HomeMy WebLinkAboutBLD2020-01214 Final MFG Home ADV2020-00125 - BLD Inspections - 7/30/2021 Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
B DD2020-01214 MANUFACTURED HOME
PROJECT DESCRIPTION: INSTALLATION OF NEW MFG HOME ISSUED: 01/26/2021
SITE ADDRESS: 170 NE SABER DR BELFAIR
EXPIRES: 07/25/2021
PARCEL: 123315100018
APPLICANT: BECK MICHAEL D OWNER: BECK MICHAEL D
PO BOX 3264 PO BOX 3264
BELFAIR,WA 98528 BELFAIR,WA98528
360.275.6240
CONTRACTOR: SOUTH SHORE CONSTRUCTION INC
230 E HILLSIDE DR
BELFAIR,WA98528
GENERAL CONTRACTOR'S LICENSE: SOUTH SHORE CONSTRUCTION License: SOUTHSCO16NL
PO BOX 963 Expires: 02/10/2022
BELFAIR,WA98528
360.275.0818
FEES: Paid Due
State Fee-Residential $6.50
Planning Review Fee $240.00 $0.00
Technology Surcharge $11.00
Building Plan Review/Change of $110.00 $0.00
Use- Onsite Sewage
Modular/Manufactured Home $275.00
Fee-2nd half collected at ready
to issue
Modular/Manufactured Home $275.00 $0.00
Fee- 1 st half collected at
submittal
Totals : $625.00 $292.50
REQUIRED INSPECTIONS
Setback Inspection Set-Up Inspection
Printed by:Kati Dooley on:01/26/2021 04:32 PM
Page 1 of 4
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
MANUFACTURED HOME BLD2020-01214
Footing Inspection BLD-Final Inspection
CONDITIONS
When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or
100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the
access permit from Public Works has been finale and approved.
• The foundation/footing must be placed on undisturbed,firm-native soil.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
" By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* If you are installing a manufacturing home and no longer have the installation manual for the home, you must use the
instructions of the American National Standards Institute (NCSBCS/ANSI A225.1).
* REQUIRED INSPECTIONS (Footing Inspection-prior to pour(set-up manual must be on-site), Set-up Inspection-prior to
skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required
inspections. If the required inspections are not requested, inspected and signed off(approved) by the inspector in the
prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by
the Mason County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable
practices or problems that have been discovered. Until resolution of any/all problems no occupancy (Final Inspection)will be
granted for the residence.
OWN ER/CONTRACTOR(indicate which)
All property lines shall be clearly identified at the time of foundation inspection.
Printed by:Kati Dooley on:01/26/2021 04:32 PM
Page 2 of 4
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
19 Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
MANUFACTURED HOME BLD2020-01214
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. "NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan.
Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
" Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
" All changes to "approved"building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* This permit is for the placement and installation of the manufactured home only and does not imply approval or review for
any other items indicated on the plot plan.
* Any retailer, manufacturer or contractor who installs a manufactured home warrants that the manufactured home is
installed in accordance with the State Installation code, chapter 296-150M WAC. All installers hired to do installation work
shall be certified manufactured home installers and shall be present to supervise the installation of all on-site work. An
Installer Tag shall be posted on site giving the certification number and signature of the certified installer responsible for each
major part of the installation. RCW43-63B.090
An approved Installer cerification tag shall be placed on the end of the manufactured home directly above or below the HUD
certification tag or temporarily located in plain site within three feet of the home's front entry. There shall be one certification
tag for each certified installer accounting for the work that each installer performed or installed. Certification number and
signature of the certified installer responsible for each major part of the installation. WAC365-210
Printed by:Kati Dooley on:01/26/2021 04:32 PM
Page 3 of 4
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
MANUFACTURED HOME BLD2020-01214
The installation permit shall be displayed in clear view of the site access road. The approved site plan and other
applicable instructions, including installation instructions, shall be available in this location OR placed in the location
specified by WAC 296-150M-655. Support configuration shall be clearly marked in the installation instructions.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of
3000 psi (IRC Table R402.2).
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* Owner/builder assumes all responsibility if drainfield/reserve area is encumbered.
