Loading...
HomeMy WebLinkAboutBLD2019-00632 Cancelled Addition of Bathroom to 2nd Floor - BLD Permit / Conditions - 8/1/2019 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 (� C E L L E www.co.mason.wa.us B DD2019-00632 ADDITION OR REMODEL- RESIDENTIAL PROJECT DESCRIPTION:ADDING A BATHROOM TO 2ND FLOOR ISSUED: 08/01/2019 SITE ADDRESS: 31 N HIDDEN COVE LN LILLIWAUP EXPIRES: 01/28/,2020 PARCEL: 324242200000 APPLICANT: MARK D&L JANE FISCHER FAMILY TRUST OWNER: MARK D&L JANE FISCHER FAMILY TRUST MARK D&L JANE FISCHER CO-TRUSTEES MARK D&L JANE FISCHER CO-TRUSTEES 31 N HIDDEN COVE LN 31 N HIDDEN COVE LN LILLIWAUP,WA 98555 LILLIWAUP,WA 98555 1.503.580.7325 GENERAL CONTRACTOR'S LICENSE: INTEGRATED NW CONSTRUCTION License: INTEGNC843J1 P O BOX 1008 Expires: 04/21/2020 HOODSPORT,WA 98548 CARALYN-206.310.42 VALUATIONS: FEES: Paid Due R-3 VB Residential, one- 54.00 $6,520.50 Mechanical Base Fee $30.00 $0.00 and two-family Plumbing Base Fee $25.00 $0.00 Mechanical Fees $10.00 $0.00 Change in Tenant-Minor EH $110.00 $0.00 Plan Review Building Permit Fee $156.00 $0.00 Plumbing Fees $36.00 $0.00 Plan Check Fee $80.00 $0.00 State Fee-Residential $6.50 $0.00 Plumbing Revision Base Fee $13.00 $0.00 Total: $6,520.60 Totals : $466.60 $0.00 FIXTURES (sty Mechanical Fixtures W Plumbing Fixtures 1.0000 Spot Vent Fan(s) 1.0000 Bathroom Sink 1.0000 Number of Kitchen Sinks 1.0000 Number of Showers Printed by:Ariane Paysse on:10/03/2019 11:46 AM Page 1 of 5 l T Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us ADDITION OR REMODEL- RESIDENTIAL BLD2019-00632 REQUIRED INSPECTIONS Shearwall Inspection Mechanical Inspection Framing Inspection Insulation Inspection Rough- Plumbing Inspection BLD-Final Inspection CONDITIONS " Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted Classification. Any non-approved change of use or occupancy would result in permit revocation. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * A minimum of 75 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in accordance with IECC/WSEC Section R404.1. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'frorri an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. Printed by:Ariane flaysse on.08/01/2019 01:54 PM Page 2 of 5 i t Mason County I Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us ADDITION OR REMODEL- RESIDENTIAL BLD2019-00632 Installation of heating equipment in a single-family residence shall meet the requirements of the current IECC/WSEC R403, applicable sections of the IRC, and IMC. Heating equipment shall be sized in accordance to ICC/WSEC, Section R403.7. Heating and design load calculations for the purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted practice, including infiltration and ventilation. Design calculations shall be available for inspection during inspection. Referencing IRC M1601.4, all ducts, air handlers, filter boxes, and building cavities shall be sealed. All joints of duct systems and seams shall be made substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Closure systems used with rigid fibrous glass ducts shall comply with UL181A and shall be marked 181A-P for pressure-sensitive tape, 181A-M for mastic or 181 A-H for heat-sensitive tape. Closure systems used with flexible air ducts and flexible air connectors shall comply with UL181 B and shall be marked 181 B-FX for pressure- sensitive tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings shall be mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B and shall be marked 181 B-C. Crimp joints for round metal ducts shall have a contact lap of at least 1-1/2 inches(38 mm) and shall be mechanically fastened by means of at least three sheet-metal screws or rivets equally spaced around the joint. Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation instructions. Duct tape is NOT permitted as a sealant on any ducts. When ducts are located in unheated spaces the ducts hall be insulated to R-8 DUCT TIGHTNESS TESTING shall be conducted by person(s)trained to perform such testing. A signed affidavit documenting test results in accordance to IECC/WSEC Section R403.3.3 shall be provided to the Mason County Building Department prior to the final occupancy inspection. Affidavit forms are available on at the WSU-Energy Program website titles, "Duct Leakage Affidavit"or"Duct Leakage Testing Results(Existing Construction)." Duct tightness testing is not required if the air handler and all ducts are located within the heated space. * When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. Printed by Artanu Paysse on 08/01/2019 01:54 PM Page 3 of 5 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us ADDITION OR REMODEL- RESIDENTIAL BLD2019-00632 " Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at (206)357-2620, ext. 630. * A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer specifications and in accordance with IRC Section R315. Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level of the dwelling. EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations(including addition or alteration of fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or created. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. Printed by.Anane Paysse on 08/01/2019 01:54 PM Page 4 of 5 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us ADDITION OR REMODEL- RESIDENTIAL BLD2019-00632 OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. * Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall reinain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * All wall cavities serving as exterior walls, exposed during construction or remodeling work shall be insulated to the full depth of the wall cavity and inspected prior to covering. Insulation R-values shall be as follows: 2x4 wall cavities min. R-15 and 2x6 wall cavities min. R-21. * Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered. A.) Drainfield/ Reserve requires a 1 Oft setback from all footing/foundations. B.) Septic tank(s) requires 5ft setback from all footing/foundations. C.) No foundation/ Perimeter Drains within 30ft, down gradient of Drainfield/ Reserve area. D.) No Cut Bank(s) (greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws a ces governing this type of work will be complied with whether specified herei o . The grantin f a permit does not presume to give authority to violate or cancel the provisions any her s /local aw regulating construction or the performance of construction. Issued By J Contractor or Authorized Agent: C/ ` Date: / I9 Printed by:Ariane Paysse on 08/01/2019 01:54 PM Page 5 of 5 ,z1 m fn n n O �TZI -ZI m n y n n v m N 0 0 cn �» p m 0 1 r Z w v� C) N r 3 Z Z m x N Cl) G) x N O m x 90 o C° m r- o 0 O ` O O zz CD 0')m m N z 0 m O "U ao z n r A Cn n o � � D C C' G m 3 O z r- G C 0 O_ CYI 3 �1 v v -0 T m m m o O D Z � � 0 0 Cl) n W o� (n 0 rn x° 90 N n x �z Qo C CD � O c � r _{ � � 0) � �+ m � o (n ---I00 0 w p D Z Z 0 0 0 O m (D C Z x CD M -No m C� m (W1io`G �. n O Z cn N-� 1 z G a s 9 O D � o _ o m �u CD m O r O z W 0 m CD _ z —I = O m 1 O Z D m m z T D r O C° _ = O ul O O z cn z m m 3 o 300 D W �z o i v W N CT ' • i M m M BAC33R CO _ SIN 0) O 24" _ TOIL,STD 58156" 33 N 91131, cn_ 18 mw / _ 108" All dimensions_size designations This is an original design and must Designed:9/16/2019 given are subject to verification on not be released or copied unless Printed:9/30/2019 job site and adjustment to fit job applicable fee has been paid or job conditions. order placed. I __Bathroom Design w Wet Bar All Drawing#: 1 No Scale. i • i 9 1 1311 16 30" 58 511 16 31 �. - 5216" _ __ 36" i N F3 W3024 CO CD w, N 1 In CO F3 BS30 .REF.24.S'F BAC33R CO 30 25 " 33" 3 16 _ '17-2 11 - 27 6,� 46 8tv All dimensions_size designations This is an original design and must Designed:9/16/2019 given are subject to verification on not be released or copied unless Printed:9/30/2019 job site and adjustment to fit job applicable fee has been paid or job conditions. order placed. Bathroom Design w Wet Bar El 2 Drawing#: 1 I No Scale_ Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us B DD2019-00632 ADDITION OR REMODEL- RESIDENTIAL PROJECT DESCRIPTION: ADDING A BATHROOM TO 2ND FLOOR ISSUED: 08/01/2019 SITE ADDRESS: 31 N HIDDEN COVE LN LILLIWAUP EXPIRES: 12/15/2021 PARCEL: 324242200000 APPLICANT: MARK D& L JANE FISCHER FAMILY TRUST OWNER: MARK D&L JANE FISCHER FAMILY TRUST MARK D & L JANE FISCHER CO-TRUSTEES MARK D&L JANE FISCHER CO-TRUSTEES LILLIWAUP,WA98555 LILLIWAUP,WA98555 1.503.580.7325 GENERAL CONTRACTOR'S LICENSE: INTEGRATED NW CONSTRUCTION License: INTEGNC843J1 P O BOX 1008 Expires: 04/21/2022 HOODSPORT,WA98548 206.310.4239 VALUATIONS: FEES: Paid Due R-3 VB Residential, one- 54.00 $6,520.50 Mechanical Base Fee $30.00 $0.00 and two-family Plumbing Base Fee $25.00 $0.00 Mechanical Fees $10.00 $0.00 Change in Tenant- Minor EH $110.00 $0.00 Plan Review Building Permit Fee $156.00 $0.00 Plumbing Fees $36.00 $0.00 Plan Check Fee $80.00 $0.00 State Fee-Residential $6.50 $0.00 Plumbing Revision Base Fee $13.00 $0.00 Total: $6,520.50 Totals : $466.50 $0.00 FIXTURES Qty Mechanical Fixtures Qty Plumbing Fixtures 1.0000 Spot Vent Fan(s) 1.0000 Bathroom Sink 1.0000 Number of Kitchen Sinks 1.0000 Number of Showers Printed by:Corey Bennett on:06/23/2021 03:58 PM Page 1 of 5 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us ADDITION OR REMODEL- RESIDENTIAL BLD2019-00632 City Plumbing Fixtures 1.0000 Number of Toilets REQUIRED INSPECTIONS Shearwall Inspection Insulation Inspection Framing Inspection BLD-Final Inspection Rough- Plumbing Inspection Shower Pan Mechanical Inspection Progress Inspection CONDITIONS * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. Printed by:Corey Bennett on:06/23/2021 03:58 PM Page 2 of 5 Mason County y , Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us ADDITION OR REMODEL- RESIDENTIAL BLD2019-00632 * A minimum of 75 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in accordance with IECC/WSEC Section R404.1. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. * Installation of heating equipment in a single-family residence shall meet the requirements of the current IECC/WSEC R403, applicable sections of the IRC, and IMC. Heating equipment shall be sized in accordance to ICC/WSEC, Section R403.7. Heating and design load calculations for the purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted practice, including infiltration and ventilation. Design calculations shall be available for inspection during inspection. Referencing IRC M1601.4, all ducts, air handlers, filter boxes, and building cavities shall be sealed. All joints of duct systems and seams shall be made substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Closure systems used with rigid fibrous glass ducts shall comply with UL181A and shall be marked 181A-P for pressure-sensitive tape, 181A-M for mastic or 181 A-H for heat-sensitive tape. Closure systems used with flexible air ducts and flexible air connectors shall comply with UL181 B and shall be marked 181 B-FX for pressure- sensitive tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings shall be mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B and shall be marked 181 B-C. Crimp joints for round metal ducts shall have a contact lap of at least 1-1/2 inches (38 mm) and shall be mechanically fastened by means of at least three sheet-metal screws or rivets equally spaced around the joint. Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation instructions. Duct tape is NOT permitted as a sealant on any ducts. When ducts are located in unheated spaces the ducts hall be insulated to R-8 DUCT TIGHTNESS TESTING shall be conducted by person(s)trained to perform such testing. A signed affidavit documenting test results in accordance to 1ECC/WSEC Section R403.3.3 shall be provided to the Mason County Building Department prior to the final occupancy inspection. Affidavit forms are available on at the WSU-Energy Program website titles, "Duct Leakage Affidavit" or"Duct Leakage Testing Results (Existing Construction)." Duct tightness testing is not required if the air handler and all ducts are located within the heated space. * When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. Printed by:Corey Bennett on:06/23/2021 03:58 PM Page 3 of 5 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us ADDITION OR REMODEL- RESIDENTIAL BLD2019-00632 * The plan review checklist and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at (206)357-2620, ext. 630. * A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer specifications and in accordance with IRC SectionR315. Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level of the dwelling. EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations (including addition or alteration of fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or created. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. Printed by:Corey Bennett on:06/23/2021 03:58 PM Page 4 of 5 Mason County Mason County - Division of Community Development "- 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us ADDITION OR REMODEL- RESIDENTIAL BLD2019-00632 * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. * Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * All wall cavities serving as exterior walls, exposed during construction or remodeling work shall be insulated to the full depth of the wall cavity and inspected prior to covering. Insulation R-values shall be as follows: 2x4 wall cavities min. R-15 and 2x6 wall cavities min. R-21. * Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered. A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations. B.) Septic tank(s) requires 5ft setback from all footing/foundations. C.) No foundation/Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area. D.) No Cut Bank(s) (greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Corey Bennett on:06/23/2021 03:58 PM Page 5 of 5 MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 -! �QMM�N�� �������c`7 SHELTON:360-427-9670,EXT 352 r BELFAIR:360-275-4467,EXT 352 Building,Planning,Envircrimenial IIwlth,CommunityHealUi ELMA:360-482-5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php Permit Number BLD2019-00632 Date Issued 08/01/2019 Issued B5�& r Project ADDING A BATHROOM TO 2ND FLOOR Site Address 31 N Hidden Cove Ln Applicant MARK D&L JANE FISCHER FAMILY TRUST Contractor INTEGRATED NW CONSTRUCTION Contractor Phone 206.310.4239 Primary Code UPC IBC, IRC,IFC,IEC,IMC,& Type Permit Type ADDITION OR REMODEL- Occupancy RESIDENTIAL -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. "THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED." PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing 3 \2.2O to Yy Groundwork Mechanical Plumbing \ \ Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other sVN0Ktrs4 90^ G\-%0-10 NN Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building 4' Manufactured Setbacks Setup Home Concrete Foot/ Runners Final Other