HomeMy WebLinkAboutCOM2020-00100 Replace Antennas and Battery Cabinet - COM Permit / Conditions - 12/1/2020 Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton,WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
FPROJECT
0-00100 ADDITION OR REMODEL-
COMMERCIAL
DESCRIPTION: REPLACE ANTENNAS AND BATTERY ISSUED: 12/01/2020
ESS: 50 NE PENINSULA BLVD BELFAIR EXPIRES: 05/30/2021
PARCEL: 123213400030
APPLICANT: AT&T Johnson OWNER: S &J JOHNSON LLC
C/O GMA Network Services-PO Box 2006 PO BOX 488
BELLEVUE,WA98009 BELFAIR,WA 98528
425-269-5561
VALUATIONS: FEES: Paid Due
Project Valuation (BID, 25000.00 $25,000.00 Planning Commercial Review $380.00 $0.00
ESTIMATION..) Fee
Plan Check Fee $269.73 $0.00
Building Permit Fee $414.97 $0.00
State Fee-Commercial $25.00 $0.00
Technology Surcharge $13.69 $0.00
Total: $25,000.00 Totals : $1,103.39 $0.00
REQUIRED INSPECTIONS
Setback Inspection Rough- Plumbing Inspection
Footing Inspection Mechanical Inspection
Foundation Wall-Pre-Pour Inspection Insulation Inspection
Shearwall Inspection BLD-Final Inspection
Framing Inspection
CONDITIONS
" Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
Printed by:Kati Dooley on:12/01/2020 09:33 AM
Page 1 of 3
y
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg.8
IN
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
ADDITION OR REMODEL-COMMERCIAL COM2020-00100
* The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* The foundation/footing must be placed on undisturbed, firm-native soil.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a
permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor
& Industries (L&I).
For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-
4000.
Printed by:Kati Dooley on:12/01/2020 09:33 AM
Page 2 of 3
,
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton,WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
ADDITION OR REMODEL-COMMERCIAL COM2020-00100
* When parcel development requires direct access to county road(s),a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or
100 W Public Works Dr. Shelton.The building permit will not be finaled until the permit holder can show proof that the
access permit from Public Works has been finaled and approved.
* All property lines shall be clearly identified at the time of foundation inspection.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this
proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION.
* Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
1 hereby certify that 1 have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein o ot.The granting of a permit does not presume to give authority to violate or cancel
the provi other s ocal law regulating construction or the performance of construction.
Issued By:
� JP� ry "�� ���
Contractor or Authorized Agent: 12/01/2020
Date:
Printed by:Kati Dooley on:12/01/2020 09:33 AM Page 3 of 3
MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
COMMUNITY SERVICES SHELTON:360-427.9670,EXT 352
BELFAIR:360-275-4467,EXT 352
Buildly%Planning,Environmental Health,Community Health ELMA•360-482-5269,EXT 352
www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY"
To schedule an Inspection call or visit http://www.co.mason.wa.us/community-services/bld-inspection.php
Permit Number COM2020-00100 Date Issued 12/01/2020 Issued By l
Project Replace antennas and battery cabinet
Site Address 50 NE PENINSULA BLVD
Applicant AT&T Johnson
Contractor
Contractor Phone
Primary Code 2015
0 5 IBC,IRC,IFC,IEC,IMC,& Type
UP
Permit Type ADDITION OR REMODEL- Occupancy
COMMERCIAL
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
"THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED."
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
_ Final Building ,Z-z t )TL/
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
t to a Ve