HomeMy WebLinkAboutBLD2020-01512 MFG Home - BLD Permit / Conditions - 1/28/2021 Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
B DD2020-01512 MANUFACTURED HOME
PROJECT DESCRIPTION: ISSUED: 01/28/2021
SITE ADDRESS: 920 E MOUNTAIN VIEW DR TAHUYA
EXPIRES: 07/27/2021
PARCEL: 223195000133
APPLICANT: MCMICHAEL DAVID J&BELINDA J OWNER: MCMICHAEL DAVID J &BELINDA J
302 106TH ST S 302 106TH ST S
TACOMA,WA 98444 TACOMA,WA98444
253-302-1722
FEES: Paid Due
Technology Surcharge $11.00 $0.00
Planning Review Fee $240.00 $0.00
Modular/Manufactured Home $275.00 $0.00
Fee-2nd half collected at ready
to issue
State Fee-Residential $6.50 $0.00
Building Plan Review/Change of $110.00 $0.00
Use-Onsite Sewage
Modular/Manufactured Home $275.00 $0.00
Fee- 1st half collected at
submittal
Totals : $917.50 $0.00
REQUIRED INSPECTIONS
Setback Inspection Set-Up Inspection
Footing Inspection BLD-Final Inspection
CONDITIONS
* The installation permit shall be displayed in clear view of the site access road. The approved site plan and other
applicable instructions, including installation instructions, shall be available in this location OR placed in the location
specified by WAC 296-150M-655. Support configuration shall be clearly marked in the installation instructions.
Printed by:Kati Dooley on:01/28/2021 10:48 AM
Page 1 of 4
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
19 Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
MANUFACTURED HOME BLD2020-01512
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of
3000 psi (IRC Table R402.2).
* This permit is for the placement and installation of the manufactured home only and does not imply approval or review for
any other items indicated on the plot plan.
" When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or
100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the
access permit from Public Works has been finaled and approved.
By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. "NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan.
Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
Printed by:Kati Dooley on:01/28/2021 10:48 AM
Page 2 of 4
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
MANUFACTURED HOME BLD2020-01512
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* REQUIRED INSPECTIONS (Footing Inspection-prior to pour(set-up manual must be on-site), Set-up Inspection-prior to
skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required
inspections. If the required inspections are not requested, inspected and signed off(approved) by the inspector in the
prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by
the Mason County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable
practices or problems that have been discovered. Until resolution of any/all problems no occupancy (Final Inspection)will be
granted for the residence.
OWN ER/CONTRACTOR(indicate which)
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* If you are installing a manufacturing home and no longer have the installation manual for the home, you must use the
instructions of the American National Standards Institute (NCSBCS/ANSI A225.1).
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* The foundation/footing must be placed on undisturbed, firm-native soil.
Printed by:Kati Dooley on:01/28/2021 10:48 AM
Page 3 of 4
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
MANUFACTURED HOME BLD2020-01512
Any retailer, manufacturer or contractor who installs a manufactured home warrants that the manufactured home is
installed in accordance with the State Installation code, chapter 296-150M WAC. All installers hired to do installation work
shall be certified manufactured home installers and shall be present to supervise the installation of all on-site work. An
Installer Tag shall be posted on site giving the certification number and signature of the certified installer responsible for each
major part of the installation. RCW43-63B.090
An approved Installer cerification tag shall be placed on the end of the manufactured home directly above or below the HUD
certification tag or temporarily located in plain site within three feet of the home's front entry. There shall be one certification
tag for each certified installer accounting for the work that each installer performed or installed. Certification number and
signature of the certified installer responsible for each major part of the installation. WAC365-210
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/d itch ing system or road way.
" All property lines shall be clearly identified at the time of foundation inspection.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
" Horizontal setbacks per WAC246-272A-0210 must be maintained, unless prior approval is obtained
• Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered.
A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations.
B.) Septic tank(s) requires 5ft setback from all footing/foundations.
C.) No foundation/Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area.
D.) No Cut Bank(s) (greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions o Laws and Ordinances governing this type of work will be complied with whether
specified herei or\n ot. The granting of a permit does not presume to give authority to violate or cancel
the provision o nY other to/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: AZZ-Z Date: '- Ze Z°Z%
Printed by:Kati Dooley on:01/28/2021 10:48 AM
Page 4 of 4
MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352
BELFAIR:360-275-4467,EXT 352
Buildlri%Pl in%Environmental Health,CommunityHaaith ELMA•360-482-5269,EXT 352
www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY"
To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bld-inspection.php
Permit Number BLD2020-01512 Date Issued 01/28/2021 Issued
Project
Site Address 920 E MOUNTAIN VIEW DR
Applicant MCMICHAEL DAVID J&BELINDA J
Contractor
Contractor Phone
Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type
Permit Type MANUFACTURED HOME Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
*"THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED."
