HomeMy WebLinkAboutBLD2019-01166 Final Solar - BLD Permit / Conditions - 10/14/2019 Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
BLD2019-01166 SOLAR PANEL-RESIDENTIAL
PROJECT DESCRIPTION: ROOF MOUNT SOLAR(GARAGE)-17.28KW ISSUED: 10/14/2019
SOLAR INSTALLTAION 48)360 AC MODULES
SITE ADDRESS: 2102 E JENSEN RD SHELTON EXPIRES: 04/11/2020
PARCEL: 321307590072
APPLICANT: TIMOTHY J&KATHLEEN WEBER OWNER: TIMOTHY J&KATHLEEN WEBER
PO BOX 28 PO BOX 28
SHELTON,WA 98584-0028 SHELTON,WA 98584-0028
CONTRACTOR: SOUTH SOUND SOLAR INC
360.352.7869
GENERAL CONTRACTOR'S LICENSE: SOUTH SOUND SOLAR INC License: SOUTHSS902N7
Expires: 08/01/2020
360.352.7869
FEES: Paid Due
Solar/PV Fee $19.00 $0.00
Final Inspection $80.00 $0.00
Solar/PV Base Fee $30.00 $0.00
State Fee-Residential $6.50 $0.00
Totals : $136.50 $0.00
REQUIRED INSPECTIONS
BLD-Final Inspection
CONDITIONS
Printed by:Ariane Paysse on:10/14/2019 11:54 AM
Page 1 of 4
i
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg. 8
Shelton, WA 98584
-- 360-427-9670 ext 352
www.co.mason.wa.us
SOLAR PANEL-RESIDENTIAL BLD2019-01166
* The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency
(ORCAA).
It is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos
containing materials have been identified and removed from the area to be demolished. Work shall not commence on an
asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B
Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
" Applicant has indicated this is a replacement unit. Prior to Mason County allowing any occupancy of the new proposed
unit, the existing unit which is on-site and is being replaced MUST be removed from the parcel.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
Printed by:Ariane Paysse on:10/14/2019 11:54 AM
Page 2 of 4
A
Mason County
Mason County - Division of Community Development
f 615 W.Alder St. Bldg. 8
` Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
SOLAR PANEL-RESIDENTIAL BLD2019-01166
* The installation of solar(thermal or photovoltaic)energy systems to provide space heating or cooling, hot water and
swimming pool heating shall conform to Chapter 23 of the International Residential Code, Chapter 14 of the International
Mechanical Code, Uniform Plumbing Code, the International Fire Code, and be shall be listed and labeled in accordance
with UL1703.
Roof mounted panels shall weigh no more than 4 Ibs per square foot. Supports for solar panels are to be installed to spread
the dead load across as many roof-framing members as needed to ensure that no point loads in excess of 50-Ibs are
created. Panels may be installed on roof assemblies with a single layer of roofing material. Roof assemblies with more than
one roofing material layer shall require an engineered analysis demonstrating that the roof will support the additional load of
the solar panel system. Attachment to the roof shall be in accordance with manufacturer specifications provided during the
inspection by the Mason County Building Inspector.
Roof mounted equipment shall comply with the International Fire Code Section 605.11, including signage and access
pathways. Roof access points shall not be located in areas where access ladders would block window or doors openings.
Not less than two-3-foot wide access pathways shall be provided from the eave to ridge.
Ground-mounted panels and modules, installation must be in accordance with the manufacturer's instructions and be
available at time of inspection.
Inverters shall be listed and labeled in accordance with UL 1741. Systems connected to the utility grid shall use inverters
listed for the utility interaction
Collectors and thermal storage units shall be listed and labeled to show manufacturer's name, model number, serial number,
collector weight, collector maximum allowable temperatures and pressures, and the type of heat transfer fluids that are
compatible with the collector.
Connections to potable water supplies shall be provided with backflow protection in accordance with the Uniform Plumbing
Code. Solar energy systems containing pressurized fluids shall be protected with a temperature and pressure relief valve
and be protected from freeze damage. Systems shall be equipped with means to limit the maximum water temperature of
the system fluid entering or exchanging heat with any pressurized vessel inside the dwelling to 180 degrees Fahrenheit.
Solar energy collectors, controls, dampers,fans, blowers and pumps shall be accessible for inspection, maintenance, repair
and replacement.The roof shall be constructed to support the loads imposed by roof-mounted solar collectors and shall be
constructed of noncombustible materials, flashed and sealed to prevent entry of water, rodents, and insects. The building
inspector may require additional information, including an engineered design, to verify that existing roof or floor construction
are adequate to support the additional load of the solar energy equipment. When required provide an engineered design for
inspection.
" All furnace installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy
code (WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth
in the WSEC and international mechanical code.
Printed by:Ariane Paysse on:10/14/2019 11:54 AM
Page 3 of 4
./ Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.masonma.us
SOLAR PANEL-RESIDENTIAL BLD2019-01166
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions f any other state/local law regula ' g construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date: lB ly
Printed by:Ariane Paysse on:10/14/2019 11:54 AM
Page 4 of 4
rn
� Y�
CN
M ECD
g
00 p M00 U
O O
v `N. U) a a
00 W
L ^J
co w
rn W
0 a
o C9 Q N
a) LL ?
gM
° 00
OD 'It
O N z0
N� °' a
ii W U J Z
J 0
CLOD N o O� w
V 0
Z 3 -r- (1) �C z Z
0 0 06 0) o
co z
o)o) E y a N
V N m N 0 U O
W U) c 0 W p
M
Q d
C'L^ F- I-
V/ W W N N
Z Q O O a 13
a s o o z m
Ln Q Q �
U
LU m \ r
w
t7o
fr
L) z o
z z wW
LLJ CL A
= O = z
CEO N Z Q
O 06 :3
i
G7 LO >- � ui
O O ~ =C14Z
0 ch O = Lu z
m M H � J V 0
a O.
VV Z w
® ~ W
U W H N ii
LU a s a O U V m