FPROJECT
-00085 REROOF- COMMERCIAL
SCRIPTION: REROOF ON MCCLENDONS ISSUED: 08/15/2019
SS: 31 NE STATE ROUTE 300 STE 104 BELFAIR
EXPIRES: 09/12/2021
PARCEL: 123294200190
APPLICANT: DM BELFAIR INVESTMENTS LLC OWNER: DM BELFAIR INVESTMENTS LLC
51 NEST RT 300 51 NE ST RT 300
BELFAIR,WA 98528 BELFAIR,WA98528
GENERAL CONTRACTOR'S LICENSE: CONTRACTORS ROOF SERVICE License: CONTRRS035138
6406 43 RD AVE CT NWGIG HARBOR,WA 98335 Expires: 01/29/2023
858-3044
FEES: Paid Due
State Fee-Commercial $25.00 $0.00
Re-Roof Commercial Base Fee $190.00 $0.00
Totals : $215.00 $0.00
REQUIRED INSPECTIONS
BLD-Final Inspection Progress Inspection
Progress Inspection
CONDITIONS
" Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
Printed by:Corey Bennett on:08/19/2021 03:47 PM Page 1 of 5
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
REROOF- COMMERCIAL COM2019-00085
Adopted IECC/Washington State Energy Code Compliance has been approved as follows:
Heat Type: Electric or other than electric, Compliance Method: Prescriptive option Marine-4C, Window(Max U-
Factor):0.30, Skylight(Max U-Factor):0.50, Doors (Type/Max U-Factor):0.30 or less, Wall insulation R-21, Floor insulation
R-30, Ceiling Insulation min. R-49, Vault Insulation R-38, and Slab Insulation R-10.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable
provisions of the current code and the manufacturer's installation instructions.
A drip edge shall be provided at eaves and gables of shingle roofs.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* A permanent certificate, completed by the builder or registered design professional, shall be posted on a wall in the space
where the furnace is located, a utility room, or an approved location inside the building. When located on the elctrical panel,
the certificate shall not cover or obstruct the visibility of the circuit directory label, service disconnect labek, or toher reqyired
Iabels.The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof, walls, foundation (slab,
basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the
solar heat gain coefficient (SHGC)of fenestration. Where there is more than one value for each component, the certificate
shall list the value covering the largest area. The certificate shall list the type and efficiency of heating, cooling, and service
water heating equipment, duct leakage rates including test conditions as specified in WSEC Section R401.3 & R402.4.1.2,
and air leakage results if a blower door test was conducted.
Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 5 air
changes per hour when tested with a blower door in accordanve with IECC/.WSEC Section R402.4.1.2.
The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution
panel. Air leakage testing is not required for additions less than 500 square feet. Reference IECC/WSEC R402.4.1.2.
Compliance certificates are available online at the WSU Energy program website titled, "WSEC 2015 Certificate"and are
available in '/or'h sheets. The Mason County Permit Center will also have some available.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
Printed by:Corey Bennett on:08/19/2021 03:47 PM
Page 2 of 5
Mason County
Mason County - Division of Community Development
z 615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
REROOF- COMMERCIAL COM2019-00085
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan.
Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* All property lines shall be clearly identified at the time of foundation inspection.
* When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or
100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the
access permit from Public Works has been finaled and approved.
* When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at(206)357-2620, ext. 630.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culve rti ng/d itching system or road way.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
Printed by:Corey Bennett on:08/19/2021 03:47 PM
Page 3 of 5
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
REROOF- COMMERCIAL COM2019-00085
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* A minimum of 75 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in accordance
with IECC/WSEC Section R404.1.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* The foundation/footing must be placed on undisturbed,firm-native soil.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind
speed for Mason County is 85 MPH.
* Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a
permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor
& Industries (L&I).
For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-
4000.
* Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer
specifications and in accordance with IRC Section R315.
Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level
of the dwelling.
EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations (including addition or alteration of
fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or
created.
* Roof Covering: IRC section R905&907
Selected roof covering must be installed in accordance with manufacturer's specifications and IRC requirements.A drip edge
shall be provided at eaves and gables of shingle roofs.
* Insulation: IECC 101.4.3 exception#5
Roofs without insulation in the cavity and where the
sheathing or insulation is exposed during re-roofing shall be insulated either above or below the sheathing. Insulation is not
required for roofs where neither the sheathing nor the insulation is exposed. (Reference IECC/WSEC R101.4.3)
Printed by:Corey Bennett on:08/19/2021 03:47 PM Page 4 of 5
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
REROOF- COMMERCIAL COM2019-00085
" Attic Ventilation: IRC section R806
Enclosed attic and rafter area shall be supplied with cross-ventilation. The net area shall not be less than 1/150 of the area
of the space to be ventilated. If 50% and not more than 80% of the ventilating area is provided from the upper portion of the
space to be ventilated, then 1/300 is allowed.
* Roof Slope: IRC section R904.1
Roof slope must be indicated to ensure selected roof covering is allowed on designed pitch.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:
Printed by:Corey Bennett on:08/19/2021 03:47 PM Page 5 of 5
0 n O T
G z z Z ;
—I m 0 3
N d r
_ n n
O O
C) CD m X
o
z m o W O
Z Z W � N
A
D C)n W o
z cn < pro
z � O m CA
c
U) -n
Z
D co <
`+ m m C�
n
3 r D D
Zv v
v v X X
y v /� O O Z
N CO 0 0 WC Mu
C
rn cn v D O (/)
0) z m 1 DTI
CA
m cn 0 o No0N n
�o y va0
H m o z 0 C) 0
to n CD =3 CD ? = Z
� CD 3
v M Z :l7 wCD WOG
m ch
o -1 p m N?
z O � D
z m 0 v
n � cn
00
0 O
M M
z M
� w
O o
z
C/) --j
a m
m
v -o co
_ = m
O
r
m m D
o 00
cyl
00
D
3 w
00
cri
o cfl
N 00
cop RECENED
A MASON COUNTY AUG 1 5 Mt 1g COM V� I -�W
R�
COMMUNITY SERVICES DEPARTMENT
= Mason County Bldg. 8, 615 W.Alder Street Shelton, WA 98584
www.co.mason.wa.us (360)427-9670 ext.352 Belfair(360)275-4467 Elma(360)482-5269
ISM
NON-RESIDENTIAL RE-ROOF APPLICATION
Roofing Sq ft area «t 0d0 Type of Roofing to be Applied 0.0V 0 M I l TPO
Number of existing layers Roof Pitch: Tt ` Tear off: X Yes _No
Use of building OhOWN i1 Construction Type: *00d Roofing Classification
(Occupancy classification) (wood,steel frame,masonry etc.) ** See note below (A,B or Q
Include manufacture specifications verifying materials meet roofing classification.
