HomeMy WebLinkAboutCOM2019-00085 ReRoof - COM Permit / Conditions - 8/15/2019 Mason County Mason County - Division of Community Development , 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us FPROJECT -00085 REROOF- COMMERCIAL SCRIPTION: REROOF ON MCCLENDONS ISSUED: 08/15/2019 SS: 31 NE STATE ROUTE 300 STE 104 BELFAIR EXPIRES: 09/12/2021 PARCEL: 123294200190 APPLICANT: DM BELFAIR INVESTMENTS LLC OWNER: DM BELFAIR INVESTMENTS LLC 51 NEST RT 300 51 NE ST RT 300 BELFAIR,WA 98528 BELFAIR,WA98528 GENERAL CONTRACTOR'S LICENSE: CONTRACTORS ROOF SERVICE License: CONTRRS035138 6406 43 RD AVE CT NWGIG HARBOR,WA 98335 Expires: 01/29/2023 858-3044 FEES: Paid Due State Fee-Commercial $25.00 $0.00 Re-Roof Commercial Base Fee $190.00 $0.00 Totals : $215.00 $0.00 REQUIRED INSPECTIONS BLD-Final Inspection Progress Inspection Progress Inspection CONDITIONS " Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. Printed by:Corey Bennett on:08/19/2021 03:47 PM Page 1 of 5 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us REROOF- COMMERCIAL COM2019-00085 Adopted IECC/Washington State Energy Code Compliance has been approved as follows: Heat Type: Electric or other than electric, Compliance Method: Prescriptive option Marine-4C, Window(Max U- Factor):0.30, Skylight(Max U-Factor):0.50, Doors (Type/Max U-Factor):0.30 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation min. R-49, Vault Insulation R-38, and Slab Insulation R-10. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * A permanent certificate, completed by the builder or registered design professional, shall be posted on a wall in the space where the furnace is located, a utility room, or an approved location inside the building. When located on the elctrical panel, the certificate shall not cover or obstruct the visibility of the circuit directory label, service disconnect labek, or toher reqyired Iabels.The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof, walls, foundation (slab, basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the solar heat gain coefficient (SHGC)of fenestration. Where there is more than one value for each component, the certificate shall list the value covering the largest area. The certificate shall list the type and efficiency of heating, cooling, and service water heating equipment, duct leakage rates including test conditions as specified in WSEC Section R401.3 & R402.4.1.2, and air leakage results if a blower door test was conducted. Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 5 air changes per hour when tested with a blower door in accordanve with IECC/.WSEC Section R402.4.1.2. The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution panel. Air leakage testing is not required for additions less than 500 square feet. Reference IECC/WSEC R402.4.1.2. Compliance certificates are available online at the WSU Energy program website titled, "WSEC 2015 Certificate"and are available in '/or'h sheets. The Mason County Permit Center will also have some available. * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. Printed by:Corey Bennett on:08/19/2021 03:47 PM Page 2 of 5 Mason County Mason County - Division of Community Development z 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us REROOF- COMMERCIAL COM2019-00085 * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * All property lines shall be clearly identified at the time of foundation inspection. * When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. * When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at(206)357-2620, ext. 630. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culve rti ng/d itching system or road way. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. Printed by:Corey Bennett on:08/19/2021 03:47 PM Page 3 of 5 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us REROOF- COMMERCIAL COM2019-00085 * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * A minimum of 75 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in accordance with IECC/WSEC Section R404.1. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * The foundation/footing must be placed on undisturbed,firm-native soil. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. * Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer specifications and in accordance with IRC Section R315. Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level of the dwelling. EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations (including addition or alteration of fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or created. * Roof Covering: IRC section R905&907 Selected roof covering must be installed in accordance with manufacturer's specifications and IRC requirements.A drip edge shall be provided at eaves and gables of shingle roofs. * Insulation: IECC 101.4.3 exception#5 Roofs without insulation in the cavity and where the sheathing or insulation is exposed during re-roofing shall be insulated either above or below the sheathing. Insulation is not required for roofs where neither the sheathing nor the insulation is exposed. (Reference IECC/WSEC R101.4.3) Printed by:Corey Bennett on:08/19/2021 03:47 PM Page 4 of 5 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us REROOF- COMMERCIAL COM2019-00085 " Attic Ventilation: IRC section R806 Enclosed attic and rafter area shall be supplied with cross-ventilation. The net area shall not be less than 1/150 of the area of the space to be ventilated. If 50% and not more than 80% of the ventilating area is provided from the upper portion of the space to be ventilated, then 1/300 is allowed. * Roof Slope: IRC section R904.1 Roof slope must be indicated to ensure selected roof covering is allowed