A. Drainfield/ Reserve requires a 1Oft setback from all footing/foundations.
B. Septic tank(s)requires 5ft setback from all footing/foundations.
C. No foundation drains within 30ft, down gradient of drainfield/reserve area.
X
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provision f oth tate/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: ' Date:
Printed by:Kati Dooley on:01/26/2021 04:32 PM
Page 4 of 4
PI 2,o2b -012_)q --90,
RECEIVED
OCT 12 2020 G RES RVE PARCEL
123
615 W. Alder Street p A EA 31 51 00018
EXISTING
GARAGE
7
p NNING: 8.65'
ALL SACKS ARE MEASURED
Ft()M THE FURTHEST
ROJEC'TION OF THE BUILDING ARCEL
12331-51-00017 PROPOSED
PROP SED DRIVEWAY TANK o
PROVED'- T LANDING
-,� D PLANNING -
MASON CO tiT CD PLANN 5
SITE PLAN IRE Q ;IRED TO SE ON SITE T , t
CHANGE SUB E T T0 APPROVAL 33.000
z
— Date 0' PROPOSED
By 3 28" ..
48' X 28' M H
EXISTING
DRAINFIELD
00126 LANDING
42' 20'LJ f AD1(Zozo
DAVI D CYR 1 00 Z5
170 NE SABER DR
12331-51-00018 66.39'
SCALE 1"=20' NE SABER DRIVE
L E G E N D
39-0 1/4
WATER INLET
35-2 ❑ STANDARD
PANEL BOX FOO^_ING
29'-4 3/4•
xxsruurxex
34 1/4" eexuwL
N I DDOR
r — ��— — ——III ———7I� —— 1 NOTES:
Q-----D� Q J---- ` -------Q----- Q DESIGNED WIND ZONL
N I S'l'ANUAXU W1xU'LONE
AND IS TO BE USED
m
IN CONJUNCTION WITH
THE INSTALLATION
D
MANUAL AND ITS
SUPPLEMENTS.
6-6 2. FOOTINGS ARE
_ ® DRAIN OUTLET A-UNIT I SHOWN FOR EXAMPLE
35-2 1/8 ONLY. OUANTITY AND
SPACING MAY VARY
FLEX DUCT CONNECTION BASED ON PAD TYPE,
SOIL CONDITION,
ETC.
I I
3. FOOTING PADS i
PIERS ARE REQUIRED
AT SUPPORT POSTS.
SEE INSTALLATION
® B-UNIT MANUAL FOR REOUIRE-
MENUS.
26-4
FLEX DUCT CONNECTION I
L9 El R El
LQ-----Q-------D--El --- l -----El-------
❑-------
❑-il
38 1/9" 78 1/2•
nGOa WINDOW _7'-4 314" WOODBURN
210
PRMUCT—
48-0• EAGLE
MODEL N0.
CEIVED 289835
POST DATA R E NOTE 6 FOR FOUNDATION READY 44DME5 >RANIN6 rnlx
LIVE LOAD: 30 LBS. 30
LABEL LOCATION 3N=T PIER LOAD' BEARING CAPACITY OF NATURAL SOIL OR COMPACTED FILL SWILL EQIIALOR EXCEEDL500PSF. PIER LAYOUT
A A 3300
A B -OCT 1 2 2029 301 ROOF LOAD
B 14'-4" A 9100 LATERAL BEARING-LSO PSF.
B 14'-4" B >RAxx eT:
C 28'-10 3/4" A 4900 PER IBC(CDC)TABLE I806.2 Layton B.
>A
C 28'-10 3/4" B �/�� TE: 06/30/16
D 35'-4 3/4" A 6000 615 W. Alder Street THIS FOUNDATION SYSTEM HAS NOT BEEN DESIGNED TO RESIST LIPIDS FROM EXPANSNE SOILS,AND/OR ;NT uv
D 35-4 3/4" B - - 50Il5 OTHER THAN AS INDICATED INTHEIBC(CBC)TABlE1BD6.2,SCOUR,FLOOD HAZARDS,WATER PRESSURE
E 48'-0" A 3100
E 98'-0" B BY WIND OR WAVE ACTION,WIND SPEED LIP EFFECTS,FROST ACTION,HIGH GROLND WATER OROTHER SP.1E.1 C
•EMPTY PIER LOAD IS COlBIN-D IN NUMBER ABOVE NATURAL EVENT NOT NSTEDON THE ASSUMPTIONS
21EG28483S
� a
I�
Name ,(.+( Parcel# 12,331 -5) -66010 BLD# WO -61?N I
Mason County RECEIVED
Department of Community Development OCT
Small Parcel Stormwater Management Application/Worksheet a e 1 41#20
r treet
Per Mason County Code, Title 14, Chapter 14.48 a stormwater site plan is required whenever a building application is
made for residential development,or redevelopment',with more than 2,000 square feet of impervious surface 2.
