HomeMy WebLinkAboutBLD2019-01130 Dock, Ramp Final - BLD Permit / Conditions - 4/8/2021 ` Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
B DD2019-01130 BULKHEAD OR DOCK- RESIDENTIAL
PROJECT DESCRIPTION: 10'X 16' FLOATING DOCK& RAMP ISSUED: 02/12/2020
CONFIGURATION
SITE ADDRESS: 1110 W CUSHMAN RIDGE DR SHELTON EXPIRES: 08/25/2021
PARCEL: 423315001023
APPLICANT: WESLEY A&JENNIFER A SKENFIELD OWNER: WESLEY A&JENNIFER A SKENFIELD
P O BOX 7409 P O BOX 7409
TACOMA,WA 98417 TACOMA,WA 98417
CONTRACTOR: INTEGRATED NW CONSTRUCTION
P O BOX 1008
HOODSPORT,WA 98548
206.310.4239
GENERAL CONTRACTOR'S LICENSE: INTEGRATED NW CONSTRUCTION License: INTEGNC843A
P O BOX 1008 Expires: 04/21/2021
HOODSPORT,WA 98548
206.310.4239
VALUATIONS: FEES: Paid Due
Project Valuation (BID, 1500.00 $1,500.00 State Fee-Residential $6.50 $0.00
ESTIMATION..) Building Permit Fee $156.00 $0.00
Plan Check Fee $80.00 $0.00
Total: $1,500.00 Totals : $242.50 $0.00
REQUIRED INSPECTIONS
BLD-Final Inspection Progress Inspection
CONDITIONS
Printed by:Corey Bennett on:03/22/2021 04:04 PM
Page 1 of 3
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
BULKHEAD OR DOCK- RESIDENTIAL BLD2019-01130
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
" All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
Printed by:Corey Bennett on:03/22/2021 04:04 PM
Page 2 of 3
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.masonma.us
BULKHEAD OR DOCK- RESIDENTIAL BLD2019-01130
hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:
Printed by:Corey Bennett on:03/22/2021 04:04 PM
Page 3 of 3
MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352
BELFAIR:360-275-4467,EXT 352
Buildln%Plarmin%Environmental Heelth.CommunityHealth ELMA•360-482-5269,EXT 352
www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY"
To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php
Permit Number BLD2019-01130 Date Issued 02/12/2020 Issued By
Project 10'x 16'floating dock&ramp configuration
Site Address 1110 W CUSHMAN RIDGE DR
Applicant WESLEY A&JENNIFER A SKENFIELD
Contractor INTEGRATED NW CONSTRUCTION
Contractor Phone 206.310.4239
Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type
Permit Type BULKHEAD OR DOCK- Occupancy
RESIDENTIAL
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
"THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED"
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
UnderFloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building ({-iR_Zt .) rZ-
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
3"Z3-2( �TL t�Ha ( . � Cou—�✓�c v —o �.ov'r ek?7*0valaloq- i-e
4,4 a iw ve5.s /��oa f— 4 a!'� �+'tr x ee,O,o
3628 South 35"'Street
Tacoma,Washington 98409-3192
TACOMA POWER TACOMA PUBLIC UTILITIES
r,�ccp+ rua�.rc vax�,r�i�z
April 1, 2021
Wes and Jennifer Skenfield VIA EMAIL
PO Box 7409
Tacoma, WA 98417
wes(aD-skenfield.net
Subject: Skenfield - Post Construction Inspection
Dear Mr. and Mrs. Skenfield,
Tacoma Power inspected your recently completed shoreline structures and required debris
removal associated with your development lot, Division WS 1 Block 1 Lots 22 & 23, Lake
Cushman (Tax Parcel Nos.: 42331-50-01022 &01023), on March 25, 2021. This letter
confirms your compliance with the terms and conditions of your Tacoma Power
construction License at the time of inspection.
Please proceed with obtaining your final inspection with Mason County and provide a copy of
the County's final approval to Tacoma Power. Once received, you will be placed in the queue
for issuance of a 5-year Shoreline Use Permit for those compliant structures and uses you have
on Tacoma Power property.
If you are planning any other work below the 742-foot elevation line, or within the 10-foot lateral
strip above 742 feet, please contact me prior to initiating any work. If you have any questions or
concerns please feel free to contact me at (253)441-4180 or email at
wwright(a-)-cityoftacoma.org. Thank you for working with Tacoma Power to bring your structures
into compliance.
Sincerely,
Wynnae Wright
Shoreline and Lands Coordinator
Tacoma Power
Cc: T. Nelson,Wildlife and Lands Manager
K. Wilson, Lands Officer
D. Bishop, Senior Real Estate Specialist
Integrated NW Construction, Authorized Agent
Lake Cushman Maintenance Company