Loading...
HomeMy WebLinkAboutBLD2019-01081 Cancelled MFG Home Replacement - BLD Permit / Conditions - 11/19/2019 Mason County ` Mason County - Division of Community Development `1 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us Cri I U' L_. L . 0 F 9-01081 MANUFACTURED HOME REPLACEMENT DESCRIPTION: REPLACEMENT MFG HOME (ALLYNVIEW ISSUED: 11/19/2019OME PARK)ESS: 18289 E STATE ROUTE 3 ALLYN EXPIRES: 05/17/2020 PARCEL: 122205077001 APPLICANT: ALVIN FORS REVOCABLE TRUST OWNER: ALVIN FORS REVOCABLE TRUST P O BOX 2035 P O BOX 2035 ALLYN,WA 98524 ALLYN,WA 98524 1.360.275.3120 GENERAL CONTRACTOR'S LICENSE: FUTURE HOMES OF BREMERTON License: FUTURHB812JS 4021 W STATE HWY 15 Expires: 07/09/2021 BREMERTON,WA 98312 1.360.479.4663 FEES: Paid Due Building Plan Review/Change of $110.00 $0.00 Use- Onsite Sewage Modular/Manufactured Home $275.00 $0.00 Fee-2nd half collected at ready to issue Modular/Manufactured Home $275.00 $0.00 Fee - 1st half collected at submittal Planning Review Fee $240.00 $0.00 State Fee-Residential $6.50 $0.00 Totals : $906.50 $0.00 REQUIRED INSPECTIONS Setback Inspection Set-Up Inspection Footing Inspection BLD-Final Inspection CONDITIONS Printed by:Julia Kerkes on:11/19/2019 09:56 AM Page 1 of 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MANUFACTURED HOME REPLACEMENT BLD2019-01081 * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * Any retailer, manufacturer or contractor who installs a manufactured home warrants that the manufactured home is installed in accordance with the State Installation code, chapter 296-150M WAC. All installers hired to do installation work shall be certified manufactured home installers and shall be present to supervise the installation of all on-site work. An Installer Tag shall be posted on site giving the certification number and signature of the certified installer responsible for each major part of the installation. RCW43-63B.090 An approved Installer cerification tag shall be placed on the end of the manufactured home directly above or below the HUD certification tag or temporarily located in plain site within three feet of the home's front entry. There shall be one certification tag for each certified installer accounting for the work that each installer performed or installed. Certification number and signature of the certified installer responsible for each major part of the installation. WAC365-210 * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * Mason County has four areas with ground snow loads between 25#-55#. The owner/agent of this permit acknowledges that if the unit permitted under this permit does not meet the area snow load rating, there is a potential for failure due to weight accumulation beyond that of the design criteria for the unit. If you are uncertain please contact Department of Community Services for snow load or vist our website at www.co.mason.wa.us. * The foundation/footing must be placed on undisturbed, firm-native soil. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. * The installation permit shall be displayed in clear view of the site access road. The approved site plan and other applicable instructions, including installation instructions, shall be available in this location OR placed in the location specified by WAC 296-150M-655. Support configuration shall be clearly marked in the installation instructions. * All property lines shall be clearly identified at the time of foundation inspection. * If you are installing a manufacturing home and no longer have the installation manual for the home, you must use the instructions of the American National Standards Institute (NCSBCS/ANSI A225.1). * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. Printed by:Julia Kerkes on:11/19/2019 09:56 AM Page 2 of 4 l Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MANUFACTURED HOME REPLACEMENT BLD2019-01081 * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * This permit is for the placement and installation of the manufactured home only and does not imply approval or review for any other items indicated on the plot plan. * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. * Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. * When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at (206)357-2620, ext. 630. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. Printed by:Julia Kerkes on:11/19/2019 09:56 AM Page 3 of 4 Mason County Mason County - Division of Community Development � 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MANUFACTURED HOME REPLACEMENT BLD2019-01081 * REQUIRED INSPECTIONS (Footing Inspection-prior to pour(set-up manual must be on-site), Set-up Inspection-prior to skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required inspections. If the required inspections are not requested, inspected and signed off(approved) by the inspector in the prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by the Mason County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable practices or problems that have been discovered. Until resolution of any/all problems no occupancy (Final Inspection)will be granted for the residence. OWN ER/CONTRACTOR(indicate which) * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: 411fllt� > Contractor or Authorized Agent: Date: Printed by:Julia Kerkes on:11/19/2019 09:56 AM Page 4 of 4 cp k k k Z k � \ \ \ » ƒ / / % 2 2 2 m f � : 0 0 0- \ m m \ E > � I/ M / \ \ \ @ �u 2 0 � 7 0 / -4 2 C / ® - / g m / / / 00\cn 2 f > \ , 0 / z ® n z k k Ul 7 ` m m m 2 2 �> z $ $ 0 0 Cl) w a CA) % _ / o 0 o � k $ o m m g � . 2 2 / / -4 \ g �� q + / 4 0 \ -4 00 0 0 z o 0 : 0 c / k E m a / m _ � o _ 9 / % 2 �� > • 2 0 / 7 m E 7 f / 00 � & 2 _ ƒ \ � I $ »O < % R � k m ƒ . 7 � \ CTI N) z z o m m = 0 \ CD c = (D \ CD ) 2 MASON COUNTY 360-427-9670 Shelton ext.352 360-275-4467 Belfair ext.352 COMMUNITY SERVICES 360-482-5269 Elma ext.352 Building,Planning, Environmental Health,Community Health 615 W.Alder St.Bldg.8 - Shelton,WA 98584 www.co.mason.wa.us CORRECTIONANZ03PECTION REPORT PERMIT/CASE NUMBER.?A6 ").O \C:I \ ko?)k ADDRESS/LOCATION:� 1 l c�3 � CA FINDINGS: Items listed above must be corrected to gain compliance. ❑ THIS IS NOT A COMPLETE INSPECTION ❑ This structure has been inspected by Mason County Building Department and the items listed above are in VIOLATION of Mason County laws and/or ordinances. ❑ Call for re-inspection when corrections are made before proceeding with any further work. 'Make corrections, items will be checked on the next inspection. OK toQrfi( e c o Date: - `� ❑ Please contact our office regarding possible Department: structural damage incurred by recent _ _ "natural/man made"disasters.This is NOT a Inspector:_ �irr CORRECTION NOTICE. DO NOT REMOVE THIS TAG MCC14.12 Chris & Sang Ki PLANNING 18289 E State Route 3 Sp# 42 2 Acct#1222050770) 'bIdaa�q •QivB I 50, PLA NING: U h A I i U1 L Vl,l.i ) 28 ALL SETBACKS ARE MEASURED u teat( lit rIV� FROM THE FURTHEST Existing PROJECTION OF THE BUILDING Shed of Ort I� Uhl+ 8x10 — (/G/y�\11 Power PeA. V Cbrno , ction Sewer Connection Ex , . k b <x De k O Slat Proposed �A-nufactured Home'2Wx 48' �( 3 bed,z Bath < RECEIVED (Dx * r, SEP 2 0 2019 �ar3,a 615 W. Alder Street lit = 20' APPROVED MASON COUNTY DCD P°La4NNING SITE PLAN REQUIRED TO 6E :,N SITE CHANGES SUBtJET TO APPROVAL Syl —�8� �,orS �(vd t4 i e f /222C3-so—7 766 MUST COMPLY WITH _ CHANGES THESE PLANS MUST BE ON THE JOB SITE SUBMIT CHANGES FOR APPROVAL. FOR INSPECTION PERMIT CONDITIONS PRIOR TO PERFORMING WORK MUST MEET ALL CURRENT APPROVED WASHINGTON STATE CODES MASON BUILDING INSPECTOR CHANGES SUBJECT TO APPROVAL DATE Documents attached to approved plans: Site Plan U e S Plan review checklit; ___VE-S ply Engineering: Y W Lateral Vertical Number of pages— 1GcQ M e ak s•k Pcr 4� o f Joy ; �, op Eagle 28483SIFleetwood Homes Page 1 of 3 AM 0:�:� PLANNING Fleetwood -NOMESt. 1-877-413-9$49 Eagle 28483S RECEIVED 3 Bedrooms, 2 Bathrooms, 128o sq.ft. SEP 2 0 2019 Building Method: Manufactured ■ Series: Eagle Series 615 W. Alder Street 1 KITCWN 'worFK 0 �qy��,, DEDKeJ�1y ` -- � AOMA o_i LOW AVU rr+ D'DIUVW 12 AMIS TF1C DEPV�ONf Y�, _^ � tr.Tit�afl. kr :zdYdfA Frltilo0lyI+ol► T A IuGHrs RESf.!<Y£K1*k D Standard Floor Plan Floor Plans and Options https://www.fleetwoodhomes.com/floor-plan/fp-210-EG-28483 S/?longitude=-122.829802... 9/20/2019 MASON COUNTY COMMUNITY SERVICES Permit No 1612DI IC - PERMIT ASSISTANCE CENTER: RECEIVED •BUILDING •PLANNING •PUBLIC HEALTH•FIRE MARSHAL 615 W.Alder Street,Shelton,WA 98584 SEP 2 0 2019 Phone Shelton:(360)427-9670 ext. 352•Fax:(360)427-7798 Phone Belfair:(360)275-4467•Phone Elma:(360)482-5269 �+ 615 W. Alder Street U I LD I NGILDING PERMIT APPLICATION PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATION: NAME: -�NN , - ;3 c-3 NAME: 4 U+tJ MAILING ADDRESS: 14Z641 E 3I.1 MAILING ADDRESS: CITY: ,At , STATE:W#v ZIP:5,95�8 CITY: 13(eMt,r-}oi-- STATE: 1, Ik ZI : 9g312.