on designed pitch. * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Corey Bennett on:08/19/2021 03:47 PM Page 5 of 5 0 n O T G z z Z ; —I m 0 3 N d r _ n n O O C) CD m X o z m o W O Z Z W � N A D C)n W o z cn < pro z � O m CA c U) -n Z D co < `+ m m C� n 3 r D D Zv v v v X X y v /� O O Z N CO 0 0 WC Mu C rn cn v D O (/) 0) z m 1 DTI CA m cn 0 o No0N n �o y va0 H m o z 0 C) 0 to n CD =3 CD ? = Z � CD 3 v M Z :l7 wCD WOG m ch o -1 p m N? z O � D z m 0 v n � cn 00 0 O M M z M � w O o z C/) --j a m m v -o co _ = m O r m m D o 00 cyl 00 D 3 w 00 cri o cfl N 00 cop RECENED A MASON COUNTY AUG 1 5 Mt 1g COM V� I -�W R� COMMUNITY SERVICES DEPARTMENT = Mason County Bldg. 8, 615 W.Alder Street Shelton, WA 98584 www.co.mason.wa.us (360)427-9670 ext.352 Belfair(360)275-4467 Elma(360)482-5269 ISM NON-RESIDENTIAL RE-ROOF APPLICATION Roofing Sq ft area «t 0d0 Type of Roofing to be Applied 0.0V 0 M I l TPO Number of existing layers Roof Pitch: Tt ` Tear off: X Yes _No Use of building OhOWN i1 Construction Type: *00d Roofing Classification (Occupancy classification) (wood,steel frame,masonry etc.) ** See note below (A,B or Q Include manufacture specifications verifying materials meet roofing classification. B&C roofing classifications require site plan drawn to scale. Will insulation be installed?_Yes Y No Existing Insulation, describe : IYtSIdt "a til C," S.PUCe/ Existing roofs shall be insulated to the requirements of R-38 if electric heat, R-30 all others, IF: a3he roof is uninsulated or insulation is removed to the level of the sheathing or b.All insulation in the roof/ceiling was previously installed exterior to the sheathing or nonexistent. Roof ventilation, describe : +Sfiiinu oAr�Ss/ inar>?ss Roof deck&insulation Inspection required before new roofing materials can be applied Name of Business: N Ot&f(1nV8tr laV T Subject Property Address: �5I t� �t ROyty ho Assessors parcel number(s)• 121 . 42-W P 0 (Address and parcel number required for all applications) Owner: �U a�fai✓IwAMW 11, UG ,I Mailing address: PO lv0� 211 City: I"i Island State: Wit Zip: a gel b"J Phone (1�792 ) LQ49-44 5a FAX ( ) E-Mail: 6yiSkuYIIGmdwarc.aow —Expedited permits may be obtained for class A roofing I hereby authorize my representative(s)to inspect my property Monday-Friday between the hours of 8 a.m. and 5 p.m.during th' ermit applicat on process for purposes of verifying site conditions. Owner: Date: 0 f 1.41 1`i .a�0014 cocy� MASON COUNTY COMMUNITY SERVICES ° PERMIT ASSISTANCE CENTER: Permit No: •BUILDING •PLANNING •FIRE MARSHAL 615 W.Alder St-Shelton,WA 98584 C� Phone Shelton:(360)427-9670 ext.352 • Fax:(360)427-7798 Phone Belfair.(360)275-4467• Phone Elma:(360)482-5269 4110 BUILDING PERMIT APPLICATION 61S (// % O PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATION: ��cy I-" rk eet NAME: it vas �S� U.0 NAME:�ntractor� Of SIYUlct, lnc. tr MAIL G ADDRE_$S: MAILING ADDRESS: CITY: �{ STATEAA ZIP: CITY: STATE: WA ZIP: PHONE#1:QGj -U VI.4 UV34 PHONE: ' CELL: PHONE#2: EMAIL: hi(In Q M Y EMAIL d Wt A CS.09 m L&I REG#C MTt2RS ONE_EXP. / CONTACT PERSON: OWNER❑ CONTRACTOR 9 OTHER❑ NAME:Contlpct0rs koO Service, InC- MAILING ADD SS: U4011 w vB Lt CITY: 1/Or STATE: A ZIP: g;1-17s PHONE: • 0! CELL: EMAIL: YUO I PARCEL INFORMATION: PARCEL NUMBER(12 Digit Number) p919• L V q o ZONING LEGAL DESCRIPTION(Abbreviated) FIRE DISTRICT SITE ADDRESS a, NE a RO(AbfiNO _ CITY P9fatr DIRECTIONS TO SITE ADDRESS IS THE PROJECT WITHIN 300 FT OF SLOPE(S)GREATER THAN 14%: YES❑ NO k IS PROPERTY WITHIN 200 FT: (Check all that apply): SALTWATER❑ LAKE❑ RIVER/CREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF❑p S,TRrEAM❑ TYPE OF WORK: NEW ❑ ADDITION ❑ ALTERATION 1 REPAIR❑ OTHER � 1tlrUVT USE OF STRUCTURE(Residence,Garage,Commercial Bldg,Etc.) N"A I MA I IS USE: PRIMARY N SEASONAL❑ NUMBER OF BEDROOMS NUMBER OF BATHROOMS � i HEATED STRUCTURE? YES(Whole Bldg)❑ YES(Part[s]of Bldg)❑ NO❑ kk DESCRIBE WORK 9IS Y rV►te AVICAIN 0[11110. IMsfian r '0 P 0-0(pOlYt(j aluation/ProjectBidAmount:$ _ ) SQU E F OTAGE: 1ST FLOOR sq.ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.ft. BASEMENT sq.ft. DECK sq.ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq.ft. GARAGE sq.ft. Attached❑ Detached❑ CARPORT sq.ft. Attached❑ Detached❑ MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED* MAKE MODEL YEAR LENGTH WIDTH BEDROOMS BATHS SERIAL NUMBER OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.I declare that I am the owner and I further declare that I am entitled to receive this permit and to do the work as proposed.I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project. The owner or legal representative,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERM ICAT N OF 180 DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON COUNTY CODE 14.08.42) X- Signature of OWNER(Must be signed by the OWNER) Date DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL PERMIT SPECIALISTS ntake: Tanner: pproved&Readv for Pick-Up: Visituson-line: http://www.co.mason.wa.us/community_dev/ Rev.127/2016 by JBN Jeff Rankin From: Erica Lee <erica.lee@gaf.com> Sent: Thursday,August 15, 2019 8:25 AM To: Jeff Rankin Subject: UL Class A SINGLE PLY MEMBRANE ROOFING SYSTEMS (TPO) Class A, - Mechanically Fastened 2. Deck: NC Incline: 2-1/2 Insulation (Optional, see note):—Any UL Classified, any thickness. Barrier Board (Optional, see note):— Minimum 1/2-in. thick gypsum board or minimum 1/4-in. thick Georgia-Pacific Gypsum LLC "DensDeck® Roofboard" or "DensDeck® Prime Roofboard" or "DensDeck® DuraGuardT"^ Roofboard" or minimum 1/4-in. thick United States Gypsum Co. "SECUROCK® Roof Board" (Type FRX-G)" or "SECUROCK® Glass-Mat Roof Board" (Type SGMRX). Membrane: — "EverGuard® TPO" 