B&C roofing classifications require site plan drawn to scale.
Will insulation be installed?_Yes Y No
Existing Insulation, describe : IYtSIdt "a til C," S.PUCe/
Existing roofs shall be insulated to the requirements of R-38 if electric heat, R-30 all others, IF:
a3he roof is uninsulated or insulation is removed to the level of the sheathing or
b.All insulation in the roof/ceiling was previously installed exterior to the sheathing or nonexistent.
Roof ventilation, describe : +Sfiiinu oAr�Ss/ inar>?ss
Roof deck&insulation Inspection required before new roofing materials can be applied
Name of Business: N Ot&f(1nV8tr laV T
Subject Property Address: �5I t� �t ROyty ho
Assessors parcel number(s)• 121 . 42-W P 0
(Address and parcel number required for all applications)
Owner: �U a�fai✓IwAMW 11, UG ,I
Mailing address: PO lv0� 211 City: I"i Island State: Wit Zip: a gel b"J
Phone (1�792 ) LQ49-44 5a FAX ( ) E-Mail: 6yiSkuYIIGmdwarc.aow
—Expedited permits may be obtained for class A roofing
I hereby authorize my representative(s)to inspect my property Monday-Friday between the hours of 8 a.m. and 5
p.m.during th' ermit applicat on process for purposes of verifying site conditions.
Owner: Date: 0 f 1.41 1`i
.a�0014 cocy� MASON COUNTY COMMUNITY SERVICES
° PERMIT ASSISTANCE CENTER: Permit No:
•BUILDING •PLANNING •FIRE MARSHAL
615 W.Alder St-Shelton,WA 98584 C�
Phone Shelton:(360)427-9670 ext.352 • Fax:(360)427-7798 Phone
Belfair.(360)275-4467• Phone Elma:(360)482-5269 4110
BUILDING PERMIT APPLICATION 61S (// % O
PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATION: ��cy
I-" rk eet
NAME: it vas �S� U.0 NAME:�ntractor� Of SIYUlct, lnc. tr
MAIL G ADDRE_$S: MAILING ADDRESS:
CITY: �{ STATEAA ZIP: CITY: STATE: WA ZIP:
PHONE#1:QGj -U VI.4 UV34 PHONE: ' CELL:
PHONE#2: EMAIL: hi(In Q M Y
EMAIL d Wt A CS.09 m L&I REG#C MTt2RS ONE_EXP. /
CONTACT PERSON: OWNER❑ CONTRACTOR 9 OTHER❑
NAME:Contlpct0rs koO Service, InC- MAILING ADD SS: U4011 w vB Lt
CITY: 1/Or STATE: A ZIP: g;1-17s PHONE: • 0! CELL:
EMAIL: YUO I
PARCEL INFORMATION:
PARCEL NUMBER(12 Digit Number) p919• L V q o ZONING
LEGAL DESCRIPTION(Abbreviated) FIRE DISTRICT
SITE ADDRESS
a, NE a RO(AbfiNO _ CITY P9fatr
DIRECTIONS TO SITE ADDRESS
IS THE PROJECT WITHIN 300 FT OF SLOPE(S)GREATER THAN 14%: YES❑ NO k
IS PROPERTY WITHIN 200 FT: (Check all that apply):
SALTWATER❑ LAKE❑ RIVER/CREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF❑p S,TRrEAM❑
TYPE OF WORK: NEW ❑ ADDITION ❑ ALTERATION
1 REPAIR❑ OTHER � 1tlrUVT
USE OF STRUCTURE(Residence,Garage,Commercial Bldg,Etc.) N"A I MA I
IS USE: PRIMARY N SEASONAL❑ NUMBER OF BEDROOMS NUMBER OF BATHROOMS � i
HEATED STRUCTURE? YES(Whole Bldg)❑ YES(Part[s]of Bldg)❑ NO❑ kk
DESCRIBE WORK 9IS Y
rV►te AVICAIN 0[11110. IMsfian r '0 P 0-0(pOlYt(j aluation/ProjectBidAmount:$ _ )
SQU E F OTAGE:
1ST FLOOR sq.ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.ft. BASEMENT sq.ft.
DECK sq.ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq.ft.
GARAGE sq.ft. Attached❑ Detached❑ CARPORT sq.ft. Attached❑ Detached❑
MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED*
MAKE MODEL YEAR LENGTH
WIDTH BEDROOMS BATHS SERIAL NUMBER
OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below.I declare that I am the owner and I further declare that I am entitled to
receive this permit and to do the work as proposed.I have obtained permission from all the necessary parties,including
any easement holder or parties of interest regarding this project. The owner or legal representative,represents that the
information provided is accurate and grants employees of Mason County access to the above described property and
structure(s)for review and inspection. This permit/application becomes null&void if work or authorized construction is
not commenced within 180 days or if construction work is suspended for a period of 180 days.
PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS
PERM ICAT N OF 180 DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON
COUNTY CODE 14.08.42)
X-
Signature of OWNER(Must be signed by the OWNER) Date
DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS
BUILDING DEPARTMENT
PLANNING DEPARTMENT
FIRE MARSHAL
PERMIT SPECIALISTS ntake: Tanner: pproved&Readv for Pick-Up:
Visituson-line: http://www.co.mason.wa.us/community_dev/ Rev.127/2016 by JBN
Jeff Rankin
From: Erica Lee <erica.lee@gaf.com>
Sent: Thursday,August 15, 2019 8:25 AM
To: Jeff Rankin
Subject: UL Class A
SINGLE PLY MEMBRANE ROOFING SYSTEMS (TPO)
Class A, - Mechanically Fastened
2. Deck: NC Incline: 2-1/2
Insulation (Optional, see note):—Any UL Classified, any thickness.