- PHONE#1: 3 'u' — 3 12y PHONE: - - 3 CELL: PHONE#2: EMAIL : U}UrGb rt.Mtr4or., IQ 40 1•CO ef, EMAIL: L&I REG#Z'GFUT UR•Aff laZES EXP. I/-9—/k PRIMARY CONTACT: OWNER ❑ CONTRACTOR❑ OTHER` NAME TLrh N11 1O EMAIL MAILING ADDRESS 4021 5-Aak 4wN 16 W CITY 0 ei STATE WiN ZIP PHONE 3 6o 4-A— Ilo63 CELL 3!.O— 434 911 PARCEL INFORMATION: PARCEL NUMBER(12 Digit Number) SO-11 O b l ZONING LEGAL DESCRIPTION(Abbreviated) FIRE DISTRICT SITE ADDRESS I Q U 9 E Ski* 12pAr3 Sn 4- 41 CITY AWAY\ DIRECTIONS TO SITE ADDRESS -Ta t_¢ SkG, " . -3 �Ddlr L W&X1 bej 0 ', aaur fie + ,, 5e tom. E tAke-1&4 Or- IS THE PROJECT WITHIN 300 FT OF SLOPE(S)GREATER THAN 14%: YES[] NO X IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (Check all that apply): SALTWATER ❑ LAKE ❑ RTVER/CREEK ❑ POND ❑ WETLAND ❑ SEASONAL RUNOFF ❑ STREAM ❑ TYPE OF WORK: NEW ❑ ADDITION ❑ ALTERATION ❑ REPATR ❑ OTHER JR ReplaU~A USE OF STRUCTURE(Residence,Garage,Commercial Bldg,Etc.) pr,M�Ir'1 942s,"L --1141 TS USE: PRIMARY JJ SEASONAL ❑ NUMBER OF BEDROOMS 3 NUMBER OF BATHROOMS e1• HEATED STRUCTURE? YES (Whole Bldg)gL YES (Part(sj g1'Bldg) ❑ NO ❑ DESCRIBE WORK W" htt hoe4e. WIL\ YW�J 'a►! tC�-1� ��^'^ �{�tL� � � SQUARE FOOTAGE: (proposed) 1ST FLOOR ^o- a sq. ft. 2ND FLOOR sq. ft. 3RD FLOOR sq. ft. BASEMENT sq. ft. DECK sq.ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq.ft. GARAGE sq. ft. Attached❑ Detached❑ CARPORT sq, ft. Attached❑ Detached❑ MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED* MAKE-17t-eJA W o b1 MODEL " YEAR LENGTH WIDTH_ Ztp_ BEDROOMS 3 _ BATHS Z SERIAL NUMBER T60 ENVIRONMENTAL HEALTH: EPTIC SEWER / NEW EXISTING SEWAGE/SEWER SOURCE: S ❑ � ❑ PLUMBING IN STRUCTURE? YES K NO ❑ If yes, attach completed Water Adequacy Form PERIMETER/FOUNDATION DRAINS PROPOSED? YES ❑ NQQ EXISTING SQ.FT. EXISTING BEDROOMS, __ _ PROPOSED BEDROOMS TOTAL BEDROOMS OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner and I further declare that I am entitled to receive this permit and to do the work as proposed.I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project. The owner or legal Name Parcel# ( 22--.OS o1-N o b \ BLD#oJQj�a AP;o BUILDING Mason County Department of Community Development SEP 2 0 2019 Small Parcel Stormwater Management Application/Workshqi 6pMgg ,IcWfr2atreet Per Mason County Code,Title 14, Chapter 14.48 a stormwater site plan is required whenever a building application is made for residential development, or redevelopment', with more than 2,000 square feet of impervious surface'. 'Redevelopment means,on an already developed site,the creation or addition of impervious surfaces,structural development including construction, installation or expansion of a building or other structure,and/or replacement of impervious surface that is not part of a routine maintenance activity,and land disturbing activities associated with structural or impervious redevelopment. 'Common impervious surfaces include,but are not limited to,rooftops,walkways,patios,driveways,parking lots or storage areas, concrete or asphalt paving,gravel roads,packed earthen materials,and oiled,macadam or other surfaces which similarly impede the natural infiltration of stormwater. Open,uncovered retention/detention facilities shall not be considered as impervious surfaces. To Calculate Impervious Surfaces Please Complete This Table Surface Type Length X Width = Area *All dimensions in feet Buildings y X I-<j X = Measurements for buildings are taken at the perimeter of the farthest projections (example: X = eaves/gutters) X = Driveways 1 X X = Length of drive begins at the right of way X = Parking Areas X X Any paved, gravel or packed area per definition above table X = Patios/Walks = /�' = Any paved, gravel or packed area per definition L Ic above table Others X = 6 X = If the total impervious area of the proposed site X = development is greater than 2000 square feet a Small Parcel Stormwater Site Plan is Required Total Impervious Surface Area (sum of all areas) r If the Total Impervious Surface Area is LESS THAN 2000 Square Feet,please read, acknowledge and sign below. Based Upon the information you have provided a Stormwater Site Plan IS NOT required for this development activity. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owner's legal representative,or the contractor. I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- described property for review and inspection as may be required. 11 Owner/Agent/Con tractor(circle one)Date: 4�,U1Ikt-\ If the Total Impervious Surface Area is GREATER THAN 2000 Square Feet, please read, acknowledge and sign the information provided on page 2 of 2. Pagel of 2