45-mil to 60-mil or "EverGuard Extreme® TPO" 50-mil to 60-mil, mechanically fastened. Note:—A Barrier Board is required when insulation is present. *1/2-in. thick (minimum) gypsum board or 1/4-in. thick (minimum) Georgia-Pacific Gypsum LLC "DensDeck® Roofboard" or "DensDeck® Prime Roofboard" or "DensDeck® DuraGuard'" Roofboard" or 1/4-in.thick (minimum) United States Gypsum Co. "SECUROCK® Roof Board" (Type FRX-G) or "SECUROCK® Glass-Mat Roof Board" (Type SGMRX) may be used in any existing noncombustible deck Classification. When this is done, the resulting roofing system is acceptable for use over combustible (15/32-in.thick minimum) roof decks. However,the butt joints in the gypsum board and Georgia-Pacific Gypsum LLC "DensDeckn Roofboard" or°DensDeckn Prime Roofboard" or "DensDeck® DuraGuardT"^ Roofboard" are to offset a minimum of 6-in.with the buttjoints in the roof deck. If polystyrene is part of the roof system, it must be placed below the overlayment board. 1/4-in. thick (minimum) "SECUROCK® Roof Board" (Type FRX-G) and "SECUROCK® Glass-Mat Roof Board" (Type SGMRX) are limited to a maximum 3:12 slope when used over a combustible deck in a system with any UL Classified insulation except polystyrene. Erica Lee Tech Support Representative 2901 Turtle Creek Dr. Port Arthur, TX 77642 800-766-3411 Ext. 1468 ' We protect what rna tens most" i 12 0' . e p 4 - g I S r3 ,. - n / l not fF IFAW �e, T l —L: y 00 —.Of - _ MOD L � m a dLI10 } = i E, rea us IL t of o y d e ., RW rMit MOM s 4z 0 se a 1 McClendons Hardware • • Drawn By:JLR 11 1• Aerial Site Plan EverGuarde System Pledge" Roof Guarantee (COMTS704) Updated: 3/14 Quality You Can Trust...From North America's Largest Roofing Manufacturer!' .�'� � "" /�' � `� �i.ti i ./r- �"\ram- ✓""✓�" r` ,'"=i✓>=�a:/`�z�,�'``^+ ( ,`9''� •'»,�y .�;. -�"'-%<�.� '�Za..a�l J ��c�+3 ct�� <, r,,; P �}vah.yY f a s r.*a as s�'*{ a !a;'i4y+�, a ti7 Y �'. `�O 'l�. \'.:; r5J',. a� a t ra s rya� v a � + Y+T ���- ' ryz��iT a.: y s s t Act ,M EverGuard® SYSTEM PLEDGE ROOF GUARANTEE I '' OWNER: .._....._____.PERIOD OF COVERAGE: YEARS NAME AND TYPE OF BUILDING: '�ya ADDRESS OF BUILDING: ROOF SPECIFICATION: AREA OF ROOF: SQUARES »s � _ APPLIED BY. DATE OF COMPLETION: GUARANTEE EXPIRATION DATE: THE GUARANTEE/SOLE AND EXCLUSIVE REMEDY GAF guarantees h,you,the original owner of the building described above,that GAF will provide'Edge To Edge'protection by repairing leaks through the GAf roofing membrane,liquictapplied membrane or cowing,base Bashing,high wall wolerprcefin flashing insulation,expansion ."I covers,preAashod accessories,and metal fleshings used by the contractor of record that mee15MACNA:tandords(the'GAF floating Materials")resulting , from a manufacturing defect,ordinary wear and tear,or workmanship in optg the GAF Roofing Materials.GAF's MAXIMUM LIABILITY under this .e. guarantee shall not exceed in the aggregate over the life of this guarantee more than$ per 1 DO square feet of roof area.Leaks caused by any materials other than those listed above,such as the real deck,non-GAF insulation,or any other materials used in the construction of the roof system,ore =u not covered. GUARANTEE PERIOD!( This guarantee ends on the expiration date listed above.NOTE:Lexsuco"and uncoated M-Curb"Floshings are covered by this guarantee only for the first ten years. OWNER RESPONSIBILITIES , ,aksib- Notification of Leaks V '' In the u event of a took through the GAF Roofing Materials,You MUST make sure that GAF is notified directly about the leak,in writing,within 90 f days by—.if(preferred)at guamnteel-1,09of.can or by postal mail to GAF Guarantee Services,1361 Alps Road,Bldg.11-1,Wayne,New Jersey ve 07470,.r GAF will ha no responsibility for making repars.NOTE:The roofing contractor is NOT an agent of GAF;notice to the coo Ware, contractor is .g NOT notice to GAF. By notifying GAF you authorize GAF to investigate the cause of the lack.If the investigation reveals that the leak is not covered by this guarantee, you agree to pay on investigation cost of$500.This guoronlee will be cancelled if you fail to pay this cast within 30 days of receipt of an invoice for it. Preventative Maintenance and Repairs `rye A.You must perform regular inspections and maintenance and keep records of this work. B.To keep this guarantee in affect,you must repair any conditions in the building structure or roofing system that are not covered by this guarantee but that GAF concludes may be threatening the imegrity of the GAF Roofing Materials(e.g.,porous walls allowing water envy in the roofing system). C.You may make temporary repairs to minimize damage to the building or its contents in an emergency,at your sole expense.Thaw repairs will not result in cancellation of the guarantee m long as they are reasonable and customary and do net result in permanent damage to the GAF Roofing Materials. D.Any equipment or material that impedes any inspection or repair must be removed at your expense so that GAF can perform inspections or repairs. EXCLUSIONS FROM COVERAGE ' (e.g.,items that arc not"ordinary wear and tear"or am beyond GAF s control) z This guarantee does NOT cover conditions other than kooks.This guarantee also does NOT cover leaks caused by any of the following; 1.Inadequate roof maintenance,the]is,the failure to follow the Scheduled A.Traffic of any notum on the roof unless using GAF walkways applied Maintenance Checklists provided with this gueranlee (extra copies in accordance with GAN published application instructions. available by calling Guarantee Services al 1.800ROOF-41 11. S.Blislers in the GAF Roahng Materials that have not resulted in leeks unless 2.Unusual weather conditions or natural disasters