chapter 14.48 section 14.48.70). You will receive a copy of the Public Works document entitled"Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan". This document will assist you in preparing the necessary information and plans for Public Works to review and approve. Per Department of Public Works this document will constitute an approved plan if all of the relevant details*are to be installed in their entirety AND no part of the stormwater system adversely affects any septic system (see Environmental Health information below). If an alternative system is to be used a plan will need to be submitted to Public Works for approval. A design by a registered professional may be required for more complex sites. *These details are found in the document Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan on the pages that begin with"Handout" PLEASE INITIAL BELOW TO INDICATE THE STORMWATER MANAGEMENT PLAN FOR THIS SITE A) The relevant details from Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan will be installed in their entirety AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. BX2kealternative plan and/or professional design will be submitted to the Department of Public Works for approval AND the system ill be located as not to adversely affect any septic systems on this,or any other,parcel. If you have further questions pertaining to parcel drainage and stormwater management Mason County's Public Works Department can provide additional instructions,guidance and examples. (Section 14.48.130)contact Public works at: Phone: (360)-427-9670 EXT. 450 Mail: P 0 Box 1850,Shelton WA 98584 Physical: 415 N 6th St,Shelton WA 98584 If this development has,or will have,a septic/drainfield system you may need to contact Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this,or any other,parcel.You may also wish to consult with the septic design professional involved with the project. Mason County Division of Environmental Health can be reached at: Phone: (360)-427-9670 EXT. 352 Mail:P 0 Box 1666,Shelton WA 98584 Physical: 426 W Cedar St, Shelton WA 98584 A condition will be added to the building permit that states,in part,that all conditions the stormwater site plan will be met prior to a request for final inspection of the building permit. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor.I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- described property f iew and inspection as may be required. X er gent/Contractor(circle one)Date: 7 Page 2 of 2