Barrier Board (Optional, see note):— Minimum 1/2-in. thick gypsum board or minimum 1/4-in. thick
Georgia-Pacific Gypsum LLC "DensDeck® Roofboard" or "DensDeck® Prime Roofboard" or "DensDeck®
DuraGuardT"^ Roofboard" or minimum 1/4-in. thick United States Gypsum Co. "SECUROCK® Roof Board"
(Type FRX-G)" or "SECUROCK® Glass-Mat Roof Board" (Type SGMRX).
Membrane: — "EverGuard® TPO" 45-mil to 60-mil or "EverGuard Extreme® TPO" 50-mil to 60-mil,
mechanically fastened.
Note:—A Barrier Board is required when insulation is present.
*1/2-in. thick (minimum) gypsum board or 1/4-in. thick (minimum) Georgia-Pacific Gypsum LLC "DensDeck®
Roofboard" or "DensDeck® Prime Roofboard" or "DensDeck® DuraGuard'" Roofboard" or 1/4-in.thick (minimum)
United States Gypsum Co. "SECUROCK® Roof Board" (Type FRX-G) or "SECUROCK® Glass-Mat Roof Board" (Type
SGMRX) may be used in any existing noncombustible deck Classification. When this is done, the resulting roofing
system is acceptable for use over combustible (15/32-in.thick minimum) roof decks. However,the butt joints in the
gypsum board and Georgia-Pacific Gypsum LLC "DensDeckn Roofboard" or°DensDeckn Prime Roofboard" or
"DensDeck® DuraGuardT"^ Roofboard" are to offset a minimum of 6-in.with the buttjoints in the roof deck. If
polystyrene is part of the roof system, it must be placed below the overlayment board. 1/4-in. thick (minimum)
"SECUROCK® Roof Board" (Type FRX-G) and "SECUROCK® Glass-Mat Roof Board" (Type SGMRX) are limited to a
maximum 3:12 slope when used over a combustible deck in a system with any UL Classified insulation except
polystyrene.
Erica Lee
Tech Support Representative
2901 Turtle Creek Dr.
Port Arthur, TX 77642
800-766-3411 Ext. 1468
' We protect
what rna tens most"
i
12 0' .
e
p
4 -
g
I S r3 ,. -
n / l
not
fF
IFAW
�e, T
l —L:
y
00 —.Of - _
MOD
L
� m
a dLI10
} = i
E,
rea us
IL
t of
o
y
d
e
.,
RW
rMit
MOM
s 4z
0
se
a
1
McClendons Hardware • • Drawn By:JLR
11
1• Aerial Site Plan
EverGuarde System Pledge"
Roof Guarantee
(COMTS704)
Updated: 3/14
Quality You Can Trust...From
North America's Largest Roofing Manufacturer!'
.�'� � "" /�' � `� �i.ti i ./r- �"\ram- ✓""✓�" r` ,'"=i✓>=�a:/`�z�,�'``^+
( ,`9''� •'»,�y .�;. -�"'-%<�.� '�Za..a�l J ��c�+3 ct�� <, r,,;
P �}vah.yY f a s r.*a as s�'*{ a !a;'i4y+�, a ti7 Y �'. `�O 'l�. \'.:;
r5J',. a� a t ra s rya� v a
� + Y+T ���- ' ryz��iT a.:
y s s t
Act
,M
EverGuard® SYSTEM PLEDGE
ROOF GUARANTEE I ''
OWNER: .._....._____.PERIOD OF COVERAGE: YEARS
NAME AND TYPE OF BUILDING: '�ya
ADDRESS OF BUILDING:
ROOF SPECIFICATION: AREA OF ROOF: SQUARES »s �
_ APPLIED BY.
DATE OF COMPLETION: GUARANTEE EXPIRATION DATE:
THE GUARANTEE/SOLE AND EXCLUSIVE REMEDY
GAF guarantees h,you,the original owner of the building described above,that GAF will provide'Edge To Edge'protection by repairing leaks
through the GAf roofing membrane,liquictapplied membrane or cowing,base Bashing,high wall wolerprcefin flashing insulation,expansion ."I
covers,preAashod accessories,and metal fleshings used by the contractor of record that mee15MACNA:tandords(the'GAF floating Materials")resulting ,
from a manufacturing defect,ordinary wear and tear,or workmanship in optg the GAF Roofing Materials.GAF's MAXIMUM LIABILITY under this .e.
guarantee shall not exceed in the aggregate over the life of this guarantee more than$ per 1 DO square feet of roof area.Leaks caused by any
materials other than those listed above,such as the real deck,non-GAF insulation,or any other materials used in the construction of the roof system,ore =u
not covered.
GUARANTEE PERIOD!(
This guarantee ends on the expiration date listed above.NOTE:Lexsuco"and uncoated M-Curb"Floshings are covered by this guarantee
only for the first ten years.
OWNER RESPONSIBILITIES ,
,aksib- Notification of Leaks
V '' In the u event of a took through the GAF Roofing Materials,You MUST make sure that GAF is notified directly about the leak,in writing,within 90
f days by—.if(preferred)at guamnteel-1,09of.can or by postal mail to GAF Guarantee Services,1361 Alps Road,Bldg.11-1,Wayne,New Jersey
ve
07470,.r GAF will ha no responsibility for making repars.NOTE:The roofing contractor is NOT an agent of GAF;notice to the coo Ware,
contractor is .g
NOT notice to GAF.
By notifying GAF you authorize GAF to investigate the cause of the lack.If the investigation reveals that the leak is not covered by this guarantee,
you agree to pay on investigation cost of$500.This guoronlee will be cancelled if you fail to pay this cast within 30 days of receipt of an invoice for it.
Preventative Maintenance and Repairs `rye
A.You must perform regular inspections and maintenance and keep records of this work.
B.To keep this guarantee in affect,you must repair any conditions in the building structure or roofing system that are not covered by this guarantee but
that GAF concludes may be threatening the imegrity of the GAF Roofing Materials(e.g.,porous walls allowing water envy in the roofing system).
C.You may make temporary repairs to minimize damage to the building or its contents in an emergency,at your sole expense.Thaw repairs will not result
in cancellation of the guarantee m long as they are reasonable and customary and do net result in permanent damage to the GAF Roofing Materials.