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks .�, Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
ManufacturedHome Setbacks ,,L` Setup KIN
-Concrete Foot/Runners _ - Final L1, L(
Other
':>1�\-Zv\S4LA�
RECEIVED
bv 1 ryeA ch04L- "_ focDEC 14 2020
91a esE wi, \1 r- �� � ' o E�45 W.IA�Ider Street
A,kjQ Wash. 919W
NG
C Z537 302- -17zz
� ,2z319 -50- 001331 t3L( LA�� N 1N G
4L SE-i-BACKS ARE MEASURED
! rROaV—1 HE FURTHEST �
t�P��v,uf'�•� : 133.-$L =yak' c rt�. ECT10N OF THE gUILD(NG ram;
Res a rye. S U— u s �r;x,�,•u�.� 3'7
v E4
r�i Z
f
/ Fc><,� uk.L i�.rRxK.���It-ia�• F_ -•,•,,.fir
5D"
y '
4,1
AMTMONY OWEN OEWERO f 616
xciHes i au `•.
»—M'c %S OA J I r ccc5'9 Porl- v, C.
poglp 7-p",IC, x!'s'�i s�'..yrcJ�7C'.7�.rfjIncN areC�rE L.
/z-doc�r, 46��e i�ir,J�c��r•
APPROVED
MASON COUNTY DCD PLANNING
SITE PLAN REQUIRED TO BE ON SITE
CHANG S SUBJECT TO APPROVAL
__ Date
Printed from Mason County DM )
Printed from Mason County DMS
♦��Fn�ry'dka. 1'a. F-.k"' c - t-r' `�1''I+ai. �9 '�'t$� �7��„✓�"Br`3i �c fi''.�„•-�w. + �� ,� s«.b.r...ss�-++,..^..'s' '7 �`
X J ��h rl rr^-r i*�x� ' ''xJ�r'+,r.� - �g`i-c'._��"",t"�r��•rt L`'L tr �<.�, '��'T� aid � .. -
DEC 14 i1
615 W. Aker
OD 1
;0
PLANNING
SIX10 NX44 W
!�"1��/�� i 'ail■///i
1�■■■
OPT. UrILITY LAYOUF
-
DMW
PORCH
V �m Q\6■■r��I�[7�Rii�� f
■■■iL■/■ ��'���A��'i\\i■/i/ ■■
1■ /■ I!!I/�'�/■1 1/■■//�■■
,l AL .�,-,-- - •;i1/iii+
�■■1 Ir �■ ll! , ■■■■■■r
P
'all I MAL
Lm
iR�11
1■ ■■ ■
�■■I■1 1 ,, imsup IMY OPT. CLO
rll�
DPF. BATH OPT, UTMW
F
Mason County Community Services-Building Division
615 WAlder Street, Shelton WA 98584
www.co.mason.wa.us
2018 Washington State Energy Code—Residential
Prescriptive Energy Code Compliance for All Climate Zones in Washington
Single Family New&Additions effective February 1,2021
These requirements apply to all IRC building types, including detached one-and two-family
dwellings and multiple single-family dwellings(townhouses).
contact Information Project information
Owners Name: Site Address:
Mailing Address:
Parcel Address:
Instructions:This single-family project will use the requirements of the Prescriptive Path below and
incorporate the minimum values listed. Based on the size of the structure, the appropriate number of
additional credits are checked as chosen by the permit applicant.
Provide all information from the following tables as building permit drawings:Table R402.1- Insulation and
Fenestration Requirements by Component,Table R406.2- Fuel Normalization Credits and 406.3- Energy Credits.
- ......... .........
Authorized Representative Date
... ........._ -
_ All Climate Zones(Table R402.1.1)
R-Value a U-Factor a
Fenestration U-Factor b n/a 0.30
Skylight U-Factor b n/a 0.50
Glazed Fenestration SHGC bye n/a n/a
Ceiling' 49 i 0.026
Wood Frame Wall g h 21 int 0.056
Floor 30 0.029
Below Grade Wall c h 10/15/21 int+TB 0.042
Slab d-f R-Value&Depth 10,2 ft n/a
R-values are minimums.U-factors and SHGC are maximums.When insulation is installed in a cavity that is less
a than the label or design thickness of the insulation,the compressed R-value of the insulation from Appendix
Table A101.4 shall not be less than the R-value specified in the table.
b The fenestration U-factor column excludes skylights.
