HomeMy WebLinkAbout2021-071 - Res. Six-Year Transportation Improvement Program 202k- oq1
RESOLUTION NO. V\ALW
Six-Year Transportation Improvement Program
WHEREAS,in compliance with 136-15 WAC,Mason County has prepared the
attachment Six-Year Transportation Improvement Program for the period January 1,2022
through December 31,2027;and,
WHEREAS,the Board of County Commissioners hereby certifies that the priority array
of potential projects on this County's road system, including bridges,was prepared by the
County Engineer during the preparation of the said Six-Year Transportation Improvement
Program; and,
WHEREAS,the Board of County Commissioners reviewed the current bridge condition
report as prepared by the County Engineer on March 22,2021;and,
WHEREAS,the Board of County Commissioners finds that the proposed 2022-2027
Six-Year Transportation Improvement Program is consistent with the County Comprehensive
plan; and,
WHEREAS,the Board of County Commissioners has held a public hearing on this 9'
day of November,2021.
NOW,THEREFORE,BE IT RESOLVED,that the attached Six-Year Transportation
Improvement Program for 2022 through 2027 be adopted,which is hereby incorporated and
made part of this Resolution.
BE IT FUTHER RESOLVED that the County Engineer is hereby directed to distribute
copies of the Six-Year Transportation Improvement Program for 2022-2027 to all required
agencies.
ADOPTED this 9!'day of November 2021.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY,WASHINGTON
ATTEST:
Y HEREIN,Chair
NJ
MCKENZIE T ,Clerk of the Board
KEVIN SHUT ,Vice Chair
APPROVED AS TO FORM:
-SHARON AASK,Commissioner
TIM WHITEHEAD,Ch.DPA
cc: Commissioners
Public Works
Community Development
County Road Admin.Board
WSDOT
Six Year Transportation Improvement Program
Agency: Mason County 9/28/2021 From 2022 to 2027
Co.No.: 13 Co.Name: Mason County Hearing Date: Adoption Date:
City No. --- MPO/RTPO: Peninsula Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
m A. Federal Aid No. B. Bridge No. $rn Fund Source Information Expenditure Schedule Project Only
0 o f C. Project Title J w a) Federal FundingR/VV
a z as D. Street/Road Name of Number y Q r Phase Federal Federal State 4th Envir Type Required
u_ E. Beginning MP or road-Ending MP or road o a a Start Fund Cost by Fund State Local Total 1 st 2nd 3rd thru Date
F. Describe Work to be Done ~ (mm/dd/ Code Phase Source Funds Funds Funds I 6th mm/
1 1 3 6 8 9 10 11 1 12 1 13 1 14 15 16 171 18 19 20 21
CRP PE 10/1/2021 STP 25.95 4.05 30 30
E.Agate Road Resurfacing Project RW
07 1 Rd.No.: 23910 0.68 CN 6/1/2022 STP 369.347 57.491 426.838 426 E N/A
From: MP 3.10 To: MP 3.78
Total 2022 Project Cost $11,460,178 TOTALS 395.297 61.541 11460.178 456
CRP PE 4/1/2022 STP 17.3 2.7 20 20
Shelton Springs Road Improvement Project RW
07 2 Rd.No.: 50810 1.00 CN 6/1/2022 STP 349.153 54.492 403.645 384 E N/A
From: MP 0.00 To: MP 0.62
Total 2022 Project Cost $423,645 TOTALS 366.453 57.192 423.645 404
CRP PE 1/1/2022 STP 25.95 4.05 30 30
Mason Lake Rd Improvement Project RW
07 3 Rd.No.: 52210 1.00 CN 6/1/2022 STP 550 145.56 695.558 695 E N/A
From: MP 5.23 To: MP 6.23
Total 2022 Project Cost $725,558 TOTALS 575.95 149.61 725.558 725
CRP PE
Sunny Side Resurfacing Project RW
09 4 Rd.No.: 42360 2.90 CN 6/1/2022 145 145 145 E N/A
From: MP 0.55 To: MP 3.45
Gravel to HMA
Total 2022 Project Cost $145,000 TOTALS 145 145 145
CRP PE
California Rd Resurfacing Project RW
09 5 Rd.No.: 41100 1.30 CN 6/1/2022 65 65 65 E N/A
From: MP 0.00 To: MP 1.30
Gravel to Chip Seal
Total 2022 Project Cost $65,000 TOTALS 65 65 65
Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP- Federal Lands Access Program
PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and
RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program State Emergency Management funds
CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board
Six Year Transportation Improvement Program
Agency: Mason County 9/28/2021 From 2022 to 2027
Co.No.: 13 Co.Name: Mason County Hearing Date: Adoption Date:
City No. --- MPO/RTPO: Peninsula Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
m A. Federal Aid No. B. Bridge No. $rn Fund Source Information Expenditure Schedule Projects Only
o a C. Project Title d d Federal Fundin R/VV
r a z D. Street/Road Name of Number Y r Phase Federal Federal State 4th Envir Type Required
u_ E. Beginning MP or road-Ending MP or road O o-o- Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Date
F. Describe Work to be Done ~ mm/dd/yy Code Phase Source Funds Funds Funds 6th m
1 3 6 8 9 10 11 12 1 13 1 14 15 16 17 181 19 20 21
CRP PE
Kelly Hall Rd Resurfacing Project RW
09 6 Rd.No.: 013000 1.95 CN 6/1/2022 97.5 97.5 97.5 E N/A
From: MP 0.00 To: MP 1.95
Gravel to Chip Seal
Total 2022 Project Cost $97,500 TOTALS 97.5 97.5 97.5
07 PE 10 10 10
08 Programmatic Bridge Program RW 5 5 5
09 7 CN 50 50 1 50
17
18
19 Total 2022 Project Cost $65,000 TOTALS 65 65 10 5 50
07 PE 10 10 10 10 10 30
08 County-Wide Small Capital Projects RW 5 5 5 5 5 15
09 8 CN 85 85 85 85 85 255
17
18
19 Total 2022 Project Cost $100,000 TOTALS 100 100 100 100 100 300
07 PE 10 10 10
08 Neighborhood Roadway Safety Grants RW
09 9 CN
17
18
19 Total 2022 Project Cost $10,000 TOTALS 10 10 10
CRP PE 1/1/2022 RAP 5 5 5
North Shore Rd Cady Cr.Culy.Repl. RW 2/1/2022 15 15 15
08 10 Rd.No.: 70390 0.10 CN 7/1/2022 RAP 245 35 280 280
DCE 2/21
From: MP 6.9 To: MP 7.0
Clear Zone Project
Total 2022 Project Cost $300,000 TOTALS HSIP 250 50 300P 20 ��280
Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP- Federal Lands Access Program
PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and
RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program State Emergency Management funds
CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board
Page 2 of 7
Six Year Transportation Improvement Program
Agency: Mason County 9/28/2021 From 2022 to 2027
Co.No.: 13 Co.Name: Mason County Hearing Date: Adoption Date:
City No. --- MPO/RTPO: Peninsula Amend Date: Resolution No.:
Project Identification Proiect Costs in Thousands of Dollars Federally Funded
m A. Federal Aid No. B. Bridge No. CDFund Source Information Expenditure Schedule Projects Only
`o_ a C. Project Title d ti ar Federal Funding
R/NI
a z D. Street/Road Name of Number o L Phase Federal Federal State 4th Envir Type Required
u- E. Beginning MP or road-Ending MP or road o n- EL Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Date
F. Describe Work to be Done ~ (mm/d Code Phase Source Funds Funds Funds I 6th mm/
1 3 6 8 9 10 11 12 13 1 14 1 15 161 17 18 19 20 21
CRP PE 1/1/2022 200 200 200 200
Belfair Connector-Log Yard Road E RW 10/1/2022 50 50 50 100
16 Rd.No.: CN
From: SR3 To: Belfair Freight Corrido
Design for new construction
Total 2021 Project Cost $250,000 TOTALS 250 250 250 300
CRP 2019 PE 6/1/2022 50 50 50
Belfair Connector-Romance Hill RW 7/1/2022 50 50 50
09 17 Rd.No.: 86500 CN
From: SR 3 To: Belfair Freight Corrido
Design for new construction
Total 2022 Project Cost $100,000 TOTALS 100 100 100
PE 1/1/2022 FbD 10 10 10
Skokomish Valley Road Reconstruction RW 1/2/2022
08 18 Rd.No..41640 0.40 CN 3/1/2023 FLAP 1600 1600 1600 TBD
From: MP 3.8 To: MP 4.6
