HomeMy WebLinkAboutCOM2021-00016 Final Youth Drop In Center - COM Permit / Conditions - 5/17/2021 � a
Mason County
Mason County - Division of Community Development
gym,
615 W.Alder St. Bldg.8
Shelton,WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
F
1-00016 CHANGEINTENANTESCRIPTION: OPENING A BELFAIR YOUTH DROP IN ISSUED: 05/17/2021ESS: 23291 NE STATE ROUTE 3 BELFAIR EXPIRES: 11/13/2021
PARCEL: 123325000920
APPLICANT: Kirchoff, Susan OWNER: RWJJ INC
PO Box 2302 PO BOX 2582
Shelton,WA 98584 BELFAIR,WA98528
3604620125
FEES: Paid Due
Change in Tenant- Minor EH $120.00 $0.00
Plan Review
State Fee-Commercial $25.00 $0.00
Change in Tenant Application $156.00 $0.00
Technology Surcharge $3.12 $0.00
IFC Plan Check Fee $78.00 $0.00
Totals : $382.12 $0.00
REQUIRED INSPECTIONS
BLD-Final Inspection
CONDITIONS
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
Printed by:Kate Campbell on:05/17/2021 10:27 AM Page 1 of 2
c ,
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton,WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
CHANGE IN TENANT COM2021-00016
* Lever hardware is required at doors. The unlatching of any door shall not require more than ONE operation. Hardware with
locks must open with a single action from the egress side of the door. Door hardware shall allow egress doors to be readily
open able from the egress side without the use of a key or special knowledge or effort. Handles, pulls, latches, locks and
other operable parts on accessible doors shall have a shape that is easy to grasp with one hand and does not require tight-
grasping, pinching, or twisting of the wrist to operate. X
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not
allowed without the approval of the Mason County Fire Marshal.
* If construction or remodeling is proposed an additional Building Permit and construction documents/drawings may be
required.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
1 hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of permit does not presume to give authority to violate or cancel
the provi io f othe state/I aw regulating construction or the performance of construction.
Issued B .
Contractor or Authorized Agent: Date:
Printed by:Kate Campbell on:05/17/2021 10:27 AM Page 2 of 2
MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352
BELFAIR:360-275-4467,EXT 352
Building Plnnnin%Envkmmentel Heohh,CommunityHeeBh ELMA:360-482-5269,EXT 352
www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit hftp://www.co.mason.wa.us/community-services/bid-inspectio%php
Permit Number COM2021-00016 Date Issued 05/17/2021 Issued
Project Opening a Belfair youth drop in center
Site Address 23291 NE State Route 3
Applicant Kirchoff,Susan
Contractor
Contractor Phone
Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type
Permit Type CHANGE IN TENANT Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED..**
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks / Setup
Home
Concrete Foot/Runners Final
Other