D.Any equipment or material that impedes any inspection or repair must be removed at your expense so that GAF can perform inspections or repairs.
EXCLUSIONS FROM COVERAGE
' (e.g.,items that arc not"ordinary wear and tear"or am beyond GAF s control)
z This guarantee does NOT cover conditions other than kooks.This guarantee also does NOT cover leaks caused by any of the following;
1.Inadequate roof maintenance,the]is,the failure to follow the Scheduled A.Traffic of any notum on the roof unless using GAF walkways applied
Maintenance Checklists provided with this gueranlee (extra copies in accordance with GAN published application instructions.
available by calling Guarantee Services al 1.800ROOF-41 11. S.Blislers in the GAF Roahng Materials that have not resulted in leeks unless
2.Unusual weather conditions or natural disasters including, but not the blister is in a seam and may affect the watertight integrity of the GAF
limited to,windstorms,hail,floods,hurricanes,lightning,lomodos,and Roofing Materials.
earthgvokes,unless specifically covered under this guarantee 6.Changes in the use of the building or any repairs,modifications,or `
3.Damage to the roof constructed of the GAF Roofing Moterials due to: additions to the GAF Roofing Materials after the roof is completed,unless
(a)movement or cracking of the roof deck at building,(b)improper approved in writing by GAF.
installation or failure of any n,, GAF insulation or materials; (c) 7.Exppoosure to sustained highaemperature conditions;however,for systems
infiltration or condensation of moisture through or around the wells, ulilizing EverGuard Extreme*TPO membrane,exposure in excess of
copings,building structure,or surrounding materials except where high 195°F.
wall GAF waterproofing flashings are installed;(d)chemical attack an B.Any condition(e.g.,base flashing height or leak of counter Rushing)that
the membrane,including,but not limited to,exposure to grease or oil;(e) is not in accordance with GAF's pu fished application instructions or
the failure of wood trailers to remain attached to the structure;(1)moisture any deviation or modification from any published specification,unless
,L migration from the building interior or any Its component other than specifically authorized by a GAF Field Services Massager or Director
the GAF Roofng Ma erials;tar(9)use o materials that are mcompolible in writing.
with the GAF Roofing M.ieriols.
No representative,employee,or agent of GAF,or any otter person,has the authority to assume any additional or other liability or responsibility
for GAF unless P is in writing and signed by an authorized GAF Field Services Manager or Director.NOTE:Any inspections made by GAF are ;.
limited to a surface inspection only,are for GAF's sole benefit,and do not constitute a waiver of any of the terms and conditions of this guarantee.
This guarantee MAY BE SUSPENDED OR CANCELLED IF THE ROOF IS DAMAGED BY any cause listed above as AN EXCLUSION FROM
COVERAGE that may affect the integrity or watertightness of the roof.
b
TRANSFERABILITY
You may transfer or assign this guarantee to a subsequent owner of this building for the remaining term only if:11 the request is in writing to GAF at the
address listed below within 60 days after ownership transfer;2)you make any repairs to the GAF Roofing Materials or other roofing or building components
that ore identified by GAF after an inspection as necessary to preserve the integrity of the GAF Roofing Materials;and 3)you pay an assignment fee of
$500.This guarantee 4 NOT otherwise transferable or amignable by contract or operation of law,either directly tar indirectly.
LIMITATION OF DAMAGES;MEDIATION;JURISDICTION;CHOKE OF LAW
THIS GUARANTEE IS EXPRESSLY IN LIEU OF ANY OTHER GUARANTEES OR WARRANTIES, EXPRESS OR IMPLIED,INCLUDING ANY IMPLIED
WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE,and of any other obligations or liability of GAF,whether any
claim against it is based upon negligence,breach of warranty,or any other theory.In NO event sholl GAF be liable for any CONSEQUENTIAL
OR INCIDENTAL DAMAGES of any kind, including, but not limited to, interior or exterior damages and/or mold growth.
The parties agree that,as,a condition precedent to lit'ation,any controversy or claim mloling to this guarantee shall be first submitted to mediation before
a mutually acceptable mediator.In the event that mediation is unsuccessful,the parties agree that neither one will commence or prosecute any kswsuit or
proceeding other than before the apprc i Ie slot.or federal court in the Slate of New Jersey This guarantee shall be governed by the laws of the State
of New Jersey,without regard to principles of conflicts of laws.Each party irrevocably canserth to the jurisdiction and venue of the above identified courts.
' NOTE:This guarantee becomes effective only when all GAP
bills for installation and supplies have been paid in full 1361 ALPS ROAD
Q` to the roofing contractor and mote6als sup i and WAYNE,NJ 07470
(� the guarantee charge has been paid to GAF. By
B
Y
This guarantee must have a raised seal to be valid Authorized S(gnokm Da'e
\tag
o2014 GAF 3/It•xlx: COWi704
fir tt
M141t, III,?
s t, t i ,� 1,� s�t sf+� ytt lr fl uyt� ri 41 r£
hY + aSs •��,th a tY Leo t� c �`4a at ]r'� ,ts� Y!/ `` �aa�yt
'4' ! �� f�..f1Y f4 N- '�`,y 4'' C
ll
EverGuarcr
�yqem Pledge
Roof Guarantee
Protects Your Assets...
Conserves Your Investments
GAF's EverGuard'System Pledge'Roof Guarantee provides you with extensive coverage against
material defects and application errors!
STANDARD
Ltd.Product
Guarantee
Material Material Defects
What Does The Guarantee Cover? Defects &Workmanshlp
Only Errors
Covers Entire System? No Yes
Maximum Coverage Period? 12 Years 20 Years
Includes Replacement Material? Yes,Pro-rated Yes
Based On Use
Includes Cost Of Labor No Yes
To Correct Problem?
EverGuard®
Who Can Offer Guarantee? Anyone Certified
Contractors
Is Guarantee Transferable No Yes
To Next Owner?
Eligibility Requirements for the EverGuard®System Pledge-Roof Guarantee:
1.Your roof must be installed b EverGuard®Master Select"',Master,or Authorized Roofing
Contractor certified by GAF Zrfo Single-Ply Systems.
