Loading...
HomeMy WebLinkAboutBLD2021-00149 Final Demo of Carport - BLD Permit / Conditions - 4/26/2021 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us B DD2021-00149 DEMO PROJECT DESCRIPTION: DEMO OF CARPORT ,CEMENT RETAINING ISSUED: 02/03/2021 WALLS AND ATTACHED TOOLSHED SITE ADDRESS: 1071 NE COLLINS LAKE DR TAHUYA EXPIRES: 08/02/2021 PARCEL: 223315000041 APPLICANT: Flanig,Jody OWNER: FLANIG BENJAMIN F&JODY L 1071 Collins Lake Drive 2522 N LAFAYETTE Tahuya, WA98585 BREMERTON,WA98312 3606204698 FEES: Paid Due Demolition Fee $120.00 $0.00 State Fee-Residential $6.50 $0.00 Technology Flat Convenience $5.00 $0.00 Fee Totals : $131.50 $0.00 REQUIRED INSPECTIONS Demolition Final Inspection CONDITIONS OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. * The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire. Printed by:Amber Seiby on:02/04/2021 06:38 PM Page 1 of 2 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us DEMO BLD2021-00149 All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * For public safety, it is the responsibility of the applicant to confirm through written verification all utility services (electric, gas, water, sewer, ...) have been terminated prior to demolishing a structure. * The demolition and disposal of demolition debris must meet requirements as per Mason County regulations. it is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing materials have been removed from the area to be demolished. work shall not commence on an asbestos project or demolition unless the owner or operator has obtained written approval from ORCAA @ 2490 B Limited Lane NW, Olympia WA 98502, 360-586-1044, 800-422-5623, www.orcaa.org * All construction and demolition debris must be removed from the beach after project completion. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions a y other state/local law regulating construction or the performance of construction. Issued By• Contractor or Authorized Agent: Date: Printed by:Amber Selby on:02/04/2021 06:38 PM Page 2 of 2 v 0 0 D m � z n m X � � z sm m X °o m n r_ -a 0 C) r N.) W Z z z w_ N 'p' N C1i o N_ m m o 0 z o 0 D K Z z n M M %_ L O D r< m r m r` n M v 0 cn v v X M v Z D �T y X in y m m Q � -i C. CD V N v y 6, N Cl) o o cn M z n ;a n NWcn 0 r M m 0 - a0 n �_ Cl) I cn � m 0 CD PO 0 z 0 o O 1 P co s= Z Z m cD cn a�z 0 m En cn Np z Z ° rn D � o v O 7 00 cn 00 CD a) 3 m z Co CD2 � :7 m m D 2 = O O � 00 � z z a m m 00v n o 3 9 n. m o N o CD a iu! 1 I II 4 ti 0 0? LI r� �r a 1 ,.• t i J ,y + M e I � I p 1 i -gal Fu r u �1 o ' rlii� Or ti i Y` p P I � a �1