including, but not the blister is in a seam and may affect the watertight integrity of the GAF limited to,windstorms,hail,floods,hurricanes,lightning,lomodos,and Roofing Materials. earthgvokes,unless specifically covered under this guarantee 6.Changes in the use of the building or any repairs,modifications,or ` 3.Damage to the roof constructed of the GAF Roofing Moterials due to: additions to the GAF Roofing Materials after the roof is completed,unless (a)movement or cracking of the roof deck at building,(b)improper approved in writing by GAF. installation or failure of any n,, GAF insulation or materials; (c) 7.Exppoosure to sustained highaemperature conditions;however,for systems infiltration or condensation of moisture through or around the wells, ulilizing EverGuard Extreme*TPO membrane,exposure in excess of copings,building structure,or surrounding materials except where high 195°F. wall GAF waterproofing flashings are installed;(d)chemical attack an B.Any condition(e.g.,base flashing height or leak of counter Rushing)that the membrane,including,but not limited to,exposure to grease or oil;(e) is not in accordance with GAF's pu fished application instructions or the failure of wood trailers to remain attached to the structure;(1)moisture any deviation or modification from any published specification,unless ,L migration from the building interior or any Its component other than specifically authorized by a GAF Field Services Massager or Director the GAF Roofng Ma erials;tar(9)use o materials that are mcompolible in writing. with the GAF Roofing M.ieriols. No representative,employee,or agent of GAF,or any otter person,has the authority to assume any additional or other liability or responsibility for GAF unless P is in writing and signed by an authorized GAF Field Services Manager or Director.NOTE:Any inspections made by GAF are ;. limited to a surface inspection only,are for GAF's sole benefit,and do not constitute a waiver of any of the terms and conditions of this guarantee. This guarantee MAY BE SUSPENDED OR CANCELLED IF THE ROOF IS DAMAGED BY any cause listed above as AN EXCLUSION FROM COVERAGE that may affect the integrity or watertightness of the roof. b TRANSFERABILITY You may transfer or assign this guarantee to a subsequent owner of this building for the remaining term only if:11 the request is in writing to GAF at the address listed below within 60 days after ownership transfer;2)you make any repairs to the GAF Roofing Materials or other roofing or building components that ore identified by GAF after an inspection as necessary to preserve the integrity of the GAF Roofing Materials;and 3)you pay an assignment fee of $500.This guarantee 4 NOT otherwise transferable or amignable by contract or operation of law,either directly tar indirectly. LIMITATION OF DAMAGES;MEDIATION;JURISDICTION;CHOKE OF LAW THIS GUARANTEE IS EXPRESSLY IN LIEU OF ANY OTHER GUARANTEES OR WARRANTIES, EXPRESS OR IMPLIED,INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE,and of any other obligations or liability of GAF,whether any claim against it is based upon negligence,breach of warranty,or any other theory.In NO event sholl GAF be liable for any CONSEQUENTIAL OR INCIDENTAL DAMAGES of any kind, including, but not limited to, interior or exterior damages and/or mold growth. The parties agree that,as,a condition precedent to lit'ation,any controversy or claim mloling to this guarantee shall be first submitted to mediation before a mutually acceptable mediator.In the event that mediation is unsuccessful,the parties agree that neither one will commence or prosecute any kswsuit or proceeding other than before the apprc i Ie slot.or federal court in the Slate of New Jersey This guarantee shall be governed by the laws of the State of New Jersey,without regard to principles of conflicts of laws.Each party irrevocably canserth to the jurisdiction and venue of the above identified courts. ' NOTE:This guarantee becomes effective only when all GAP bills for installation and supplies have been paid in full 1361 ALPS ROAD Q` to the roofing contractor and mote6als sup i and WAYNE,NJ 07470 (� the guarantee charge has been paid to GAF. By B Y This guarantee must have a raised seal to be valid Authorized S(gnokm Da'e \tag o2014 GAF 3/It•xlx: COWi704 fir tt M141t, III,? s t, t i ,� 1,� s�t sf+� ytt lr fl uyt� ri 41 r£ hY + aSs •��,th a tY Leo t� c �`4a at ]r'� ,ts� Y!/ `` �aa�yt '4' ! �� f�..f1Y f4 N- '�`,y 4'' C ll EverGuarcr �yqem Pledge Roof Guarantee Protects Your Assets... Conserves Your Investments GAF's EverGuard'System Pledge'Roof Guarantee provides you with extensive coverage against material defects and application errors! STANDARD Ltd.Product Guarantee Material Material Defects What Does The Guarantee Cover? Defects &Workmanshlp Only Errors Covers Entire System? No Yes Maximum Coverage Period? 12 Years 20 Years Includes Replacement Material? Yes,Pro-rated Yes Based On Use Includes Cost Of Labor No Yes To Correct Problem? EverGuard® Who Can Offer Guarantee? Anyone Certified Contractors Is Guarantee Transferable No Yes To Next Owner? Eligibility Requirements for the EverGuard®System Pledge-Roof Guarantee: 1.Your roof must be installed b EverGuard®Master Select"',Master,or Authorized Roofing Contractor certified by GAF Zrfo Single-Ply Systems. 2.The roofer must follow GAF's procedures for guarantee issuance,including notifying GAF of the need for a guarantee before roofing commences. 3.You must use all EverGuord membranes. 