2.The roofer must follow GAF's procedures for guarantee issuance,including notifying
GAF of the need for a guarantee before roofing commences.
3.You must use all EverGuord membranes.
4.You must use EverGuord'Accessory Products in conjunction with the membrane system,
including EnerqyGuard-Insulation(when applicable);Drill-Tec-Fasteners;Metalastico Expansion
Joint Covers (when applicable);and EverGuord'Adhesives/Primers/Sealants.
J
rr Quality You Can Trust...From
North America s Lamest Rooting Manufactured- 1.
EverGuard° TPO Brochure
(COMEG 120)
Updated: 1 1 /15
Quality You Can Trust...From
North America's Largest Roofing Manufacturer!TM
0
GA
Quality You Can
Trust...From Guard
North America's S/NGLE—PLY ROOF/NG SYSTEMS
Largest Roofing
Manufacturer!'"'
gaf,com
Roofing Systems"'a'"
**
EverGuard Extreme
Advanced Protectione TPU
—EverGuard° TPO
EverGuard° Fleece-Back TPO
EverGuard°Freedom"Self-Adhering TPO
t
ANWW
r !''Y
;
- ,. - "•"fix .
ll Fall River Courthouse
Fall River,Massachusetts
EverGuard"TPO
TP0,9s,
P„ 4
40-1 1
How Reliable Is Your � .
Roofing System?
If you are a facility manager,building owner,roof consultant, Choose From Four EverGuard"'TPO Options
or architect,you've probably dealt with your share of leaky
roofs.Few things can be more annoying(or expensive)than Designed To Meet All Of Your Roofing Needs...
EM
an unexpected roof leak.The disruption to tenants and damage ENERGY STAR®only
to property can be devastating to your business. No one offers more options for TPO roofing than GAF! whit *a USA
Choose the system that best meets your project's needs:
GAF,North America's largest roofing manufacturer,understands
the difference that a reliable roof system can make.That's why •EverGuard Extreme®Advanced Protection°TPO(pg.4)
we designed the EverGuard®line of ultra-reliable TPO roofing Best For:Any application(including high heat and solar
systems.It incorporates the optimal combination of physical and applications)where you want the very best performing TPO California
installation characteristics that results in unsurpassed reliability: you can get Title 24
Compliant
•Exceptional seam strength and puncture resistance... •EverGrwrde Membrane Attachment Options(pg.6)
for less chance of leaks Best For:Various customer requirements including longterm
•Excellent long-term weathering capability... performance,budgets,and versatility F
for long-lasting protection .EverGuard•peece-BackTPO(pg.81
•Fast,easy installation... Best For:Recover applications or where puncture and hail c®"
for less chance of an installation error resistance is paramount
In addition,EverGuard®systems provide a highly reflective •EverGuard°freedom"Sel-Adhering TPO(pg.91
surface for potential energy savings in suitable climates.So if Best For:Installations where the fastest,easiest,low-odor
you are looking for the ultimate in roof reliability,with available application is a key requirement ^�
N000llar-Limit(NDL(guarantees up to an industry-leading 35
years,you owe it to yourself to consider EverGucrd®TPO. CR y
>. . T
TPO
m6,o
2 3
• TP(Da
EverGuard Extreme®TPO
u n EverGuard Extreme°Far Exceeds Mi6uvdi:"iniNiSppAderd1°°"t'"�;"°'
Advanced Protection For Your Property TypicalTPO Membranes In
GAF EverGuard Extreme®Advanced Protection®TPO is the best-performing TPO c UV Weathering Tests... —
you can buy for your property.Its patentpending technology not only results in Based on the ASTM D6878 Xenon Arc Weatherometer n -'
next-generation performance against heat aging and W degradation(the two testing method,EverGuard Extremes TPO far exceeds —
key performance characteristics directly related to roof system longevity),but also the performance of typical TPO membranes—more than
exceeds all key ASTM standards for TPO membranes.Why settle for anything less double in most cases.
when you can get the advanced protection of EverGuard Extreme®for your property? Why is that important?Because the ASTM weathering ;s
Check out tporesults.com for the results of the largest independent TPO study ever done. test is a proxy for how well the membrane will stand
EverGuard Extreme*TPO For Exceeds The Performance up to the long-term ravages of UV degradation,
Of Typical TPO Membranes key destroyer of long-term TPO membrane performance. des jei�A
Other TPO roofing said today simply cannot match the performance of EverGuard `y�°d
Extreme®It uses a proprietary formulation of stabilizers and UV absorbers to achieve r'
performance levels for beyond current roofing standards.To prove it,we tested
EverGuard Extremes against typical TPO membranes for the two key performance EverGuard Extreme*TPO-Typical Applieatioa
Guaronte
attributes mosthighly sought after in TPO membranes:heat aging and W weathering. T.EverGuard Extreme*TPO Reinforced Membrane Up
The results were astounding—which is why we back EverGuard Extreme With the Ava a z 35 y years
industry's best guarantees:up to 35 yearsl* 2.EverGuard®Approved Bonding Adhesive —50,60�0&80 mtl
WMGaaM Wmm v.Standard TPO M—br°nea 3.EnergyGuard'Polyiso HD Cover Board —A',5',8'&10'widths
Xwt-Aemg Taeh...
EverGuard Extreme*TPO Has More Than 4.GAF Drill Tec""Insulation Fasteners —so'&100'lengths
Double The Performance Of Standard rrr and Plates codes:
j —EN Tite24,
TPO Membranes In Heat-Aging Tests... d * — 5.EnergyGuard'"Polyiso Insulaton 0 FM,UL,MiamiDade,
Why is this important?Because heat can severely FB I FL,Mi.rr7
degrade standard TPO membranes over time.So we rs — 6.Approved Roof Deck .__..293._.._...
tested EverGuard Extreme®against the three leading s
TPO membranes at 280°F—a temperature beyond the
most rigorous proposed ASTM tests.As you can
see in the chart(and the unretouched photos below), s os
Ag
EverGuard Extremes TPO significantly outperformed Syr.Em;svv y 9 t
s o s Syr. ed Reflecmnce:72 See EvaGa,d'a;vnwd He,pe"NDt
the competition when exposed to damaging heat. $ ��d,fed „e�A ems?
