Loading...
HomeMy WebLinkAboutBLD2020-00759 - BLD Plot / Site Plans - 5/11/202130x30x12 PAD W/ (3) #4 EACH WAY 18x18x12 PAD W/ (2) #4 EACH WAY 6x6 PT POST W/ ABU66 B MITER J❑ISTS W/ LCE4 42x42x12 PAD W/ (4) #4 EACH WAY 15' 6x6 PT POST W/ ABU66 BASE x12" TREATED GLULAM FLUSH W/ HUC610 HANGER (3) 2x12 6x6 PT POST W/ ABU66 BASE 5Y"x12" TREATED GLULAM FLUSH W/ HUC610 HANGER 24x24x10 PAD W/ (2) #4 EACH WAY (TYP IN CRAWL) NOTE: PLACE VENT WITHIN 3' OF FOUNDATION CORNER UNLESS CONFLICTING WITH STRUCTURE IRC R408.2 FOUNDATION VENTILATION: 6"x16" SCREENED FOUNDATION VENTS = .67 SQ. FT. 1330/150 = 8.87 SQ. FT. VENTILATION -OR-- 13 VENTS (13 VENTS SHOWN) 1/4'=1'-0' 5/-6" rT L_J STHD14 STHD14 84x42x12 PAD W/ (4) #4 EACH WAY 30x30x12 PAD W/ (3) #4 EACH WAY /6x6 PT POST W/ ABU66 BASE 53 x12" TREATED GLULAM FLUSH W/ HUC610 HANGER PT J❑ISTS @ 16" O.C. 2x12 PT LEI3GEP W LED5ERLOK @ 7" 0 L_J CRAWLSPACE rz-6 MIL BLACK PLASTIC VAPOR BARRIER 4'-6" r L L _ J 4x8 BEAM (TYP) 19' ALL PONY WALLS TO HAVE SAME SHEAR WALL NAILING AS WALL ABOVE 30' VIDE CRAWL ACCESS VENT (TYP) 2x4 PONY WALL (AS NEEDED) %"r A,B, @ 48'o/c 2'x6' PT PLATE FINISH GRADE NOTES! 1, DETAIL 1 IS APPROVED FOR WALLS WITH EQUAL BACKFILL OR LESS THAN 48' OF UNBALANCED BACKFILL 2. USE 24' WIDE F❑❑TING FOR WALLS GREATER THAN 4' BUT LESS THAN 6' 3, USE 30' WIDE F❑❑TING FOR WALLS GREATER THAN 6' BUT LESS THAN 8'. 4, 24" AND 30' F❑❑TINGS SHALL HAVE (3) #4 C❑NTINU❑US #4 H❑RIZ, @ 18'o/c #4 VERT, @ 18'o/c (ALT HOOK) - ,,2)#4 IN FTG, FINISH GRADE 1-TYDICAL ECUNDATION 74'=1'-0" 132' MAX 2'xi0' PT LEDGER WEDGE @ 8"o/c (STAGGERED) FLOOR J❑ISTS 18' MIN, 2-3ASEME 3'4'=1'-0' #5 VERT, @ 8'o/c #4 H❑RIZ, @ 18"o/c - 48' MAX BACKFILL PRI❑R TO COMPLETION OF FLOOR DIAPHRAGM #5 48'L @ 8'o/c 12' #4 @ 8'o/c #4 @ 16'o/c 4' PERF PIPE IN DRAIN ROCK WRAPPED IN FILTER FABRIC �1T RETAI\I\G WALL SCAI...E: AS SHOWN DATE: Oct 2020 DRAWING NUMBER. i7S St£TI NaOwfN ON1md23a OZOZ 110 :3.Lda NMOHS SV : '-1\OS' 2453 Bethel Avenue, P.O. Box 637, Port Orchard, WA 98366 (360) 895-2350 or (360) 876-2284 td CD ono N 00 0 Q3.. Ld3JJd Q3AO2Iddd n n m N r iJ Q3['.JIS3Q tJ b -4 N-3 �(lNnbd.3q SNI ��� A/003 Nos p, WO c-1.344.3,473(L OS ��ds 7d /2. S3QOJ 31VIS NOIWNIHSVM IN3NN(1JTIV133W ism co X (d),I) 'J'❑ 119T 7 SISI❑f OTX2— '3'0 MVTd ONII"VIId ?IOOZd MIVIN - I o X o (HSi111_;) TX.b XXXX KXX>O( ,,X,X }-XXX',xxxvcxoXKXXX,X AXXXXX , Q 2Q `I�yM �NI21d3g 1. L ri HA /( N91 8 SISI❑f Id 21X2 '3'0 /M NL <J3❑G31 7 )101Z13❑Q311 Id 2tix2 � at d1n1D „ZT '<„lib CtTXt T11Q i1 .:r wv-n-ip G31V3ell NZTX„2/jS d'd3 933V /M 1S❑d id 9x9 dVJ 933V /M IS❑d Id 9x9 _ _ _ _ `. NV1ln19 QIl'd3Jl „2TX„2!S Vlb'1n1D QEldell „2IX„2AS / dVJ 93V /M IS❑d Id 9X9 dVJ 933V /M IS❑d id 9x9 CHANGES SUBMIT CHANGES FOR APPROVAL PRIOR TO PERFORMING WORK "RD 2626 --E:41f5' 695 7 Oal_ -De Gt. Rev).sict ?1fCe( t zzo62—&-o- oso (z_ MUST MEET ALL CURRENT WASHINGTON STATE CODES REVISED J.EC_-DATE ( ST COMPLY WITH PERMIT CONDITIONS )vf:D •,:,N1 BUILDING INSPECTOR S SUBJECT TO APPROVAL DATE Dour attached to approved plans: Site Plan Fien review checklist: Pages EngiCicefing: Y N Lateral Vertical p9ges E.12.4A4 CitteS ( F- r(A-k_Cs z_n THESE PLANS MUST BE ON THE JOB SITE FOR INSPECTION