4.You must use EverGuord'Accessory Products in conjunction with the membrane system, including EnerqyGuard-Insulation(when applicable);Drill-Tec-Fasteners;Metalastico Expansion Joint Covers (when applicable);and EverGuord'Adhesives/Primers/Sealants. J rr Quality You Can Trust...From North America s Lamest Rooting Manufactured- 1. EverGuard° TPO Brochure (COMEG 120) Updated: 1 1 /15 Quality You Can Trust...From North America's Largest Roofing Manufacturer!TM 0 GA Quality You Can Trust...From Guard North America's S/NGLE—PLY ROOF/NG SYSTEMS Largest Roofing Manufacturer!'"' gaf,com Roofing Systems"'a'" ** EverGuard Extreme Advanced Protectione TPU —EverGuard° TPO EverGuard° Fleece-Back TPO EverGuard°Freedom"Self-Adhering TPO t ANWW r !''Y ; - ,. - "•"fix . ll Fall River Courthouse Fall River,Massachusetts EverGuard"TPO TP0,9s, P„ 4 40-1 1 How Reliable Is Your � . Roofing System? If you are a facility manager,building owner,roof consultant, Choose From Four EverGuard"'TPO Options or architect,you've probably dealt with your share of leaky roofs.Few things can be more annoying(or expensive)than Designed To Meet All Of Your Roofing Needs... EM an unexpected roof leak.The disruption to tenants and damage ENERGY STAR®only to property can be devastating to your business. No one offers more options for TPO roofing than GAF! whit *a USA Choose the system that best meets your project's needs: GAF,North America's largest roofing manufacturer,understands the difference that a reliable roof system can make.That's why •EverGuard Extreme®Advanced Protection°TPO(pg.4) we designed the EverGuard®line of ultra-reliable TPO roofing Best For:Any application(including high heat and solar systems.It incorporates the optimal combination of physical and applications)where you want the very best performing TPO California installation characteristics that results in unsurpassed reliability: you can get Title 24 Compliant •Exceptional seam strength and puncture resistance... •EverGrwrde Membrane Attachment Options(pg.6) for less chance of leaks Best For:Various customer requirements including longterm •Excellent long-term weathering capability... performance,budgets,and versatility F for long-lasting protection .EverGuard•peece-BackTPO(pg.81 •Fast,easy installation... Best For:Recover applications or where puncture and hail c®" for less chance of an installation error resistance is paramount In addition,EverGuard®systems provide a highly reflective •EverGuard°freedom"Sel-Adhering TPO(pg.91 surface for potential energy savings in suitable climates.So if Best For:Installations where the fastest,easiest,low-odor you are looking for the ultimate in roof reliability,with available application is a key requirement ^� N000llar-Limit(NDL(guarantees up to an industry-leading 35 years,you owe it to yourself to consider EverGucrd®TPO. CR y >. . T TPO m6,o 2 3 • TP(Da EverGuard Extreme®TPO u n EverGuard Extreme°Far Exceeds Mi6uvdi:"iniNiSppAderd1°°"t'"�;"°' Advanced Protection For Your Property TypicalTPO Membranes In GAF EverGuard Extreme®Advanced Protection®TPO is the best-performing TPO c UV Weathering Tests... — you can buy for your property.Its patentpending technology not only results in Based on the ASTM D6878 Xenon Arc Weatherometer n -' next-generation performance against heat aging and W degradation(the two testing method,EverGuard Extremes TPO far exceeds — key performance characteristics directly related to roof system longevity),but also the performance of typical TPO membranes—more than exceeds all key ASTM standards for TPO membranes.Why settle for anything less double in most cases. when you can get the advanced protection of EverGuard Extreme®for your property? Why is that important?Because the ASTM weathering ;s Check out tporesults.com for the results of the largest independent TPO study ever done. test is a proxy for how well the membrane will stand EverGuard Extreme*TPO For Exceeds The Performance up to the long-term ravages of UV degradation, Of Typical TPO Membranes key destroyer of long-term TPO membrane performance. des jei�A Other TPO roofing said today simply cannot match the performance of EverGuard `y�°d Extreme®It uses a proprietary formulation of stabilizers and UV absorbers to achieve r' performance levels for beyond current roofing standards.To prove it,we tested EverGuard Extremes against typical TPO membranes for the two key performance EverGuard Extreme*TPO-Typical Applieatioa Guaronte attributes mosthighly sought after in TPO membranes:heat aging and W weathering. T.EverGuard Extreme*TPO Reinforced Membrane Up The results were astounding—which is why we back EverGuard Extreme With the Ava a z 35 y years industry's best guarantees:up to 35 yearsl* 2.EverGuard®Approved Bonding Adhesive —50,60�0&80 mtl WMGaaM Wmm v.Standard TPO M—br°nea 3.EnergyGuard'Polyiso HD Cover Board —A',5',8'&10'widths Xwt-Aemg Taeh... EverGuard Extreme*TPO Has More Than 4.GAF Drill Tec""Insulation Fasteners —so'&100'lengths Double The Performance Of Standard rrr and Plates codes: j —EN Tite24, TPO Membranes In Heat-Aging Tests... d * — 5.EnergyGuard'"Polyiso Insulaton 0 FM,UL,MiamiDade, Why is this important?Because heat can severely FB I FL,Mi.rr7 degrade standard TPO membranes over time.So we rs — 6.Approved Roof Deck .__..293._.._... tested EverGuard Extreme®against the three leading s TPO membranes at 280°F—a temperature beyond the most rigorous proposed ASTM tests.As you can see in the chart(and the unretouched photos below), s os Ag EverGuard Extremes TPO significantly outperformed Syr.Em;svv y 9 t s o s Syr. ed Reflecmnce:72 See EvaGa,d'a;vnwd He,pe"NDt the competition when exposed to damaging heat. $ ��d,fed „e�A ems? See The Proof... Even niter the most severe accelerated heat aging at 2807, But a leading cempetitw's standard TPO shows severe E,wGwrd ExhemeeTPO still looks brand new1 deterioration on both the top and bottom of the membrane. 