Loading...
HomeMy WebLinkAboutBLD2019-00594 Final Quonset Hut - BLD Permit / Conditions - 3/18/2020 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us B DD2019-00594 GARAGE/ STORAGE PROJECT DESCRIPTION: CONSTRUCT A 32'X 40'QUONSET HUT ISSUED: 09/11/2019 SITE ADDRESS: 90 NE PINE CAMP RD BELFAIR EXPIRES: 03/09/2020 PARCEL: 223117600390 APPLICANT: GILBERT ET AL, DYLAN OWNER: DYLAN GILBERT ET AL 30221 8TH AVE S 30221 8TH AVE S FEDERAL WAY,WA 98003 FEDERAL WAY,WA 98003 253.224.6904 VALUATIONS: FEES: Paid Due U VB Utility, miscellaneous 1200.00 $57,360.00 State Fee-Residential $6.50 $0.00 . Planning Review Fee $240.00 $0.00 Building Permit Fee $762.02 $0.00 Plan Check Fee $495.31 $0.00 Total: $57,360.00 Totals : $1,503.83 $0.00 REQUIRED INSPECTIONS Setback Inspection Framing Inspection Footing Inspection BLD-Final Inspection Foundation Wall-Pre-Pour Inspection CONDITIONS " All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. " All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. Printed by:Genie Mcfarland on:09/11/2019 11:44 AM Page 1 of 4 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GARAGE/ STORAGE BLD2019-00594 " All property lines shall be clearly identified at the time of foundation inspection. " REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. " All surface water and potential.runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. 'NOTE if Stormwater Management option"A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. " The foundation/footing must be placed on undisturbed,firm-native soil. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site,then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. Printed by:Genie Mcfarland on:09/11/2019 11:44 AM Page 2 of 4 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GARAGE/ STORAGE BLD2019-00594 * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. * By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton.The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. the Mason Count Building Department. All The construction of the permitted project is subject to inspections by y g p construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. Printed by:Genie Mcfarland on:09/11/2019 11:44 AM Page 3 of 4 Mason County Mason County - Division of Community Development �A `-1 615 W.Alder St. Bldg. 8 w Shelton, WA 98584 360427-9670 ext 352 www.co.mason.wa.us GARAGE/ STORAGE BLD2019-00594 * Application acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. RR5 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: .-''^ Contractor or Authorized Age t: Date: Printed by:Genie Mcfarland on:09/11/2019 11:44 AM Page 4 of 4 MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 ;lr SHELTON:360ft27-9670,F_)CT 352 4 COMMUNITY SERVICES BELFAIR:360-2754467,EXT 352 Building,Planning,Envlronmenta9 Health,Community Health ELMA:360-482-5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY** To schedule an inspection call or visit httpJ/www.co.mason.wa.us/oommunt"rvices/bid-inspecdon.php Permit Number BLD2019-00594 Date Issued 09/11/2019 Issued By Project CONSTRUCT A 32'X 4V QUONSET HUT Site Address 90 NE Pine Camp Rd Applicant GILBERT ET AL,DYLAN Contractor Contractor Phone Primary Code UPC IBC,IRC,IFC,IEC,IMC,8t Type Permit Type GARAGE/STORAGE Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.** PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Q m5 _ Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porghes Foundation Stem Walls - K Other Rough-In Groundwork Plumbing Framing !)42,e$ Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building 2v Manufa tured Setbacks ` Setup Home Concrete Foot/Runners Final Other