"10/15/21+STB"means R-10 continuous insulation on the exterior of the wall,or R-15 continuous insulation on
the interior of the wall,or R-21 cavity insulation plus a thermal break between the slab and the basement wall at
c the interior of the basement wall."10/15/21+5TB"shall be permitted to be met with R-13 cavity insulation on
the interior of the basement wall plus R-5 continuous insulation on the interior or exterior of the wall."5TB"
means R-5 thermal break between floor slab and basement wall.
d R-10 continuous insulation is required under heated slab on grade floors.See Section R402.2.9.1.
For single rafter-or joist-vaulted ceilings,the insulation may be reduced to R-38 if the full insulation depth
e extends over the top plate of the exterior wall.
R-7.5 continuous insulation installed over an existing slab is deemed to be equivalent to the required perimeter
f slab insulation when applied to existing slabs complying with Section R503.1.1.If foam plastic is used,it shall
meet the requirements for thermal barriers protecting foam plastics.
For log structures developed in compliance with Standard ICC 400,log walls shall meet the requirements for
g climate zone 5 of ICC 400.
Int.(intermediate framing)denotes framing and insulation as described in Section A103.2.2 including standard
h framing 16 inches on center,78%of the wall cavity insulated and headers insulated with a minimum of R-10
insulation.
Each dwelling unit in a residential building shall comply with sufficient options from Table R406.2 (fuel
normalization credits) and Table 406.3 (energy credits) to achieve the following minimum number of
credits. To claim this credit, the building permit drawings shall specify the option selected and the
maximum tested building air leakage and show the qualifying ventilation system and its control sequence
of operation.
1. Small Dwelling Unit: 3 credits
Dwelling units less than 1,500 sf in conditioned floor area with less than 300 sf of fenestration area.
Additions to existing building that are greater than 500 sf of heated floor area but less than 1,500 sf.
2. Medium Dwelling Unit: 6 credits
All dwelling units that are not included in#1 or#3
3. Large Dwelling Unit: 7 credits
Dwelling units exceeding 5,000 sf of conditioned floor area
4. Additions less than 500 square feet: 1.5 credits
All other additions shall meet 1-3 above
Before selecting your credits on this Summary table, review the details in Table 406.3 (Single Family),on page 4.
-- - _
Summary of Table R406.2
_ ....... ....._ .._..... ...._....
Heating Credits-select ONE
Fuel Normalization Descriptions tions User Notes
Options; heating option
1 Combustion heating minimum NAECAb 0.0 ❑
_ _ .......... .......__ ........_ .. ....... ........ ................---
2 Heat pump` 1.0 ❑ i
3 Electric resistance heat only-furnace or zonal -1.0 ❑
4 1 DHP with zonal electric resistance per option 3.4 0.5 El
--- --- -
5 All other heating systems -1.0 ❑
Energy Credit Option Descriptions energy optionselect ONE
Energy Credits-
Options from each
- category
1 1 Efficient Building Envelope 0.5 ❑
-. ... ....... ......... ....------- ...-.._ _.. .... ......._} .........
1.2 Efficient Building Envelope 10 ❑
i__.......................................... ........ ....... ....__._.......__......--....._......_....._...... _ ........ ......... .__ .__ ...
1.3 Efficient Building Envelope i 0.5 ❑
14 Efficient Building Envelope 1.0 ❑
_..---._......__..._..._........--' -_._...... _._..._..__....._.._..-'---- -- -' -
15 j Efficient Building Envelope 2.0 ❑
1.6 Efficient Building Envelope . _ ................-0.5_............... _..................❑...................i................---._.._.._._..._-........................
_.__........._.......
2.1 Air Leakage Control and Efficient Ventilation 0.5 j ❑
g......... __.._.. -._......_........_.....__._._...._...,.._..._............ ........_.... _ --._............_.__.._...-....-' '- -'-..................
-
2.2 Air Leakage Control and Efficient Ventilati.................... - _.. __ ......... ..---- --..............---...._....
2.3 (Air Leakage Control and Efficient Ventilation 1.5 ❑
2.4 Air Leakage Control and Efficient Ventilation 2.0 ❑
_....................................... ........ .........._._..........._...._.......................__.._ __._._.._.........................._.__................................................._._-.._._.__-...__....._._......._' ---.........._..__.._._.__..............
_.