50 mil & 70 mil EverGuard Extreme®: ' Your"Everyday" Choices In TPO GAF 50 mil and 70 mil versions of EverGuard Extremes EverGuard Extremes,which is similar in price to typical :n. Advanced Protections TPO have virtually identical weathering 80 mil TPO,but with superior performance. characteristics as our 60 mil and 80 mil versions. With EverGuard Extremes TPO,you'll never have to choose What does that mean for you?50 mil EverGuard Extremes between performance and price—you'll get both.And with I(top of membra"el m offers superior performance to typical 60 mil TPO— our 50 mil and 70 mil versions,you II have more design r r; but for virtually the same price-The same is he for 70 mil choices than ever.So why use anything else? 4 5 • TPOI (1_800-766-341 1; EverGuard® Membrane Attachment Options r,n"o-: —uP ro 3o year. Mechanically Attached GAF offers a complete line of adhesives including: —4•,60dny .7 p g —45,1, 1&1mil Application —5 &1 a to widths For a quick and cosreffective system that can be •EV'erGtJafd*T�Bonding Adhesive_. —5a'&100'lengths installed adicall earmund. W. offers high initial tack and is fast drying. cads: P y y —ENERGY STAR®,T ll.24, 1.EverGuard®TPO •EverGuard*low�/�TPO Bonding AdheslYe... FM,UL,M am-0ade,ICC ESR-1597,FBC FL5293-R7 2.DrilFTec"'Insulation Fastener and Hotels) El perfect for code-compliant states requiring air-quality 3.DrilFTec'Fastener and Membrane Hotels) regulations. 4.EnergyGuard'Polyiso Insulation •EverGuard*WB181 Bonding Adhesive... 5.Structural Deck does not produce an odor and can be used during installations on occupied buildings such as hospitals. c a o;am�dned a Na RhinoBond*Application x y�'° to amgkk w,ag Qualifies for the same length guarantee as a fully 0 0, adhered system at nearly the cost of a mechanically attached system.' III 1.EverGuard®TPO Reinforced Membrane . 2.DrilFTec'RhimBond*Notes and Fasteners 3.EnergyGuard"Polyiso Insulation 4.Structural Deck ;.y., . Adhered Application Provides excellent wind uplift performance, a smooth look,and qualifies for the longest guarantee available.* 1.EverGuard TPO � � rs i � �•� `. 2.3-ding Adhesive "k�k 3.DriVec Insulation Fastener and Hotels) 4.EnergyGuard'Polyiso Insulation 6 "' S.Shudural Deck 'ss¢pllmble gumanbe br complNe cwaroge and resit c wits. _— 5�.� —_.-.--- ----- 6 7 TP(3,, EverGuard° Fleece-Back TPO EverGuard° FreedomM TPO Why GAF EverGuard®Fleece-back TPO "Fastest Installation & No Fumes!" •Factory-applied polyester fleece provides additional protection to the membrane, offeringa variety of benefits,including: EverGuard®Freedom'"TPO is a self-adhering roofing system that is ready 9 r"'Of°"te°0 to install direct from the fact just el and stick)It's rfect fora limtions fro"t°°0 -Does not require a slip sheet when re-covering over a variety of roofs -Up to 30 years "ry'I PP -Rapid Seam:10 yeao Availahili where VOCs or asphalt or solvent fumes are unacceptable,like for hospitals, _Hear Weld:20 years -Provides enhanced puncture resistance,especially in areas more prone to hail b"- schools,occupied buildings,etc.It's also ideal far reroofing or smaller -45,60&80 it P 9 9 Avoitsbility: •Increases installation efficiency 2-3 times when installing EverGuard®Fleece-back -5'&10,v idlhs applications,where fast installation is paramount.freedom"TPO comes -45&60 it TPO with GAF 2-Port Roofing Adhesive(compared to standard TPO adhesives) -50'&100'length. with factoryapplied adhesive for fast installation-just peel and stick.Flus, -5'&10'widths -Pisa mailable in factory application means you'll be assured of a uniform coat of adhesive -50'and 100'lengths E—G-rd Extreme® far consistent bonding. Codes: Installation 50,60,70&80 mil g -ENERGY STAR®,Title 24, EverGuard®Fleece-bock TPO can be installed with a wide range of applications: Codes: EverGuard®Freedom'TPO is available with two seam options:heatwelded FM,UL,Miami-Dade,]CC -ENERGY SrAR•,Tide 24, and self-adhered RopidSeam.Both versions eliminate the need for adhesives ESR-1597,FBC FL5293-R7 •Mechanically Attached Application- •IRF-M Adhesive...two-part low-rise FM,UL,Miami-Dade,ICC of any kind.Freedom"RapidSece is the fastesHnstalling TPO we offer-up to - for a quick and costeffective system polyurethane foam adhesive that ESR-1597,FBC FL5293.R7 300%faster than standard solvent-based adhesive installation) that can be installed procticolly is low VOC and accommodates �_Wj year-round, minor surface irregularities.Can EverGuard"Freedom-TPO Typical Application •Adhered Application...can be also be used for ISO insulation installed with EverGuard®WEI81 applications.Available in a 1.EverGuard®Freedom'"TPO -see Ere,a.,,.d^o�.,d�-nar Bondi. Adhesive water based) cartridge or 5-gallon container. Self-Adhered Membrane R°d Gmm°reero,�°mpke� �e 9 I or hot asphalt for the smoothest •1-Part Roofing Adhesive...self- omm-dnsry°-Not 2.Factory-Applied Adhesive appearance.Provides excellent contained low-rise foam dispensing md,�x'°rno�'b"°"'P�°•COieiOLu° and wind uplift performance. kt offering 20 squares per kit so there 3. ddec"Insulation Fastener fewer ewers.Cost effective ad Plates) •IRF-0 AdhefAdhesive.-two port low-rise changeovers.g 4,Heat-Weld or Ra id$ecie polyurethane foam adhesive that is since you don'wnti need spray equipment P low VOC and accommodates mina and no downtime/maintenance Self-Adhered Seam surface irregularities.Available in a worries.Can also be used for ISO S.EnergyGuard"Polyiso Insulation cartridge or 5-gallon container, insulation applications. 