See The Proof...
Even niter the most severe accelerated heat aging at 2807, But a leading cempetitw's standard TPO shows severe
E,wGwrd ExhemeeTPO still looks brand new1 deterioration on both the top and bottom of the membrane.
50 mil & 70 mil EverGuard Extreme®:
' Your"Everyday" Choices In TPO
GAF 50 mil and 70 mil versions of EverGuard Extremes EverGuard Extremes,which is similar in price to typical
:n. Advanced Protections TPO have virtually identical weathering 80 mil TPO,but with superior performance.
characteristics as our 60 mil and 80 mil versions. With EverGuard Extremes TPO,you'll never have to choose
What does that mean for you?50 mil EverGuard Extremes between performance and price—you'll get both.And with
I(top of membra"el m offers superior performance to typical 60 mil TPO— our 50 mil and 70 mil versions,you II have more design
r r;
but for virtually the same price-The same is he for 70 mil choices than ever.So why use anything else?
4 5
• TPOI (1_800-766-341 1;
EverGuard® Membrane
Attachment Options r,n"o-:
—uP ro 3o year.
Mechanically Attached GAF offers a complete line of adhesives including: —4•,60dny
.7 p g —45,1, 1&1mil
Application —5 &1 a to widths
For a quick and cosreffective system that can be •EV'erGtJafd*T�Bonding Adhesive_. —5a'&100'lengths
installed adicall earmund. W. offers high initial tack and is fast drying. cads:
P y y —ENERGY STAR®,T ll.24,
1.EverGuard®TPO •EverGuard*low�/�TPO Bonding AdheslYe... FM,UL,M am-0ade,ICC
ESR-1597,FBC FL5293-R7
2.DrilFTec"'Insulation Fastener and Hotels) El perfect for code-compliant states requiring air-quality
3.DrilFTec'Fastener and Membrane Hotels) regulations.
4.EnergyGuard'Polyiso Insulation •EverGuard*WB181 Bonding Adhesive...
5.Structural Deck does not produce an odor and can be used during
installations on occupied buildings such as hospitals. c a o;am�dned a Na
RhinoBond*Application x y�'° to amgkk w,ag
Qualifies for the same length guarantee as a fully 0 0,
adhered system at nearly the cost of a mechanically
attached system.' III
1.EverGuard®TPO Reinforced Membrane .
2.DrilFTec'RhimBond*Notes and Fasteners
3.EnergyGuard"Polyiso Insulation
4.Structural Deck ;.y., .
Adhered Application
Provides excellent wind uplift performance,
a smooth look,and qualifies for the longest
guarantee available.*
1.EverGuard TPO � � rs i � �•� `.
2.3-ding Adhesive "k�k
3.DriVec Insulation Fastener and Hotels)
4.EnergyGuard'Polyiso Insulation 6 "'
S.Shudural Deck
'ss¢pllmble gumanbe br complNe cwaroge and resit c wits. _— 5�.� —_.-.--- -----
6 7
TP(3,,
EverGuard° Fleece-Back TPO EverGuard° FreedomM TPO
Why GAF EverGuard®Fleece-back TPO "Fastest Installation & No Fumes!"
•Factory-applied polyester fleece provides additional protection to the membrane,
offeringa variety of benefits,including: EverGuard®Freedom'"TPO is a self-adhering roofing system that is ready
9 r"'Of°"te°0 to install direct from the fact just el and stick)It's rfect fora limtions fro"t°°0
-Does not require a slip sheet when re-covering over a variety of roofs -Up to 30 years "ry'I PP -Rapid Seam:10 yeao
Availahili where VOCs or asphalt or solvent fumes are unacceptable,like for hospitals, _Hear Weld:20 years
-Provides enhanced puncture resistance,especially in areas more prone to hail b"- schools,occupied buildings,etc.It's also ideal far reroofing or smaller
-45,60&80 it P 9 9 Avoitsbility:
•Increases installation efficiency 2-3 times when installing EverGuard®Fleece-back -5'&10,v idlhs applications,where fast installation is paramount.freedom"TPO comes -45&60 it
TPO with GAF 2-Port Roofing Adhesive(compared to standard TPO adhesives) -50'&100'length. with factoryapplied adhesive for fast installation-just peel and stick.Flus, -5'&10'widths
-Pisa mailable in factory application means you'll be assured of a uniform coat of adhesive -50'and 100'lengths
E—G-rd Extreme® far consistent bonding. Codes:
Installation 50,60,70&80 mil g -ENERGY STAR®,Title 24,
EverGuard®Fleece-bock TPO can be installed with a wide range of applications: Codes: EverGuard®Freedom'TPO is available with two seam options:heatwelded FM,UL,Miami-Dade,]CC
-ENERGY SrAR•,Tide 24, and self-adhered RopidSeam.Both versions eliminate the need for adhesives ESR-1597,FBC FL5293-R7
•Mechanically Attached Application- •IRF-M Adhesive...two-part low-rise FM,UL,Miami-Dade,ICC of any kind.Freedom"RapidSece is the fastesHnstalling TPO we offer-up to -
for a quick and costeffective system polyurethane foam adhesive that ESR-1597,FBC FL5293.R7 300%faster than standard solvent-based adhesive installation)
that can be installed procticolly is low VOC and accommodates �_Wj
year-round, minor surface irregularities.Can EverGuard"Freedom-TPO Typical Application
•Adhered Application...can be also be used for ISO insulation
installed with EverGuard®WEI81 applications.Available in a 1.EverGuard®Freedom'"TPO -see Ere,a.,,.d^o�.,d�-nar
Bondi. Adhesive water based) cartridge or 5-gallon container. Self-Adhered Membrane R°d Gmm°reero,�°mpke� �e
9 I
or hot asphalt for the smoothest •1-Part Roofing Adhesive...self- omm-dnsry°-Not 2.Factory-Applied Adhesive
appearance.Provides excellent contained low-rise foam dispensing md,�x'°rno�'b"°"'P�°•COieiOLu°
and
wind uplift performance. kt offering 20 squares per kit so there 3. ddec"Insulation Fastener
fewer ewers.Cost effective ad Plates)
•IRF-0 AdhefAdhesive.-two port low-rise changeovers.g 4,Heat-Weld or Ra id$ecie
polyurethane foam adhesive that is since you don'wnti need spray equipment P
low VOC and accommodates mina and no downtime/maintenance Self-Adhered Seam
surface irregularities.Available in a worries.Can also be used for ISO S.EnergyGuard"Polyiso Insulation
cartridge or 5-gallon container, insulation applications. 6.Structural Deck
Low-Rise Foam '
Adhesive Systems
(shown left)
,`_` •Two-component adhesive
mixed during application
•Excellent option for installation
of fleece-back systems
•Significant installation time
savings versus conventional
' 7
adhesives
•Meets all local and national
airquality standards
8 9
GAF I E
(3' I 1800-766-341 1;
Are You Meeting The R-value Ener5lyGuard'M DRILL•TEC"40
For Your Area? Polyiso Insulation FASTENERS
offers a full line up of
Drill-Tec'Fasteners
Below,please And the recommended R-values for the ASHRAE Climate Zones: products to meet virtually and Plates offer a
any low-slope commercial opt' te
�sto''meetf
almost any deck type
mom roofing insulation need. or insulation need
..w-en with high quality and
❑�. performance you can rely
•EnergyGuard`"polyiso Insulation... on.They meet all the standards required by
Glass fiber-reinforced cellulosic felt facer bonded to a Factory Mural(FM)and Underwriters Lab JUL).
