Loading...
HomeMy WebLinkAboutCOM2019-00070 Final Logo Sign - COM Permit / Conditions - 1/27/2020 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us F 9-00070 NEW COMMERCIAL PERMIT ESCRIPTION: SANDY'S DELI'S SHELL LOGO SIGN ISSUED: 08/19/2019 WALL MOUNT& POLE MOUNTESS: 120 NE STATE ROUTE 300 BELFAIR EXPIRES: 02/15/2020 PARCEL: 123294190110 APPLICANT: YMCK INC OWNER: YMCK INC P O BOX 462 P O BOX 462 BELFAIR,WA 98528 BELFAIR,WA 98528 1.206.412.8562 GENERAL CONTRACTOR'S LICENSE: ESCO PACIFIC SIGNS INC License: ESCOPAS873KU Expires: 06/05/2021 360-748-6461 VALUATIONS: FEES: Paid Due Project Valuation (BID, 15000.00 $15,000.00 State Fee-Commercial $25.00 $0.00 ESTIMATION..) Plan Check Fee $169.63 $0.00 Building Permit Fee $260.97 $0.00 Planning-Sign review Fee $80.00 $0.00 Total: $15,000.00 Totals : $535.60 $0.00 REQUIRED INSPECTIONS Setback Inspection Rough-Plumbing Inspection Footing Inspection Mechanical Inspection Foundation Wall-Pre-Pour Inspection Insulation Inspection Shearwall Inspection BLD-Final Inspection Framing Inspection CONDITIONS Printed by:Genie Mcfarland on:08/19/2019 11:40 AM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2019-00070 The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. * By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * private road signs in accordance assigned address and/or purchase and post r a e Owner/Agent is responsible to post the ass g p p p 9 with Mason County Title 14.28 and 14.17. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site,then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,. Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * All property lines shall be clearly identified at the time of foundation inspection. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. Printed by:Genie Mcfarland on:08/19/2019 11:40 AM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 - 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2019-00070 Subject sign permit is for re-facing two freestanding signs and re-facing the fuel station canopy only. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Aut o 'zed Agent: Date: Printed by:Genie Mcfarland on:08/19/2019 11:40 AM Page 3 of 3 l MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 1 SHELTON:360-427-9670,EXT 352 )' COMMUNITY SERVICES BELFAIR:360-275-4467,EXT 352 Bwldirty,Planning,Environmental Ikvlth.Cu ,.unity H-M ELMA:360-482-5269,EXT 352 www.00.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an inspection call or visit http://www.co.mason.wa.us/community-servicestbid-inspecoon.php Permit Number COM2019-OW70 Date Issued 08/19/2019 Issued By Project SANDY'S DELI'S SHELL LOGO SIGN UPGRADE,WALL MOUNT& POLE MOUNT Site Address 120 NE STATE ROUTE 300 Applicant YMCK INC Contractor ESCO PACIFIC SIGNS INC Contractor Phone 360-748-6461 Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type NEW COMMERCIAL PERMIT Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. "THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED" PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other