Loading...
HomeMy WebLinkAboutBLD2020-00656 Final ReRoof - BLD Permit / Conditions - 7/2/2020 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us B :ADDRESS: 00656 REROOF- RESIDENTIAL PRSCRIPTION: TEAR OFF AND RE-ROOF 396 SQUARES ISSUED: 06/26/2020 CON ROOFING EXPIRES: 12123/2020 SIT 8400 SE LYNCH RD SHELTON PARCEL: 220294290013 APPLICANT: Ascend Roofing Company, LLC OWNER: RUTHERFORD JOHN &LESLEY PO Box 156 8400 SE LYNCH RD Shelton,WA 98584-0156 SHELTON,WA 98584 360-868-2730 GENERAL CONTRACTOR'S LICENSE: ASCEND ROOFING COMPANY LLC License: ASCENRC896MA Expires: 07/26/2021 360.868.2730 FEES: Paid Due Re-Roof Residential Base Fee $120.00 $0.00 State Fee-Residential $6.50 $0.00 Technology Flat Convenience $5.00 $0.00 Fee Totals : $131.50 $0.00 REQUIRED INSPECTIONS Re-Roof-Final Inspection CONDITIONS " Insulation: IECC 101.4.3 exception#5 Roofs without insulation in the cavity and where the sheathing or insulation is exposed during re-roofing shall be insulated either above or below the sheathing. Insulation is not required for roofs where neither the sheathing nor the insulation is exposed. (Reference IECC/WSEC R101.4.3) * Single rafter joist roof replacement shall be insulated to a minimum of R-38 allowing for a minimum of one-inch continuous vented airspace above the level of insulation. Printed by:Ariane Paysse on:06/29/2020 12:26 PM Page 1 of 3 Mason County Mason County - Division of Community Development , 615 W.Alder St. Bldg. 8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us REROOF- RESIDENTIAL BLD2020-00656 " CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. " The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. " Roof Slope: IRC section R904.1 Roof slope must be indicated to ensure selected roof covering is allowed on designed pitch.. " All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. " Manufactured homes with existing insulation require L&I Permits. * Attic Ventilation: IRC section R806 Enclosed attic and rafter area shall be supplied with cross-ventilation. The net area shall not be less than 1/150 of the area of the space to be ventilated. If 50%and not more than 80% of the ventilating area is provided from the upper portion of the space to be ventilated,then 1/300 is allowed. " Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. " All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. Printed by:Arene Paysse on:06/29/2020 12:26 PM Page 2 of 3 . Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us REROOF- RESIDENTIAL BLD2020-00656 " All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. " Existing roof deck shall be insulated to a minimum of R-38 if:The roof is un-insulated or existing insulation is removed to the level of the sheathing, OR All insulation in the roof/ceiling was previously installed exterior to the sheathing or non- existent. All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. " Roof Covering: IRC section R905&907 Selected roof covering must be installed in accordance with manufacturer's specifications and IRC requirements.A drip edge shall be provided at eaves and gables of shingle roofs. FprovisioqA y that I have read and examined this application and know the same to be true and correct. of Laws and Ordinances governing this type of work will be complied with whether ein or not. The granting of a permit does not presume to give authority to violate or cancel of any other state/local law regulating construction or the performance of construction. U ) / {0 � Zfi Contractor or Autho ized Agent: 1S�.d V►NGr Date: Printed by:Ariane Paysse on:06/29/2020 12:26 PM Page 3 of 3 § 0 0 0 > m 0 -1 � m 0 q 41 > r ■ 0 0 ■ U) 0 0 E m n j. 0 ƒ f h . z m 0 w q 0 k E § $ 2 k m 0 f % _ 3 2 7 \ \ 0 , \ % 0 0 \ o k / \ . -< ƒ . § n o z k k X M k 10 D z 0 0 ' CA V) 0 0 Ez Q E Cl) 0 \ m y ƒ I r m Co \ CO) m co§ 2 0 � o 3 \ cn 3 cb 0 0 \ �OD 0 0 0 § 2 ƒ c z § / / / cn �z q CD M PQ- 0 m � ;a k CD � k m C 2 \ « CD § 0) 0 _ . o k / CD \ I i a I m m £ w 0 { \ o 2 E 5 g \ ca � @