Loading...
HomeMy WebLinkAboutBLD2018-01029 Final Replacement MFG Home - BLD Permit / Conditions - 10/2/2019 Mason County MASON COUNTY Mason County Community Services COMMUNITY SERVICES 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us B DD2018-01029 MANUFACTURED HOME REPLACEMENT PROJECT DESCRIPTION: REPLACMENT MFG HOME ISSUED: 04/02/2019 SITE ADDRESS: 419 NE BEAR CREEK DEWATTO RD BELFAIR EXPIRES: 09/29/2019 PARCEL: 123093190074 APPLICANT: VALERIE GAGE OWNER: 123 XXX XX, XX 00000 LEGACY-UNKNOWN: AMERICAN HOME CENTER License: UNKNOWN Expires: 1.253.841.3600 FEES: Paid Due Planning Review Fee $240.00 $0.00 Planning Review Fee $240.00 $0.00 Planning Review Fee $240.00 $0.00 Manufact. Home Issuance Fee $264.25 $0.00 EH Minor Plan Review $110.00 $0.00 EH Minor Plan Review $110.00 $0.00 Manufact. Home Submittal Fee $264.25 $0.00 Totals : $1,468.50 $0.00 REQUIRED INSPECTIONS Setback Inspection Set-Up Inspection Footing Inspection BLD-Final Inspection CONDITIONS Printed by:Nicole Norris on:04/02/2019 11:03 AM Page 1 of 5 Mason County MASON COUNTY Mason County Community Services COMMUNITY SERVICES 615 W.Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MANUFACTURED HOME REPLACEMENT BLD2018-01029 A Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext.450. The building permit will not be"finaled" until the permit holder can show proof that the access permit from Public Works has been "finaled" and approved. X * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X The installation permit shall be displayed in clear view of the site access road. The approved site plan and other applicable instructions, including installation instructions, shall be available in this location OR placed in the location specified by WAC 296-150M-655. Support configuration shall be clearly marked in the installation instructions. X " The "approved"site plan is required to be on-site for inspection purposes. If an inspection is requested and the "approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X " REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. (IRC 2012 R905.2.8.5) X " Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X * If you are installing a manufacturing home and no longer have the installation manual for the home, you must use the instructions of the American National Standards Institute (ANSI). To order the ANSI instructions you may either get an order form from the Mason County Building Department or you can contact the Offfice of Manufacturing Housing (360)725-2800. X * ALL SURFACE WATER AND POTENTIAL RUNOFF WILL BE CONTROLLED ON SITE AND SHALL NOT ADVERSLY AFFECT ANY ADJACENT PROPERTIES NOR INCREASE THE VELOCITY FLOW ENTERING OR ABUTTING TO ANY STATE OR COUNTY CULVERTING/DITCHING SYSTEM OR ROAD WAY. X The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, FIRM-NATIVE SOIL. X Printed by:Nicole Norris on:04/02/2019 11:03 AM Page 2 of 5 Mason County MASON COUNTY Mason County Community Services COMMUNITY ITY SERVICES 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MANUFACTURED HOME REPLACEMENT BLD2018-01029 The approval of this project is subject to the recommendations and specifications outlined in the attached geotechnical report or assessment. All applicable recommendations and specifications shall be applied to the development on this site. Any deviation requires stamped written approval from the registered design professional responsible for the report/assessment, and may require special inspection by same. Structures and/or land modifications (grading, cuts,fills, etc.) required in the geotechnical report/assessment, may require a separate permit. The geotechnical report/assessment shall remain attached to the approved building plans. X Any retailer, manufacturer or contractor who installs a manufactured home warrants that the manufactured home is installed in accordance with the State Installation code, chapter 296-150M WAC. All installers hired to do installation work shall be certified manufactured home installers and shall be present to supervise the installation of all on-site work. An Installer Tag shall be posted on site giving the certification number and signature of the certified installer responsible for each major part of the installation. RCW43-63B.090 An approved Installer cerification tag shall be placed on the end of the manufactured home directly above or below the HUD certification tag or temporarily located in plain site within three of the home's front entry. There shall be one certification tag for each certified installer accounting for the.work that each installer performed or installed. certification number and signature of the certified installer responsible for each major part of the installation. WAC365-210 X The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED",they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. X " Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. X * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X * All fill dirt must be tested and compacted as noted within the suppiled geo-tech report (GE02018-00068). Compaction and testing reports must be provided to the building department for approval per to set-up inspection. X * Prior to final approval, all upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X * All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. X Printed by:Nicole Norris on:04/02/2019 11:03 AM Page 3 of 5 Mason County MASON COUNTY Mason County Community Services COMMUNVFY SERVICES 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MANUFACTURED HOME REPLACEMENT BLD2018-01029 CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X All property lines shall be clearly identified at the time of foundation inspection. X All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X * A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan"constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. X * Application acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Zoning is_RR5 X * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. X * All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X Printed by:Nicole Norris on:04/02/2019 11:03 AM Page 4 of 5 Mason County MASON COUNTY Mason County Community Services COMMUNITY SERVICES 615 W.Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wams MANUFACTURED HOME REPLACEMENT BLD2018-01029 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any of er state/local law regulating construction or the performance of construction. Issued By: —A C2;:K:�7 Contractor or Authorized Agent: ' --- Date:775 �� Printed by:Nicole Norris on:04/02/2019 11:03 AM Page 5 of 5 E \=\ q q m /° D m ° z z z m m/ � � 9 » > r n n 0 \ % \x\.«. & §2 o o / m ; fg f > z m m ® E \\ z 2 > o v 2 in p e \ y } z / z y » CD \ \ \ m / \ / / m 2 z � o § I .m 0 cn M k k _0 m � X 7 y z n / 0 \ 0- CID H coCD §_ \ m k / p ± M \ 7 7 m / � 3 � cn % � § j G q � 7 / 0 \ � 0 > m . � = X /m � z \ \ \ 2 % / 2 \ 7 w J 0 \ § § § / z 01 > \ z \ m / \ � 0 o ƒ 3 _ m S / c � 2 2 m p » a \ I / � � 2 § 3 m z z \ m m > n / ) \ \ (A \ \ 2 \ c