polyiso foam core and available in either compressive And to reduce your labor cost and increase your
strength of 20 psi or 25 psi. productivity,most all the Drill-Tec'Fasteners and
Hates are compatible with the OMG Acculrac,
•EnergyGuard'Ultra Polyiso Insulation... AccuSeom and Rhinobond tools.
V� 2 Coated glass fiber mat facer bonded to a polyiso
w•r....r....-•a ��,_ foam care and available in either compressive
•, ^�'•"' t strength of 20 psi or 25 psi.
IN�Yi.W-N 3.
EnergyGuard'-Tapered Polyiso Insulation_.
•Available in e8her a glass fiber-reinforced cellulosic
The ASHRAf sro,dord odd»s»abuilding envelope and system requi»menn lo.commercial burrdmgx»sideniial buildings hghe.Man Mree aronn,and felt or coated glass-fiber mot facers,which helps
sm:<adixaned buildings(wareAou».,ek).Il is Me noxoni model wndoN bs esnbF.Aig Meenegy pedwmanco rpui»menn ollhese building ypex eliminate ponding water.
•EFwgyGrwrdl-HD&HD Plus...
Coaled glass facer bonded to a polyiso foam core
The recommended insulation R-values for commercial
roofing continue to increase,which is good news providing
increased against high trafficand
for buildingowners lookingto save costs and p g g
help the evironment.States adopt these the elements.
recommendations at different speeds, °`-'�""
but the bottom line is that insulation �•„ro!y.°.'-" "-'fir They are designed for use in practically any low-
is becoming more important than O slope roof appPcation,including built-up roofs,
ever.EnergyGuord'"Polyiso Insulation modified bitumen,or most singleply roofing
is designed for use over structural roof .. ` systems All products met the requirements of ASTM
decks where R-values of 5.7 or higher C1289 Type II,Class 1,Grade 2 120 PSI),and
are required along with comprehensive available in Grade 3(25 PSI)and are both Factory
UL and FM approvals.Its also safer for' =Y�^
s ��,�.. Mural IFM)and Underwriters Lab JUL)approved. t y� `�
the environment,being manufactured =^'�.' '\�,;�� And because of its light weight,this material is £
with EPAcompliont blowing agents � s easy to handle on the job site and installs faster.
containing no CFCs or HCFCs as well \ Easier cutting in the field provides the installer with {"}
as having zero ozone depletion potential simplified fabricating on the roof deck.
(ODP)and virtually no global warming /
potential(GWP).
10 1
(1-800-7606-34111)POrig
Field fabrication of TPO accessories is time-consuming,costly,inconsistent,and can lead to unreliable details
Use EverGua rd p TPO Prefabricated Accessories that compromise a watertight roofing system.
For A Reliable, Watertight Roofing System often associated with prefabricated accessories can deliver oo 6ciotent productivity
and eliminatet 2 t*whileworry and problems
often associated with field fabrication.They can also boost productiviy up to 200%,'while reducing installed
cost by up to 12%compared to field-fabricating accessories.
WALKWAY ROLL CORNER CURB WRAP T JOINT COVER INSIDE CORNER
Heat welds directly to TPO Four standard sizes to flash curbs: Manufactured to
membrane or installed with that are 24'.36'.48',and 60' PATCHES accommodate inside
seam tape;available - (609.6,914.4,1,219.20,and - Conforming seal for use corners of base and '
in gray and yellow 1,524 mm)in size : over T-joints in 60 and •••••curb flashings
80 mil membrane
• : applications
POURABLE SEALER POCKET c `: SCUPPER
Structural foundation for EverOuard ........... •••••^......................... TPO ran be heal welded to e+
Pourable Sealant........................................................... the scupper,for a strong,
_,-.,,,.,,,...__,-•,,.2„ ✓ ........................secure installation
FLUTED CORNER SQUARE TUBE
.., For use in flashing outside - •••^••!•f•••••••�••••••°••• •••••••••••••• WRAP
comers of base and curb
flashings..................................................... .•............ ...� Tube wraps are split with
• � .• overlap to wrap around
square or rectangular
tubing;ensures a solid weld
UNIVERSAL CORNER Accommodates both inside PREFORMED
\\\
and outside corners of •�����••
base and curb flashings s Three SPLIT standard
sizes
accommodate most pipes '
and conduits
VENT ' PREFORMED
z
Limits air flow to one
director,avoiding: ...........VENT BOOT
.moisture buildup ••• ••.••• 1�[ Accommodates most T ,
11r' common pipes and
conduits from 1•to 6'
..................... .................. (25.4 to 152.4 mm)
TPO DRAIN..................... YELLOW
TPO can be heat welded directly to the
drain body,for secure installation SAFETY TAPE
Provides a warning to take
caution around potential
roof hazards
12 •lk:e .GAF aamok a liddlobrlcak 13
TPO', mit Id.