'Redevelopment means,on an already developed site,the creation or addition of impervious surfaces, structural development
including construction,installation or expansion of a building or other structure,and/or replacement of impervious surface that is not
part of a routine maintenance activity,and land disturbing activities associated with structural or impervious redevelopment.
2Common impervious surfaces include,but are not limited to,rooftops,walkways,patios,driveways,parking lots or storage areas,
concrete or asphalt paving,gravel roads,packed earthen materials,and oiled,macadam or other surfaces which similarly impede the
natural infiltration of stormwater. Open,uncovered retention/detention facilities shall not be considered as impervious surfaces.
To Calculate Impervious Surfaces Please Complete This Table
Surface Type Length X Width = Area * All dimensions in feet
Buildings 48 X 28 = 1344
X = Measurements for buildings are taken at the
X _ perimeter of the farthest projections (example:
eaves/gutters)
X =
Driveways 90 X 12 = 1080
X = Length of drive begins at the right of way
X =
Parking Areas X =
X = Any paved, gravel or packed area per definition
above table
X =
Patios/V1/alks X =
X = Any paved, gravel or packed area per definition
above table
X =
Others X =
X = If the total impervious area of the proposed site
X = development is greater than 2000 square feet a
Small Parcel Stormwater Site Plan is Required
Total Impervious Surface Area (sum of all areas) 2424
If the Total Impervious Surface Area is LESS THAN 2000 Square Feet,please read, acknowledge and sign below.
Based Upon the information you have provided a Stormwater Site Plan IS NOT required for this development activity.
Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner,owner's legal representative,or the contractor. I
further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above-
described ropes , or revie ,and inspection as may be required.
X / Owner/Agen Contractor( ircle one)Date: 10/9/20
If the Total Impervious Surface Area is GREATER THAN 2000 Square Feet,please read, acknowledge and sign
the information provided on page 2 of 2.
Page 1 of 2
Name Parcel# BLD#
Mason County
Department of Community Development
Small Parcel Stormwater Management Application/Worksheet (page 2 of 2)
Based Upon the information you have provided a Stormwater Site Plan IS Required for this development activity.
Title 14,Chapter 14.48 of the Mason County Code(MCC)regulates compliance requirements for Stormwater
Management in this jurisdiction.A complete copy of the ordinance can be found on the Mason County website:
http//www.co.mason.wa—us/code/Commissioners/index.htm
Please follow the links to "Title 14, Chapter 14.48 Stormwater Management".
Regulated activities shall be conducted only after Mason County Public Works approves a stormwater site plan
(Mason County Code Title 14 Chapter 14.48 section 14.48.70).You will receive a copy of the Public Works document
entitled"Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan". This document will assist
you in preparing the necessary information and plans for Public Works to review and approve. Per Department of
Public Works this document will constitute an approved plan if all of the relevant details* are to be installed in
their entirety AND no part of the stormwater system adversely affects any septic system (see Environmental Health
information below). If an alternative system is to be used a plan will need to be submitted to Public Works for approval.
A design by a registered professional may be required for more complex sites.
*These details are found in the document Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan
on the pages that begin with"Handout"
PLEASE INITIAL BELOW TO INDICATE THE STORMWATER MANAGEMENT PLAN FOR THIS SITE
A)__V The relevant details from Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan will be installed
in their entirety AND the system will be located as not to adversely affect airy septic systems on this,or any other,parcel.
B) An alternative plan and/or professional design will be submitted to the Department of Public Works for approval AND the
system will be located as not to adversely affect any septic systems on this,or any other,parcel.