3.11 High Efficiency HVAC 1.0.. ; ❑
-............................................................_.._..... ---._........._..-- .__......................._....... --j-.._.__.._. _ _......................-............................................ ----------------._..----_._
3.2 High Efficiency HVAC ---......_...... .... 1.0 ❑ _............._...._..... --......._
_-. ....................._.._......_.........._........_...... -- --' ---- .-._.........._....-- - ---..............._..._._........--'-'-.._...... -_.._
3.31 High Efficiency HVAC 1.5 ❑
3.4 H":hEfficiencyHVAC
h Efficiency HVAC -_ ! 1.5 ❑
.. '--...... --- --.....__._.._a._............_.' - '--- ---........._...._... y
3 5 -1.5 ❑
3.6' !Hi h EfficiencyHVAC 2.0 ❑
.. g
4.1 I
- High Efficiency HVAC Distribution System.......__...._._....._..........._...._.._............__0..5.._--._..._........_0 I
4.2 f Hi h Efficient HVAC Distribution S stem ! 1.0 ❑_......._.. ___._._.._..........................._..--____.... ____
_............._......_..........._g............................_............_y......._....._....._..............................................._...._.._y............._..._..........__............................
Prescriptive Path-Single Family 2018 Washington State Energy Code-R 2
......... _ .........
Summary of Table R406.2(cont.)
Energy Credits-select ONE
Energy Credit Option Descriptions(cont.) energy option from User Notes
Options each category d
- - —_ -
5.1d Efficient Water Heating 0.5 ❑ _ _
5.2 Efficient Water Heating1 0.5 i ❑
- ...._.........._._._._...._._._.._......_.........._.................._..........._...._...._............................_....._._..._............— .._.._............_...._.............. .._...._.............._._._.............................;........__...... ....................._I_... -__..._......._—_—..._........_...._------ --..._......._...---
5.3 Efficient Water Heating 1.0 ❑
_............................................................................................................................................_..--..... .........._-............_.........._.._...-_....._.................................................... - ...._...._.........................t......_._._..............__....-........._._........................_.............................................._.
5.4 Efficient Water Heating 1.5 ❑
5.5 Efficient Water Heating 2.0 ❑
- ....._.._.._._............_.._....... _--_..-------
Efficient Water Heating 2.5 ❑5. ,
.... ......... ....._. _.__.... _ . .. ----- .. y ---
6.1 'Renewable Electric Energy(3 credits max) I 1.0 ❑
_ _... ......
7A Appliance Package 0.5 ❑
_._._� - -
_.._. ...............
Total Credits
......... _
a. An alternative heating source sized at a maximum of 0.5 W/sf(equivalent)of heated floor area or 500 W,
whichever is bigger, may be installed in the dwelling unit.
b. Equipment listed in Table C403.3.2(4)orC403.3.2(5)
c. Equipment listed in Table C403.3.2(1)orC403.3.2(2)
d. You cannot select more than one option from any category EXCEPT in category 5.Option 5.1 may be combined
with options 5.2 through 5.6.See Table 406.3.
e. 1.0 credit for each 1,200 kWh of electrical generation provided annually, up to 3 creditsmax.
See the complete Table R406.2 for all requirements and option descriptions.
Please print only pages 1 through 3 of this worksheet for submission to your building official.
Prescriptive Path—Single Family 2018 Washington State Energy Code-R 3
Table 406.3—Energy Credits(Single Family)
Option Description Credits:SF
1.EFFICIENT BUILDING ENVELOPE OPTIONS
Only one option from Items 1.1 through 1.7 may be selected in this category.
Compliance with the conductive UA targets is demonstrated using Section R402.1.4,Total UA alternative,where[1-
(Proposed UA/Target UA)] >the required%UA reduction.
Prescriptive compliance is based on Table R402.1.1 with the following modifications:
1.1 Vertical fenestration U=0.24 0.5
___......._.... ........ - - _
Prescriptive compliance is based on Table R402.1.1 with the following modifications:
1.2 Vertical fenestration U=0.20 1.0
_.._ ....---_. _ __ .. ......; _
Prescriptive compliance is based on Table R402.1.1 with the following modifications: i