6.Structural Deck Low-Rise Foam ' Adhesive Systems (shown left) ,`_` •Two-component adhesive mixed during application •Excellent option for installation of fleece-back systems •Significant installation time savings versus conventional ' 7 adhesives •Meets all local and national airquality standards 8 9 GAF I E (3' I 1800-766-341 1; Are You Meeting The R-value Ener5lyGuard'M DRILL•TEC"40 For Your Area? Polyiso Insulation FASTENERS offers a full line up of Drill-Tec'Fasteners Below,please And the recommended R-values for the ASHRAE Climate Zones: products to meet virtually and Plates offer a any low-slope commercial opt' te �sto''meetf almost any deck type mom roofing insulation need. or insulation need ..w-en with high quality and ❑�. performance you can rely •EnergyGuard`"polyiso Insulation... on.They meet all the standards required by Glass fiber-reinforced cellulosic felt facer bonded to a Factory Mural(FM)and Underwriters Lab JUL). polyiso foam core and available in either compressive And to reduce your labor cost and increase your strength of 20 psi or 25 psi. productivity,most all the Drill-Tec'Fasteners and Hates are compatible with the OMG Acculrac, •EnergyGuard'Ultra Polyiso Insulation... AccuSeom and Rhinobond tools. V� 2 Coated glass fiber mat facer bonded to a polyiso w•r....r....-•a ��,_ foam care and available in either compressive •, ^�'•"' t strength of 20 psi or 25 psi. IN�Yi.W-N 3. EnergyGuard'-Tapered Polyiso Insulation_. •Available in e8her a glass fiber-reinforced cellulosic The ASHRAf sro,dord odd»s»abuilding envelope and system requi»menn lo.commercial burrdmgx»sideniial buildings hghe.Man Mree aronn,and felt or coated glass-fiber mot facers,which helps sm:<adixaned buildings(wareAou».,ek).Il is Me noxoni model wndoN bs esnbF.Aig Meenegy pedwmanco rpui»menn ollhese building ypex eliminate ponding water. •EFwgyGrwrdl-HD&HD Plus... Coaled glass facer bonded to a polyiso foam core The recommended insulation R-values for commercial roofing continue to increase,which is good news providing increased against high trafficand for buildingowners lookingto save costs and p g g help the evironment.States adopt these the elements. recommendations at different speeds, °`-'�"" but the bottom line is that insulation �•„ro!y.°.'-" "-'fir They are designed for use in practically any low- is becoming more important than O slope roof appPcation,including built-up roofs, ever.EnergyGuord'"Polyiso Insulation modified bitumen,or most singleply roofing is designed for use over structural roof .. ` systems All products met the requirements of ASTM decks where R-values of 5.7 or higher C1289 Type II,Class 1,Grade 2 120 PSI),and are required along with comprehensive available in Grade 3(25 PSI)and are both Factory UL and FM approvals.Its also safer for' =Y�^ s ��,�.. Mural IFM)and Underwriters Lab JUL)approved. t y� `� the environment,being manufactured =^'�.' '\�,;�� And because of its light weight,this material is £ with EPAcompliont blowing agents � s easy to handle on the job site and installs faster. containing no CFCs or HCFCs as well \ Easier cutting in the field provides the installer with {"} as having zero ozone depletion potential simplified fabricating on the roof deck. (ODP)and virtually no global warming / potential(GWP). 10 1 (1-800-7606-34111)POrig Field fabrication of TPO accessories is time-consuming,costly,inconsistent,and can lead to unreliable details Use EverGua rd p TPO Prefabricated Accessories that compromise a watertight roofing system. For A Reliable, Watertight Roofing System often associated with prefabricated accessories can deliver oo 6ciotent productivity and eliminatet 2 t*whileworry and problems often associated with field fabrication.They can also boost productiviy up to 200%,'while reducing installed cost by up to 12%compared to field-fabricating accessories. WALKWAY ROLL CORNER CURB WRAP T JOINT COVER INSIDE CORNER Heat welds directly to TPO Four standard sizes to flash curbs: Manufactured to membrane or installed with that are 24'.36'.48',and 60' PATCHES accommodate inside seam tape;available - (609.6,914.4,1,219.20,and - Conforming seal for use corners of base and ' in gray and yellow 1,524 mm)in size : over T-joints in 60 and •••••curb flashings 80 mil membrane • : applications POURABLE SEALER POCKET c `: SCUPPER Structural foundation for EverOuard ........... •••••^......................... TPO ran be heal welded to e+ Pourable Sealant........................................................... the scupper,for a strong, _,-.,,,.,,,...__,-•,,.2„ ✓ ........................secure installation FLUTED CORNER SQUARE TUBE .., For use in flashing outside - •••^••!•f•••••••�••••••°••• •••••••••••••• WRAP comers of base and curb flashings..................................................... .•............ ...� Tube wraps are split with • � .• overlap to wrap around square or rectangular tubing;ensures a solid weld UNIVERSAL CORNER Accommodates both inside PREFORMED \\\ and outside corners of •�����•• base and curb flashings s Three SPLIT standard sizes accommodate most pipes ' and conduits VENT ' PREFORMED z Limits air flow to one director,avoiding: ...........VENT BOOT .moisture buildup ••• ••.••• 1�[ Accommodates most T , 11r' common pipes and conduits from 1•to 6' ..................... .................. (25.4 to 152.4 mm) TPO DRAIN..................... YELLOW TPO can be heat welded directly to the drain body,for secure installation SAFETY TAPE Provides a warning to take caution around potential roof hazards 12 •lk:e .GAF aamok a liddlobrlcak 13 TPO', mit Id. EverGuard° TPO Colors: The Industry's Largest Selection of Color Membranes GAF color TPO membranes can transform a traditional roof into an aesthetic attribute. With standard colors,preformulated colors,and virtually unlimited custom colors,no other single-ply or metal roofing manufacturer offers more color choices than GAF. _ Decorative color membranes can complement overall building aesthetics or shingled areas. Most color choices include"Cool Color"technology,helping to increase reflectivity and reduce energy costs.The pigments have been specially selected to minimize fading. Standard Colors(no minimum order required) Color shown:Patina GreO— Energy Grog 322 Energy Ton 822 Gray 345 Tan 820 Whiro 920 Additional Colors* NONE Colonial Rd 185 Dark Bmnm 220 Dark B—229 Dana Ton 247 Color shown:Regal Red MONOMER OMMON XOfL Iris dikO I , fi,.Wd irrpo da—WOL k dlMiaM duo.f I o�dmlaraar ram e wmdeullM zrudmowul � �no�:rr.