If you have further questions pertaining to parcel drainage and stormwater management Mason County's Public Works
Department can provide additional instructions,guidance and examples. (Section 14.48.130)contact Public works at:
Phone: (360)-427-9670 EXT.450
Mail: P 0 Box 1850, Shelton WA 98584
Physical: 415 N 6th St, Shelton WA 98584
If this development has,or will have,a septic/drainfield system you may need to contact Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this,or
any other,parcel.You may also wish to consult with the septic design professional involved with the project. Mason
County Division of Environmental Health can be reached at:
Phone: (360)-427-9670 EXT. 352
Mail: P 0 Box 1666,Shelton WA 98584
Physical: 426 W Cedar St, Shelton WA 98584
A condition will be added to the building permit that states,in part,that all conditions the stormwater site plan will be met
prior to a request for final inspection of the building permit.
Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or pernut revocation.
Acknowledgement of such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor. I
Further acknowledge that the Wormation provided is accurate and employees of Mason County are granted access to the above-
describe rope for and i pection as may be required.
X Owner/Agent/Contractor(circle one)Date.: 10/9/20
Page 2 of 2
v��uaiyu urveiupe w.�F4/t[uaa-y3b U-4L4G-tStly1-11yyt365AFC30
• MASON COUNTY COMMUNITY SERVICES Permit No: &1A'2jJM —GI Z 1q
PERM/TASSISTANCE CENTER:
•BUILDING•PLANNING•PUBLIC HEALTH•FIRE MARSHAL RFC
615 W.Alder Street, Shelton,WA 98584 VF
Phone Shelton:(360)427-9670 ext. 352•Fax:(360)427-7798 Phone O
Belfair. (360)275-4467•Phone E/ma:(360)482-5269 OCT �20
•
BUILDING PERMIT APPLICATION 6�S w q/de
20.
PROPERTY OWNER INFORMATION• CONTRACTOR INFORMATION: OOt
NAME: Michael Beck NAME:South Shore Construction
MAILING ADDRESS: PO Box 3264 MAILING ADDRESS: PO Box 963
CITY: Belfair STATE:WA ZIP:98528 CI'fy: Belfair STATE:WA ZIP:98528
PHONE 41: 3602756240 PHONE:3602750818 CELL: 3605091342
PHONE#2: EMAIL :southshore@q.com
EMAIL:mbeck_2@wavecable.com L&I REG#SOUTHSCO16NL EXP. 02/ 10 /2022
PRIMARY CONTACT: OWNER❑ CONTRACTOR V OTHER❑
NAME EMAIL
MAILING ADDRESS CITY STATE ZIP
PHONE CELL
Ams nihin
PARCEL INFORMATION:
PARCEL NUMBER(12 Digit Number) 12331-51-00018 ZONING RR5
LEGAL DESCRIPTION(Abbreviated) BEARDS COVE DIV 8 LOT:18 FIRE DISTRICT
SITE ADDRESS 170 NE Saber Drive CITY Belfair
DIRECTIONS TO SITE ADDRESS Head N onto WA-3 N for 21.8 Miles Turn left after Dairy Queen Grill&Chill(on the left) Turn left to stay on
WA-300 W 0.9 Miles turn right onto NE Sand Hill Rd 0.4 miles Turn left onto NE Larson Blvd 1 mile Turn left onto NE Saber Dr 410 feet destination
on the sett
IS THE PROJECT WITHIN 300 FT OF SLOPE(S)GREATER THAN 14%: YES❑ NON/ SNOW LOAD:2,5 psf
IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (Check all that apply):
SALTWATER ❑ LAKE ❑ RIVER/CREEK ❑ POND ❑ WETLAND ❑ SEASONAL RUNOFF ❑ STREAM ❑
TYPE OF WORK: NEW J/ ADDITION ❑ ALTERATION❑ REPAIR ❑ OTHER ❑
USE OF STRUCTURE(Residence,Garage,Commercial Bldg,Etc)Residence
IS USE: PRIMARY V SEASONAL ❑ NUMBER OF BEDROOMS 2 NUMBER OF BATHROOMS 2
HEATED STRUCTURE? YES(Whole Bldg) V YES (Part(sJofBldg ❑ NO❑
DESCRIBE WORK Install new MH for residential use
SQUARE FOOTAGE: (proposed)
1ST FLOOR 1344 sq.ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.ft. BASEMENT sq.ft.
DECK sq.ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq.ft.