Vertical fenestration U=0.28
Floor R-38
1.3 Slab on grade R-10 perimeter and under entire slab below grade slab R-10 perimeter and 0.5
under entire slab or
__.
Compliance based on Section R402.1.4: Reduce the Total conductive UA by 5%
Prescriptive compliance is based on Table R402.1.1 with the following modifications: r
Vertical fenestration U=0.25
Wall R-21 plus R-4 ci
Floor R-38
1.4 Basement wall R-21 int plus R-5 ci 1.0
Slab on grade R-10 perimeter and under entire slab Below grade slab R-10 perimeter and
under entire slab or
Compliance based on Section R402.1.4: Reduce the Total conductive UA by 15%
- - - - _ _;
Prescriptive compliance is based on Table R402.1.1 with the following modifications:
Vertical fenestration U=0.22
Ceiling and single-rafter orjoist-vaulted R-49 advanced
Wood frame wall R-21 int plus R-12 ci Floor R-38
1.5 Basement wall R-21 int plus R-12 ci 2.0
Slab on grade R-10 perimeter and under entire slab Below grade slab R-10 perimeter and
under entire slab or
j Compliance based on Section R402.1.4: Reduce the Total conductive UA by 30%
i Prescriptive compliance is based on Table R402.1.1 with the following modifications:
Vertical fenestration U=0.18
Ceiling and single-rafter or joist-vaulted R-60 advanced
Wood frame wall R-21 int plus R-16 ci
1.6 Floor R-48 3.0
Basement wall R-21 int plus R-16 ci
Slab on grade R-20 perimeter and under entire slab Below grade slab R-20 perimeter and
under entire slab or
Compliance based on Section R402.1.4: Reduce the Total conductive UA by 40%.
Advanced framing and raised heel trusses or rafters
i
Vertical Glazing U-0.28
1 7 R-49 Advanced(U-0.020)as listed in Section A102.2.1, Ceilings below a vented attic and 0.5
R-49 vaulted ceilings with full height of uncompressed insulation extending over the wall
top plate at the eaves.
_..... __..... .........
Prescriptive Path—Single Family 2018 Washington State Energy Code-R 4
Table 406.3—Energy Credits(Single Family)
Option Description Credits:Sts F i
2.AIR LEAKAGE CONTROL AND EFFICIENT VENTILATION OPTIONS
Only one option from Items 2.1 through 2.4 may be selected in this category.
Compliance based on R402.4.1.2: Reduce the tested air leakage to 3.0 air changes per hour
maximum at 50 Pascals or
For R-2 Occupancies,optional compliance based on Section R402.4.1.2: Reduce the tested
air leakage to 0.3 cfm/sf maximum at 50 Pascals and
All whole house ventilation requirements as determined by Section M1507.3 of the
International Residential Code or Section 403.8 of the International Mechanical Code shall
2.1 be met with a high efficiency fan(s)(maximum 0.35 watts/cfm), not interlocked with the 0.5
furnace fan(if present).Ventilation systems using a furnace including an ECM motor are
allowed, provided that they are controlled to operate at low speed in ventilation only
mode.
To qualify to claim this credit,the building permit drawings shall specify the option being
selected and the maximum tested building air leakage,and shall show the qualifying
ventilation system and its control sequence of operation.
Compliance based on Section R402.4.1.2: Reduce the tested air leakage to 2.0 air changes
per hour maximum at 50 Pascals or
For R-2 Occupancies,optional compliance based on Section R402.4.1.2: Reduce the tested
2.2 air leakage to 0.25 cfm/sf maximum at 50 Pascals and 10
All whole house ventilation requirements as determined by Section M1507.3 of the
International Residential Code or Section 403.8 of the International Mechanical Code shall
be met with a heat recovery ventilation system with minimum sensible heat recovery
efficiency of 0.65.1
Compliance based on Section R402.4.1.2:
Reduce the tested air leakage to 1.5 air changes per hour maximum at 50 Pascals or
For R-2 Occupancies,optional compliance based on Section R402.4.1.2: Reduce the tested
2.3 air leakage to 0.25 cfm/sf maximum at 50 Pascals and 1.5
All whole house ventilation requirements as determined by Section M1507.3 of the
International Residential Code or Section 403.8 of the International Mechanical Code shall
be met with a heat recovery ventilation system with minimum sensible heat recovery
efficiency of 0.75. 1
Compliance based on Section R402.4.1.2:
Reduce the tested air leakage to 0.6 air changes per hour maximum at 50 Pascals or
For R-2 Occupancies,optional compliance based on Section R402.4.1.2: Reduce the tested
2.4 air leakage to 0.15 cfm/sf maximum at 50 Pascals and 2.0
All whole house ventilation requirements as determined by Section M1507.3 of the
International Residential Code or Section 403.8 of the International Mechanical Code shall
be met with a heat recovery ventilation system with minimum sensible heat recovery
efficiency of 0.80. Duct installation shall comply with Section R403.3.7.1
_... .. __..-.