��wl K� ■ amgr drama. r rr " ,■ Regal Rd 661 Slate Gray 740 Saoka Gray 765 Tool 812 Tam Cab 815 Tropical Green 825 ' � ��� r ■ �. ■r rr r rrr ■ rr rrrr ■ Custom Colors Ave ilablel BAR �ymi� \ r ,� �r r r r •• •mo�yva�m�am,m ode eq,�red.far n<,n-�ror�b�,�aroa yea i�l era sae Reprmm,a� r r ■ 14 15 elm Guard TP O ng Systems These Critical Support Services Can Help To Make Your Roofing Project A Success! The Best Roofing Contractors Full-Time Field Services Team GAF selects only 2 out of every 100 roofing Our nationwide team of MASTER contractors for our factory-certified commercial Field Services Professionals SELECT contractor program. We provide them with helps ensure that your new �....�ti..�..�.�.�,-. extensive training tools and support to help roof is installed right the ° ensure proper material installation, improve first time. They are a full- - their processes, and enhance their capabilities. time, professionally trained GAF guarantees that include coverage for resource. Our team is a workmanship are available through this elite trusted source for information installation training, contractor force. and best-practice sharing to 61p prevent problems before they happen. Certified Maintenance Professional" CMP'")and Sustainable Roofing Council Industry-Leading Guarantees �. (SRC) Programs • Diamond Pledge'"NDL Roof Guarantee r ° Having a maintenance program in place for your No dollar limit on your covera e; unlike roofing asset is critical for not only optimizing its competitive guarantees, provides true overall longevity and performance but also helping "edge-to-edge" coverage, with additional ensure you have uninterrupted guarantee coverage leak coverage for penetrations and metal if issues arise. GAF Certified Maintenance components.* Professionals (CMPsj are contractors who have . WellRoof®Guarantee Extension... not only the expertise to maintain and service your roof but also the exclusive ability to extend Provides a 25% extension on a Diamond our Diamond Pledge'" NDL Roof Guarantee b Pledge NDL Roof Guarantee when you ROOFjN� 25%—via the WeIlRoof®Guarantee Extension participate in an annual inspection and at no cost to you. Contact GAF Guarantee preventative maintenance program with a 'J Services for details.Also, benefit from working GAF Certified Maintenance Professional' L n with a member of the Sustainable Roofing • All-American Pledgee'Roof Guarantee... Council. Educated in emerging green practices The industry's only such as membrane and insulation recycling, guarantee that LEED®, and the technology behind cool roofing, covers both steep ./ ® :-=__�, EMS an SRC member is the right choice to install your and low slope new cool roofing system. �inafi ong projects FNU Tapered Design Group ne guarantee)osingle source Tapered insulation provides a logical and accountability— 0 &W ME- F TAPERED economical answer for roofs that do not permit and your adequate positive drainage. When correctly convenience.* installed, tapered insulation eliminates problems DESIGN due to pondingg water, and can help extend Technical Help GROUPthe longevity o}your low-slope roofing system. When It Matters GAF's Tapered Design Group provides efficient designs to reduce material costs and waste, Our 800-ROOF-411 hotline is available to precise layouts & material calculations, fast turn- answer technical questions live. Our Technical around times for close-approaching bid dates, team can answer questions regarding and easy-to-read AutoCAD-generated shop installation, codes, product approvals, roof drawings for a "hassle-free" installation. Contact system details, and other technical issues. They the Tapered Design Group at tdg@gaf.com are a complete technical resource dedicated to supporting proper roof installation. Architectural Information Services *See applicable GAF roof guarantee for complete coverage and restrictions. Arc h i tect u ra I Architects and specifiers can access an **Guarantees of 30 and 35 years do not qualify for WeIlRoof®Guarantee Extension. I n fo r m a t i o n entire team devoted to assisting you with AS E R V I C E S the specification process. They can answer questions and provide assistance with master specification preparation and other valuable activities at no charge to you. Call them toll free: 800-522-9224 or email AIS@GAF.com. 1-800-112MOOF-411 @2015 GAF 11/15-#420-1 Campus Drive,Parsippany,NJ 07054 gaf.CUm COMEG120 . �� Mason County Community Services 615 W. Alder St. Bldg 8 Receipt Number: 2019-03910 Shelton, WA 98584 360-427-9670 ext 352 Payer/Payee: CONTRACTORS ROOF SERVICE INC Cashier: NICOLE NORRIS Date: 08/15/2019 6406 43RD AVE CT NW Payment Type: CHECK(7217) GIG HARBOR WA 98335 ............. s 000 Reroof- ROUTE 300 'i STE 0- Fee Description Account Fee Amount Amount Paid Re-Roof Commercial Base Fee 001.000000.125.140 . 322.10.300000.0000.00 $190.00 $190.00 State Fee-Commercial 650.170010.000.000 . 389.30.300000.0000.00 $25.00 $25.00 COM2019-00085 TOTALS: $215.00 $215.00 TOTAL PAID: $215.00 Previous Related Payments Total Printed 08/15/2019 13:11:00 by Nicole Norris Page 1 of 1