EverGuard° TPO Colors:
The Industry's Largest Selection of Color Membranes
GAF color TPO membranes can transform a traditional roof into an aesthetic attribute.
With standard colors,preformulated colors,and virtually unlimited custom colors,no other
single-ply or metal roofing manufacturer offers more color choices than GAF. _
Decorative color membranes can complement overall building aesthetics or shingled areas.
Most color choices include"Cool Color"technology,helping to increase reflectivity and
reduce energy costs.The pigments have been specially selected to minimize fading.
Standard Colors(no minimum order required)
Color shown:Patina GreO—
Energy Grog 322 Energy Ton 822 Gray 345 Tan 820 Whiro 920
Additional Colors*
NONE
Colonial Rd 185 Dark Bmnm 220 Dark B—229 Dana Ton 247 Color shown:Regal Red
MONOMER
OMMON XOfL Iris dikO I ,
fi,.Wd irrpo da—WOL
k
dlMiaM duo.f I
o�dmlaraar ram
e wmdeullM zrudmowul �
�no�:rr.��wl K� ■
amgr drama. r rr " ,■
Regal Rd 661 Slate Gray 740 Saoka Gray 765 Tool 812 Tam Cab 815 Tropical Green 825 ' � ��� r ■ �. ■r rr r
rrr ■ rr rrrr ■
Custom Colors Ave ilablel BAR �ymi� \ r ,� �r r r r ••
•mo�yva�m�am,m ode eq,�red.far n<,n-�ror�b�,�aroa yea i�l era sae Reprmm,a� r r ■
14 15
elm Guard
TP
O
ng Systems
These Critical Support Services Can Help To
Make Your Roofing Project A Success!
The Best Roofing Contractors Full-Time Field Services Team
GAF selects only 2 out of every 100 roofing Our nationwide team of
MASTER contractors for our factory-certified commercial Field Services Professionals
SELECT contractor program. We provide them with helps ensure that your new
�....�ti..�..�.�.�,-. extensive training tools and support to help roof is installed right the °
ensure proper material installation, improve first time. They are a full- -
their processes, and enhance their capabilities. time, professionally trained
GAF guarantees that include coverage for resource. Our team is a
workmanship are available through this elite trusted source for information installation training,
contractor force. and best-practice sharing to 61p prevent
problems before they happen.
Certified Maintenance Professional"
CMP'")and Sustainable Roofing Council Industry-Leading Guarantees
�. (SRC) Programs • Diamond Pledge'"NDL Roof Guarantee
r ° Having a maintenance program in place for your No dollar limit on your covera e; unlike
roofing asset is critical for not only optimizing its competitive guarantees, provides true
overall longevity and performance but also helping "edge-to-edge" coverage, with additional
ensure you have uninterrupted guarantee coverage leak coverage for penetrations and metal
if issues arise. GAF Certified Maintenance components.*
Professionals (CMPsj are contractors who have . WellRoof®Guarantee Extension...
not only the expertise to maintain and service
your roof but also the exclusive ability to extend Provides a 25% extension on a Diamond
our Diamond Pledge'" NDL Roof Guarantee b Pledge NDL Roof Guarantee when you
ROOFjN� 25%—via the WeIlRoof®Guarantee Extension participate in an annual inspection and
at no cost to you. Contact GAF Guarantee preventative maintenance program with a
'J Services for details.Also, benefit from working GAF Certified Maintenance Professional'
L n with a member of the Sustainable Roofing • All-American Pledgee'Roof Guarantee...
Council. Educated in emerging green practices The industry's only
such as membrane and insulation recycling,
guarantee that
LEED®, and the technology behind cool roofing, covers both steep ./ ® :-=__�,
EMS an SRC member is the right choice to install your and low slope
new cool roofing system. �inafi
ong projects
FNU
Tapered Design Group ne guarantee)osingle source
Tapered insulation provides a logical and accountability— 0 &W ME- F
TAPERED economical answer for roofs that do not permit and your
adequate positive drainage. When correctly convenience.*
installed, tapered insulation eliminates problems
DESIGN due to pondingg water, and can help extend Technical Help
GROUPthe longevity o}your low-slope roofing system. When It Matters
GAF's Tapered Design Group provides efficient
designs to reduce material costs and waste, Our 800-ROOF-411 hotline is available to
precise layouts & material calculations, fast turn- answer technical questions live. Our Technical
around times for close-approaching bid dates, team can answer questions regarding
and easy-to-read AutoCAD-generated shop installation, codes, product approvals, roof
drawings for a "hassle-free" installation. Contact system details, and other technical issues. They
the Tapered Design Group at tdg@gaf.com are a complete technical resource dedicated to
supporting proper roof installation.
Architectural Information Services *See applicable GAF roof guarantee for complete coverage and restrictions.
Arc h i tect u ra I Architects and specifiers can access an **Guarantees of 30 and 35 years do not qualify for WeIlRoof®Guarantee Extension.
I n fo r m a t i o n entire team devoted to assisting you with
AS E R V I C E S
the specification process. They can answer
questions and provide assistance with master
specification preparation and other valuable
activities at no charge to you. Call them toll free:
800-522-9224 or email AIS@GAF.com. 1-800-112MOOF-411
@2015 GAF 11/15-#420-1 Campus Drive,Parsippany,NJ 07054 gaf.CUm COMEG120
. �� Mason County Community Services
615 W. Alder St. Bldg 8 Receipt Number: 2019-03910
Shelton, WA 98584
360-427-9670 ext 352
Payer/Payee: CONTRACTORS ROOF SERVICE INC Cashier: NICOLE NORRIS Date: 08/15/2019
6406 43RD AVE CT NW Payment Type: CHECK(7217)
GIG HARBOR WA 98335
.............
s 000
Reroof- ROUTE 300 'i
STE 0-
Fee Description Account Fee Amount Amount Paid
Re-Roof Commercial Base Fee 001.000000.125.140 . 322.10.300000.0000.00 $190.00 $190.00
State Fee-Commercial 650.170010.000.000 . 389.30.300000.0000.00 $25.00 $25.00
COM2019-00085 TOTALS: $215.00 $215.00
TOTAL PAID: $215.00
Previous Related Payments
Total
Printed 08/15/2019 13:11:00 by Nicole Norris Page 1 of 1