HomeMy WebLinkAboutCOM2019-00070 Final Logo Sign - COM Permit / Conditions - 1/27/2020 Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
F
9-00070 NEW COMMERCIAL PERMIT
ESCRIPTION: SANDY'S DELI'S SHELL LOGO SIGN ISSUED: 08/19/2019
WALL MOUNT& POLE MOUNTESS: 120 NE STATE ROUTE 300 BELFAIR EXPIRES: 02/15/2020
PARCEL: 123294190110
APPLICANT: YMCK INC OWNER: YMCK INC
P O BOX 462 P O BOX 462
BELFAIR,WA 98528 BELFAIR,WA 98528
1.206.412.8562
GENERAL CONTRACTOR'S LICENSE: ESCO PACIFIC SIGNS INC License: ESCOPAS873KU
Expires: 06/05/2021
360-748-6461
VALUATIONS: FEES: Paid Due
Project Valuation (BID, 15000.00 $15,000.00 State Fee-Commercial $25.00 $0.00
ESTIMATION..) Plan Check Fee $169.63 $0.00
Building Permit Fee $260.97 $0.00
Planning-Sign review Fee $80.00 $0.00
Total: $15,000.00 Totals : $535.60 $0.00
REQUIRED INSPECTIONS
Setback Inspection Rough-Plumbing Inspection
Footing Inspection Mechanical Inspection
Foundation Wall-Pre-Pour Inspection Insulation Inspection
Shearwall Inspection BLD-Final Inspection
Framing Inspection
CONDITIONS
Printed by:Genie Mcfarland on:08/19/2019 11:40 AM
Page 1 of 3
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg. 8
Shelton,WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
NEW COMMERCIAL PERMIT COM2019-00070
The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* private road signs in accordance
assigned address and/or purchase and post r a e
Owner/Agent is responsible to post the ass g p p p 9
with Mason County Title 14.28 and 14.17.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site,then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,.
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* All property lines shall be clearly identified at the time of foundation inspection.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
Printed by:Genie Mcfarland on:08/19/2019 11:40 AM
Page 2 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg. 8
Shelton, WA 98584
- 360-427-9670 ext 352
www.co.mason.wa.us
NEW COMMERCIAL PERMIT COM2019-00070
Subject sign permit is for re-facing two freestanding signs and re-facing the fuel station canopy only.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Aut o 'zed Agent: Date:
Printed by:Genie Mcfarland on:08/19/2019 11:40 AM
Page 3 of 3
l
MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
1 SHELTON:360-427-9670,EXT 352
)' COMMUNITY SERVICES BELFAIR:360-275-4467,EXT 352
Bwldirty,Planning,Environmental Ikvlth.Cu ,.unity H-M ELMA:360-482-5269,EXT 352
www.00.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY"
To schedule an inspection call or visit http://www.co.mason.wa.us/community-servicestbid-inspecoon.php
Permit Number COM2019-OW70 Date Issued 08/19/2019 Issued By
Project SANDY'S DELI'S SHELL LOGO SIGN UPGRADE,WALL MOUNT& POLE MOUNT
Site Address 120 NE STATE ROUTE 300
Applicant YMCK INC
Contractor ESCO PACIFIC SIGNS INC
Contractor Phone 360-748-6461
Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type
Permit Type NEW COMMERCIAL PERMIT Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
"THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED"
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other