'To qualify to claim this credit,the building permit drawings shall specify the optionea recovery bei. ���ed and sh ll
specify the maximum tested building air leakage and shalt show the heat overy ve m ntitatE �e s
Prescriptive Path—Single Family 2018 Washington State Energy Code-R 5
2018 Washington State Energy Code—Residential
Prescriptive Energy Code Compliance for All Climate Zones in Washington
Single Family-New&Additions(effective February 1,2021)
Table 406.3—Energy Credits(Single Family)
------- -- - - - ---._ - -- -- -__----- ---.__ ------ --- - ---- -- -
Option Description Credits:SF
3. HIGH EFFICIENCY HVAC EQUIPMENT OPTIONS
Only one option from Items 3.1 through 3.6 may be selected in this category.
z Energy Star rated (U.S. North) Gas or propane furnace with minimum AFUE of 95%or
3.1 Energy Star rated(U.S. North)Gas or propane boiler with minimum AFUE of 90%.2 1.0
3.2 z Air-source centrally ducted heat pump with minimum HSPF of 9.5.3 1.0
.. ................._._..._..-------............_._..._..-----..-
Closed-loop ground source heat pump;with a minimum COP of 3.3 or
3.32 loop water source heat pump with a maximum pumping hydraulic head of 150 feet'Open1.5
and minimum COP of 3.6.3
— ......... __......._--.........----
Ductless mini-split heat pump system,zonal control: In homes where the primary space
` 3.4 heating system is zonal electric heating, a ductless mini-split heat pump system with a 1.5
minimum HSPF of 10.0 shall be installed and provide heating to the largest zone of the
housing unit.°
---._......_ __ _- .. ........ .................................................. .----.............. ...._.......................................
3.5 2 A .................................................. ......... ......... ......... .........
Ductless split system heat pumps with no electric resistance heating in the primary living
areas.A ductless heat pump system with a minimum HSPF of 10 shall be sized and
installed to provide heat to entire dwelling unit at the design outdoor air temperature.
3.6 z 2.0
To qualify to claim this credit,the building permit drawings shall specify the option being
selected,the heated floor area calculation,the heating equipment type(s),the minimum
equipment efficiency, and total installed heat capacity(by equipment type).
2 An alternative heating source sized at a maximum of 0.5 W/sf(equivalent)of heated floor area or 500 W,whichever is
bigger, may be installed in the dwelling unit.
'To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify
the heating equipment type and the minimum equipment efficiency.
'To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify
the heating equipment type and the minimum equipment efficiency.
4. HIGH EFFICIENCY HVAC DISTRIBUTION SYSTEM OPTIONS
All supply and return ducts located in an unconditioned attic shall be deeply buried in
ceiling insulation in accordance with Section R403.3.7.
For mechanical equipment located outside the conditioned space, a maximum of 10 linear
feet of return duct and 5 linear feet of supply duct connections to the equipment may be
outside the deeply buried insulation.All metallic ducts located outside the conditioned
4.1 space must have both transverse and longitudinal joints sealed with mastic. If flex ducts 0.5
are used,they cannot contain splices.
Duct leakage shall be limited to 3 cfm per 100 square feet of conditioned floor area.
Air handler(s)shall be located within the conditioned space.
HVAC equipment and associated duct system(s) installation shall comply with the
requirements of Section R403.3.7.
Locating system components in conditioned crawl spaces is not permitted under this
option.
4.2 Electric resistance heat and ductless heat pumps are not permitted under this option. 1.0
Direct combustion heating equipment with AFUE less than 80%is not permitted under this
option.
To qualify to claim this credit,the building permit drawings shall specify the option being
selected and shall specify the heating equipment type and shall show the location of the
heating and cooling equipment and all the ductwork.
......... ......... -
Prescriptive Path—Single Family 2018 Washington State Energy Code-R 6
4,
2018 Washington State Energy Code—Residential
Prescriptive Energy Code Compliance for All Climate Zones in Washington
Single Family—New&Additions(effective February 1,2021)
Table 406.3—Energy Credits(Single Family)
Option Description Credits:SF
S.EFFICIENT WATER HEATING OPTIONS
Only one option from Items 5.2 through 5.6 may be selected in this category.Item 5.1 may be combined with any option.
A drain water heat recovery unit(s)shall be installed,which captures waste water heat from
all and only the showers,and has a minimum efficiency of 40%if installed for equal flow or a
minimum efficiency of 54%if installed for unequal flow.Such units shall be rated in
accordance with CSA B55.1 or IAPMO IGC 346-2017 and be so labeled.
5.1 0.5
To qualify to claim this credit,the building permit drawings shall include a plumbing diagram
that specifies the drain water heat recovery units and the plumbing layout needed to install it.
Labels or other documentation shall be provided that demonstrates that the unit complies
with the standard.
Water heating system shall include one of the following:
5.2 Energy Star rated gas or propane water heater with a minimum UEF of 0.80.s 0.5
Water heating system shall include one of the following:
Energy Star rated gas or propane water heater with a minimum UEF of 0.91 or
Solar water heating supplementing a minimum standard water heater.Solar water heating
!will provide a rated minimum savings of 85 therms or 2000 kWh based on the Solar Rating and
:Certification Corporation (SRCC)Annual Performance of OG-300 Certified Solar Water Heating
5.3 'Systems or 1.0
Water heater heated by ground source heat pump meeting requirements of Option 3.3.