GARAGE sq.ft. Attached❑ Detached❑ CARPORT sq.ft. Attached❑ Detached❑
MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED*
MAKE Fleetwood MODEL Eagle Z�gi3,5 YEAR 2020 48
LENGTH
WIDTH 28 BEDROOMS 2 BATHS 2 SERIAL NUMBER n/a
ENVIRONMENTAL HEALTH:
SEWAGE/SEWER SOURCE: SEPTIC SEWER ❑ / NEW ❑ EXISTINGV
PLUMBING IN STRUCTURE? YES V NO ❑ Ifyes, attach completed Water Adequacy Form
PERIMETER/FOUNDATION DRAINS PROPOSED? YES ❑ NOV EXISTING SQ. Fr.
EXISTING BEDROOMS 0 PROPOSED BEDROOMS 2 TOTAL BEDROOMS 2
OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by
signature below. I declare that I am the owner and I further declare that I am entitled to receive this permit and to do the work as proposed. I have
obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project. The owner or legal
representative, represents that the information provided is accurate and grants employees of Mason County access to the above described property
and structure(s)for review and inspection. This permit/application becomes null&void if work or authorized construction is not commenced within 180
days or if construction work is suspended for a period of 180 days.
PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS
PERMIT APPLICATION OF 180 DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED. (MASON
Do usi9ned by: COUNTY CODE 14.08.42)
b(A 10/5/2020
Signature of OWNER(Must be signed by the OWNER) Date
DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS
BUILDING DEPARTMENT
PLANNING DEPARTMENT
FIRE MARSHAL
PUBLIC HEALTH
MASON COUNTY Mason County Permit Center Use:
COMMUNITY SERVICES
ADv _ 00)ZS
Building,Planning,Environmental Health,Community Health
615 W.Alder St.—Bldg.8,Shelton,Wa 98584 Date Rcvd '� �Z zz
Phone:(360)427-9670 ext.352 ♦Fax:(360)427-7798
Fee: $130.00
Request for Administrative Variance for
Reduction in the Required Setbacks PLANNING
For administrative review, the minimum variance on a setback request is 5 feet from the side yard lot
lines and 10 feet for front and rear lot lines or any access easement. Request for further reduction
requires a standard variance. Setbacks are measured from the furthest projection of the structure,
including roof eaves and gutters. n
Applicant/Owners:
Mailing Address:
City:�`-�- -A State: W P\ Zip: S
Telephoner
Email: �7 y e • cowl Oct 12?42
61 . VV Alder 0
If this reduction is tied to a building permit, please give permit case number. `Street
BLD Zola - 012ig
Parcel Number(s): I n Jli l -S 1 ' V o L lb Zoning
Site Address: k__1 (D LANES a' be�r Dr'
Requested setback variance:
ft. -Front ❑ Rear ❑ Side
ft ❑ Front ❑ Rearide
ft. ❑ Front ❑ Rear ❑ Side
ft ❑ Front ❑ Rear ❑ Side
Front Setbacks—From access easements and road right of ways. Minimum 10 feet.
Rear Setbacks—From the rear property line. Minimum 10 feet.
Side Setbacks—From the side property line. Minimum 5 feet except for certain shoreline designations.
An illustrated site plan is required.
Your site plan must show the following: north arrow, abutting street or easements, and set backs to all
property lines and existing buildings, slopes, surface water, wetlands, critical areas, septic, well and
driveway. Show all proposed new development.
FRONT AND OR REAR YARD REDUCTION REQUESTS:
For existing lots of record as of March 5, 2002;
You must meet one of the following:
1) One of the following exists on the lot(check all that apply):
❑ a) steep slopes, wetlands, or streams present;
❑ b) soils that restrict building or septic development;
❑ c) lot width at the front yard line of no more than 50 feet;
❑ ArTot size of no more than one-fourth acre;
e) existing improvements of buildings, septic systems, and well areas.
SIDE YARD REDUCTION REQUESTS:
For existing lots of record as of March 5, 2002;
You must meet one of the following:
2) One of the following exists on the lot(check all that apply):
❑ a) steep slopes, wetlands, or streams present;
❑ b) soils that restrict building or septic development;
❑ c) lot width at the front yard line of no more than 50 feet;
El lot size of no more than one-half acre;
e) existing improvements of buildings, septic systems, and well areas.
Explain how these circumstances preclude a reasonable development proposal from meeting the
setback standard for Rural Residential 2.5, 5, 10, or 20 zones.
Own /Agent ( lease indicate) A C) rZ [�
S gnat - Date
Official Use Only
Approved by: Date "
Denied b Date
Reason for denial: