Loading...
HomeMy WebLinkAboutCOM2021-00035 Final Change in Tenant and Construction - COM Permit / Conditions - 6/23/2021 � e Mason County Mason County - Division of Community Development _ 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us F 1-00035 NEW COMMERCIAL PERMIT ESCRIPTION: CHANGE IN TENANT &CONSTRUCTION — ISSUED: 05/04/2021 AND TO COFFEE STAND W/REVISIONS ESS: 23840 NE STATE ROUTE 3 BELFAIR EXPIRES: 10/31/2021 PARCEL: 123294100160 APPLICANT: MEKENZIE STEVENS OWNER: MEKENZIE STEVENS P O BOX 2626 P O BOX 2626 BELFAIR,WA 98528 BELFAIR,WA98528 1.360.801.5906 GENERAL CONTRACTOR'S LICENSE: CUSTOM CUT CARPENTRY LLC License: CUSTOCC824QO P O BOX 2626 Expires: 11/20/2022 BELFAIR,WA98528 1.360.551.8826 VALUATIONS: FEES: Paid Due Project Valuation (BID, 8000.00 $8,000.00 IFC Plan Check Fee $80.00 $0.00 ESTIMATION..) Building Permit Fee $153.17 $0.00 Planning Commercial Review $380.00 $0.00 Fee State Fee-Commercial $25.00 $0.00 Plan Check Fee $80.00 $0.00 Technology Surcharge $4.66 $0.00 Water Adequacy Review $120.00 $0.00 Building Plan Review/Change of $120.00 $0.00 Use-Onsite Sewage Total: $8,000.00 Totals : $962.83 $0.00 FIXTURES City Plumbing Fixtures 1.0000 SINK-3 WITH DRAIN REQUIRED INSPECTIONS Printed by:Kate Campbell on:05/04/2021 09:25 AM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2021-00035 Framing Inspection Insulation Inspection Rough-Plumbing Inspection BLD-Final Inspection CONDITIONS " Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. " All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. " Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. " All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. " REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * The foundation/footing must be placed on undisturbed, firm-native soil. " Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. Printed by:Kate Campbell on:05/04/2021 09:25 AM Page 2 of 3 l " Mason County Mason County - Division of Community Development � 615 W.Alder St. Bldg.8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2021-00035 " All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to p rmit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property I ords on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * A grease trap properly sized pursuant to the Uniform Plumbing Code is required. Ref Plans for specific requirement/s. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the proviWsfy r state/local law r u ng construction or the performance of construction. Issued B Contractor or Authorized Agent: Date: /.uZ Printed by:Kate Campbell on:05/04/2021 09:25 AM Page 3 of 3 MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 19 COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352 BELFAIR:360-275-4467,EXT 352 Building.Plaming.Environmental Health,Community Health ELMA:360-482-5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php Permit Number COM2021-00035 Date Issued 05/04/2021 Issued Project CHANGE IN TENANT &CONSTRUCTION-COFFEE STAND TO COFFEE STAND W/Revisi Site Address 23840 NE State Route 3 Applicant MEKENZIE STEVENS Contractor CUSTOM CUT CARPENTRY LLC Contractor Phone 1.360.551.8826 Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type NEW COMMERCIAL PERMIT Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. "THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED." PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing $--ZK-2( J 7-- Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other $-.-? Lq"z-( �I-*-T �'i,t Vt ,>,�,L e-,C� � (?.Gv.l T's.-F[Jvr f a.n d� !✓l�i�1'�( 04,t(714 140 �+ r G e�'4'e 4- o _At -tea.,,. C n LI-LV p✓ r �(✓,v C p w tKe(u