To qualify to claim this credit,the building permit drawings shall specify the option being
selected and shall specify the water heater equipment type and the minimum equipment
efficiency and,for solar water heating systems,the calculation of minimum energy savings.
Water heating system shall include one of the following:
Electric heat pump water heater meeting the standards for Tier I of NEEA's advanced water
heating specification or
5.4 For R-2 Occupancy,electric heat pump water heater(s), meeting the standards for Tier I of 1.5
NEEA's advanced water heating specification,shall supply domestic hot water to all units. If
one water heater is serving more than one dwelling unit,all hot water supply and
recirculation piping shall be insulated with R-8 minimum pipe insulation.5
Water heating system shall include one of the following: Electric heat pump water heater
meeting the standards for Tier III of NEEA's advanced water heating specification or
5.5 For R-2 Occupancy,electric heat pump water heater(s), meeting the standards for Tier III of 2.0
NEEA's advanced water heating specification,shall supply domestic hot water to all units. If
one water heater is serving more than one dwelling unit,all hot water supply and
recirculation piping shall be insulated with R-8 minimum pipe insulation.s
Water heating system shall include one of the following:
Electric heat pump water heater with a minimum UEF of 2.9 and utilizing a split system'.
configuration with the air-to-refrigerant heat exchanger located outdoors. Equipment shall'
meet Section 4, requirements for all units, of the NEEA standard Advanced Water Heating'.
Specification with the UEF noted above or
5.6 2.5
For R-2 Occupancy,electric heat pump water heater(s), meeting the standards for Tier III of
NEEA's advanced water heating specification and utilizing a split system configuration with
the air-to-refrigerant heat exchanger located outdoors,shall supply domestic hot water to all
units. If one water heater is serving more than one dwelling unit,all hot water supply and
recirculation piping shall be insulated with R-8 minimum pipe insulation.5
s To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall
specify the water heater equipment type and the minimum equipment efficiency.
Prescriptive Path—Single Family 2018 Washington State Energy Code-R 7
2018 Washington State Energy Code—Residential
Prescriptive Energy Code Compliance for All Climate Zones in Washington
Single Family-New&Additions(effective February 1,2021)
Table 406.3—Energy Credits(Single Family)
Option Description Credits:SF
6.RENEWABLE ELECTRIC ENERGY OPTION
For each 1200 kWh of electrical generation per housing unit provided annually by on-site
wind or solar equipment a 1.0 credit shall be allowed, up to 3 credits. Generation shall be
calculated as follows:
For solar electric systems,the design shall be demonstrated to meet this requirement using
the National Renewable Energy Laboratory calculator PVWATTs or approved alternate by
the code official.
6.1 Documentation noting solar access shall be included on the plans. For wind generation 1.0
projects designs shall document annual power generation based on the following factors:
the wind turbine power curve;average annual wind speed at the site;
frequency distribution of the wind speed at the site and height of the tower.
To qualify to claim this credit,the building permit drawings shall specify the option being
selected and shall show the photovoltaic or wind turbine equipment type,provide
documentation of solar and wind access,and include a calculation of the minimum annual
energy power production.
7.APPLIANCE PACKAGE OPTION
All of the following appliances shall be new and installed in the dwelling unit and shall meet
the following standards:
Dishwasher—Energy Star rated
Refrigerator(if provided)—Energy Star rated
Washing machine—Energy Star rated
7.1 Dryer—Energy Star rated,ventless dryer with minimum CEF rating of 5.2 0.5
To qualify to claim this credit,the building permit drawings shall specify the option being
selected and shall show the appliance type and provide documentation of Energy Star
compliance.At the time of inspection,all appliances shall be installed and connected to
utilities. Dryer ducts and exterior dryer vent caps are not permitted to be installed in the
dwelling unit.
Prescriptive Path—Single Family 2018 Washington State Energy Code-R 8
r1NOUn wun I T GUMMUNYITY SERVICES Permit No.?�L ` 1 bs
PERMIT ASSISTANCE CENTER:
•BUILDING-PLANNING•PUBLIC HEALTH-FIRE MARSHAL RECEIVE
615 W.Alder Street,Siwhcn,WA 98584
Phone Shelton:(360)427-9670 ext.352-Fax:(360)427-7798Phone
ED
Belfair.(360)275 467•Phone Elms:(360)4W-5269 DEC 14 2,220
BUILDING PERMIT APPLICATION 615 W. Airier S I*JC4 ,ul � 1L.
PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATION:
NAME:,'),,.,,4( /`f�M,'<. (n�— (— NAME;Ak,e c u.-. (-(c� C'e u 4-r
_ v-
MAILINGADDRESS: 2y I�(C (`(�„�V., ►J' MAILING ADDRESS:40C,, (o,QI t�f� S,
CITY:T4 G STATE:W A ZIP: yP CITY.' STATEN"t* 7.IP:c Lt K Lf
PHONE#I: Z '3 �a Z - ( � Z Z PHONE:L 56 ccLELL:
PHONE#2: EMAIL:w >'+c rr.3i
EMAIL:c{� ,1 ��c,r.t'4 u c( P rM tH cr;)" L&I REG#`?y\t^Q H C.q 79c, _
PRIMARY CONTACT: OWNER 6 CONTRACTOR❑ 0 HER❑
NAME EMAIL d4,vi--t�tn.,Cavq 4ea/ J"JAI
MAILINGADDRESS CITY 'I,crL=� STATEVV/-I- Z1Pq e
PHONE CELL I- O
PARCEL INFORMATION:PARCEL NUMBER(12 Digit Numbcr)Z2 9(c{-- G�S- OO t'73 ZONING It D
g ?, c�
LEGAL DESCRIPTION(Abbreviated)w r N 4t, -I-v . j ; ra S 1 33• 13LI FIRE DISTRICT U-
SITE ADDRESS q Z.n Me M.��_ Qr CITY
DIRECTIONS TO SITE ADDRESS T
LA-VfL.
IS THE PROJECT WITHIN 300 FT OF SLOPE(S)GREATER THAN 14%: YESK NO❑ SNOW AD;I- aI
IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (c'heckalf rhatapply)
SALTWATER❑ LAKE❑ RIVER/CREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF N STREAM❑
TYPE OF WORK: NEWW ADDITION U ALTERATION❑ REPAIR❑ OTHER ❑
USE OF STRUCTURE(Readeece,Garage,Cornmerclal BIdg,Dc.)_ge j f e i", r
IS USE: PRIMARY I. SEASONAL❑ NUMBER OF BEDROOMS '?-, NUMBER OF BATHROOMS
HEATED STRUCTURE? YES(Whole Hhdr))g YES rparr)s/aJHhk)❑ NO❑ Z 7 r K Li l 14 to 4,,,4 $ro
DESCRIBE WORK�a r✓.,1 ( ct L-7 _C"C r In..a X o1�}#. 1.( 14 a
�OUARE FOOTAGE:
iST FLOOR( L sq,ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.R BASEMENT sq.ft.
DECK sq.ft. COVERED DECK Sq.ft. STORAGE sq.ft. OTHER sq.ft.
GARAGE sq.fL Attached❑ Detached❑ CARPORT sq.ft. Attached❑ Detached❑
MANUFACTURED HOME INFORMATION: /n*4 COPIES OF THE FLOOR PLAN REQUIRED*
MAKE MR v/c +i•-c- MODEL Co Iy e+ti 1,4 A",- YEAR 'ZO I� LENGTH S-6 4
WIDTH 2��4- BEDROOMS BATHS SERIAL NUMBERk0(C t J�i�Q R Pr r3
ENVIRONMENTAL HEALTH:
SEWAGE/SEWERSOURCE: SEPTIC SEWER❑ / NEW EXISTING❑
PLUMBING IN STRUCTURE? YES jA NO❑ Ifivi.attach completed Water Adequacy Form
PERIMETER/FOUNDATION DRAINS PROPOSED? YES 14 NO[] EXISTING SQ.FT.PZ r C
EXISTING BEDROOMS ?-. PROPOSED BEDROOMS TOTAL BEDROOMS
OWNER aclunwMadges that submission of Inaccurate information may result in a stop wort order or permit revocation.Acknowledgement of such Is by
signature below.I declare that I am the owner and I further declare that I am entitled to receive this permit and to do the work as pnposad.I hove
obtained permission from all the necessary parties,Including any easement holder or parties of interest regarding this project. The owner or legal
representative,represents that the information provided is accurate and grants employees of Meson County access to the above described property
and structures)for review and Inspection.This pernitlappllcation becomes null 6 void If work or authorized construction Is not commenced within 180
days or s construction work Is suspended for a period of 180 days.
PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION, INACTIVITY OF THIS
PERMIT APPLICATION OF 180 DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON
COUNTY cone u.oe.as)
�-Z..S= `Z L,Z e)
Signature of OWNER(Must be signed by the OWNER I Date
DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS
BUILDING DEPARTMENT -D I z7-Z I
PLANNING DEPARTMENT
FIRE MARSHAL
PUBLIC HEALTH