Loading...
HomeMy WebLinkAboutBLD2019-00942 Final Replace Furnace and HP - BLD Inspections - 9/9/2019 .,ram Mason County iMason County - Division of Community Development - 615 W.Alder St. Bldg. 8 Shelton, WA 98584 - 360-427-9670 ext 352 www.co.mason.wa.us B DD2019-00942 MECH/PLUMB - RESIDENTIAL PROJECT DESCRIPTION: REPLACEMENT FURNACE&HEAT PUMP ISSUED: 08/27/2019 SITE ADDRESS: 141 E STONEBRIAR PL SHELTON EXPIRES: 02/23/2020 PARCEL: 321323290111 APPLICANT: ALANA R BLACK ET VIR OWNER: ALANA R BLACK ET VIR JUSTIN D STRICKLAND JUSTIN D STRICKLAND SHELTON,WA 98584-9793 SHELTON,WA 98584-9793 1.360.462.4332 GENERAL CONTRACTOR'S LICENSE: BLACK HILLS INC License: BLACKHI919DL 1003 85TH AVE SE SUITE A Expires: 03/15/2021 OLYMPIA,WA 98501 1.360.705.8590 FEES: Paid Due State Fee-Residential $6.50 $0.00 Mechanical Base Fee $30.00 $0.00 Final Inspection $80.00 $0.00 Mechanical Fees $38.00 $0.00 Totals : $154.50 $0.00 FIXTURES (fit Mechanical Fixtures 1.0000 Furnace(s) 1.0000 Heat Pump(s) REQUIRED INSPECTIONS Mechanical/Plumbing Final Inspection CONDITIONS Printed by:Genie Mcfarland on:08/27/2019 09:05 AM Page 1 of 2 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.,8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MECH/PLUMB - RESIDENTIAL BLD2019-00942 * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All furnace installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy code (WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth in the WSEC and international mechanical code. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: c Contractor or Aut on d Agent: Date: Printed by:Genie Mcfarland on:08/27/2019 09:05 AM Page 2 of 2 615 W.Alder St.Bldg 8,SHELTON,WA 98584 MASON COUNTY SHELTON:360-427-9670,EXT 352 COMMUNITY SERVICES BELFAIR:360-275-4467,EXT 352 Building,Manning,Environmental Health,Community Health ELMA:360-482.5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an inspection call or visit httpJ/www.co.mason.wa.usloommunity-ervices/bid-inspecUon.php Permit Number BLD2019-00942 Date Issued 08/27/2019 Issued By Project REPLACEMENT FURNACE&HEAT PUMP Site Address 141 E STONEBRIAR PL Applicant ALANA R BLACK ET VIR Contractor BLACK HILLS INC Contractor Phone 1.360.705.8590 Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type MECH/PLUMB-RESIDENTIAL Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. "THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.— PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee A Department Concrete Setbacks Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building . C Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other