Road reconstruction partnerw/Mason Cons Dist$8M total project cost
Total 2022 Project Cost $1,610,000 TOTALS 1610 1610 10 1600
CRP 2011 PE 1/1/2022 RATA 34 6 40 40
North Island Drive Culvert Replacement RW 5/2/2022 20
Rd.No.: 39630-North Island Drive CN 7/15/2023 RATA 720
07 19 From: MP 3.46 To: MP 3.47 0.01
Replace existing culvert with a new structure
Total 2022 Project Cost $40,000 TOTALS 34 6 40 60 720
CRP 2021 PE 3/1/2022 RATA 5 5 10
North Shore Road-Great Bend Culvert Replacement RW 5/2/2022 15 15 15
08 20 Rd.No.: 70390 0.10 CN 7/1/2022 RATA 245 35 280 280
From: MP 16.6 To: MP 16.7
Replace existing culvert with a new structure
Total 2022 Project Cost $300,000 TOTALS 250 50 300 305
Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP- Federal Lands Access Program
PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and
R -Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program State Emergency Management funds
CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board
Page 4 of 7
Six Year Transportation Improvement Program
Agency: Mason County 9/28/2021 From 2022 to 2027
Co.No.: 13 Co.Name: Mason County Hearing Date: Adoption Date:
City No. --- MPO/RTPO: Peninsula Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
M A. Federal Aid No. B. Bridge No. to Fund Source Information Expenditure Schedule Projects Only
o E C. Project Title di- mrrVdd/yy)
Federal Fundin R/1N
a D. Street/Road Name of Number JPhase Federal Federal State 4th Required
L Z E. Beginning MP or road-Ending MP or road o Start Fund Cost by Fund State Local Total 1 st 2nd 3rd thru Envir Type Date
F. Describe Work to be Done ~ Code Phase Source Funds Funds Funds I 6th mm/
1 3 6 8 9 10 11 12 1 13 1 14 1 15 16 171 18 191 20 21
CRP 2020 PE 3/1/2022 RATA 120 120 240
Old Belfair Hwy RW 5/1/2023 100 100 100
08 21 Rd.No.: 98250 0.40 CN 4/1/2024 RATA 1080 132 1212 1432
From: MP 1.2 To: MP 1.6
3R Improvement-Resurfacing,Restoration and Rehabilitation
Total 2022 Project Cost $1,432,000 TOTALS 1200 232 1432 340 1432
Trails Road Alternate Route-Rasor Road PE
Rd.No.62310 RW 9/3/2022 150 150 150
22 CN
From: MP. To: MP.
ROW acquisition
Total 2022 Project Cost $150,000 TOTALS 150 150 150
WSDOT/County Intersection Feasability Study PE 7/1/2022 40 40
Johns Prairie/SR3:Clifton,Old Belfair Hwy/SR300:N.Bay Rd/SR3 RW
07 23 Rd.No.: 0.10 CN
From: MP To: MP
Feasability Study
Total 2022 Project Cost $40,000 TOTALS 40 40
CRP PE 6/1/2022 HSiIP 49 49 49
County Safety Program-Guardrail Bridge Retrofit RW 8/1/2022 HSiIP 13 13 13
07 24 Rd.No.: varies 0.12 CN 2/1/2023 HSiIP 323 323 323
From: MP To:
Add/upgrade bridge rail and guardrail
Total 2022 Project Cost $385,000 TOTALS 385 385 62 323
CRP PE 6/1/2022 HSilP 73 73 73
County Safety Program-Horizontal Curve Analysis-Data Improveme RW 9/1/2022 HSiIP
07 25 Rd.No.: varies 0.12 CN 11/1/2022 HSiIP
From: MP To:
Collect curve data county wide
Total 2022 Project Cost $73,000 ITOTALS 73 731 1 73
Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP- Federal Lands Access Program
PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and
RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program State Emergency Management funds
CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board
Page 5 of 7
Six Year Transportation Improvement Program
Agency: Mason County 9/28/2021 From 2022 to 2027
Co.No.: 13 Co.Name: Mason County Hearing Date: Adoption Date:
City No. --- MPO/RTPO: Peninsula Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
m A. Federal Aid No. B. Bridge No. :5 Fund Source Information Expenditure Schedule Projects Only
o c a C. Project Title a ti d Fedetu z
R/W
a , D. StreettRoad Name of Number J o Phase FederaState 4th Envir Type Required
U- Z E. Beginning MP or road-Ending MP or road o o_o_ Start FundFund State Local Total 1st 2nd 3rd thru Date
F. Describe Work to be Done mmldd! CodeSource Funds Funds Funds 6th mm/1 3 6 8 9 1012 13 14 15 16 171 181 19 20 21
CRP PE 6/1/2022 HSiIP 126 126 73
County Safety Program-Sign Post Reflective Panels RW 11/1/2022 HSiIP 13 13 13
07 26 Rd.No.: varies 0.12 CN 4/1/2023 HSiIP 373 373 373
From: MP To:
Upgrade Signing with reflectorized sign posts panels
Total 2022 Project Cost $512,000 TOTALS 512 512 86 373
PE RAP 36.9 4.1 41 41
Shelton Valley Culvert WINTER CREEK RW 10 10 1 10
07 27 Rd.No.: 05930 0.12 CN 455.4 50.6 506 506
From: MP 1.94 To: 2.06
Replace existing culvert with new structure(winter creek)
Total 2022 Project Cost $557,000 TOTALS 492.3 64.7 557 557
PE 1/1/2025 400
Trails Road Realignment RW 10/1/2025 50
07 28 Rd.No.:62310 0.40 CN 4/1/2026
From: MP 0.5 To: MP 1.6
Curve Realignment
Total 2022 Project Cost TOTALS 450
PE 6/1/2023 210
Log Yard Road W Freight Upgrade RW 7/1/2024 50
29
CN 4/1/2025 1325
--
3R Improvement-Resurfacing,Restoration and Rehabilitation
Total 2022 Project Cost TOTALS 1585
Mason Benson Intersection Safety PE 6/1/2021 40
RW 10
Rd.No.63010 CN 300
30 From:MP 2.5 To:MP 2.6 0.10
Improve sight distance
Total 2022 Project Cost TOTALS 1 1 350
Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP- Federal Lands Access Program
PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and
RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program State Emergency Management funds
CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board
Page 6 of 7
Six Year Transportation Improvement Program
Agency: Mason County 9/28/2021 From 2022 to 2027
Co.No.: 13 Co.Name: Mason County Hearing Date: Adoption Date:
City No. --- MPO/RTPO: Peninsula Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
m A. Federal Aid No. B. Bridge No. �o Fund Source Information Expenditure Schedule Projects Only
o a C. Project Title ar tS Federal Fundin R/W
—a E D. StreetlRoad Name of Number r� o= Phase Federal Federal State 4th Envir Type Required
U- E. Beginning MP or road-Ending MP or road s n o Start Fund Cost by Fund State Local Total 1 st 2nd 3rd thru Date
F. Describe Work to be Done mm/ddlyy Code Phase Source Funds Funds Funds I 6th mm/
1 3 6 8 9 10 11 12 1 13 1 14 15 16 171 18 19 20 21
PE 6/1/2021 120
Frieght Corridor Trail Multimodal trail RW
31 --- CN
3R Improvement-Resurfacing,Restoration and Rehabilitation
Total 2022 Project Cost TOTALS 120
TOTALS 25.78 6086.11 4542.8 2298.1 6840.906 4424 8687 876 3242
Future Considerations/Wishlist
"Completion of Trails road Alternate Route-Rasor Road in phases Log Yard Port of Bremerton Industrial Loop Connectivity Planning
Cloquallum Road MP 4.6 to 5.2 curve realignments Gravel Road Conversions
Cloquallum Road MP 6.6 to 7.2 widening
Shelton Matlock Road MP 15.36 to 16.5 realign pave shoulders
Johns Prairie Road add paved shoulders RR tracks to old capital hill rd Eells Hill Road
Guardrail upgrades-Brockdale,McReavy,and Johns Prairie North Shore Road
Terrace Blvd Road and Hwy 101 intersection-partner project with WSDOT Webb Road
Brockdale and Island Lake Road intersection-partner project with City of Shelton
Illumination intersections county wide
Union Boat Launch Resurfacing
Trail near Roessel Road
New Roads Consideration
McEwan Prairie to Brockdale 101 connection
Johns Prairie and Hwy 3 connection
Connection between Cloquallum and City Center exit
Page 7 of 7